GTR 77033283
Tenders Are Invited For Reconstruction Of Building No. 5 - 1St Floor, Staircases
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
77033283
Tendering Authority
Subscribe to view
Tender No
ZP-3502/12/2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Building No. 5 - 1St Floor, Staircases
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
08-03-2024
Closed
Work Detail
Iii. Description Of The Subject Of The Order1. Modernization Of The Corridor, Toilets And Staircases, Installation Of Snow Barriers.2. Execution Of Internal Electrical And Telecommunications Installations, Water And Sewage Systems. Lightning Protection3. Construction Of A Hydrant Installation4. Construction Of A Cctv System (Installation, Cameras) Location: Sp Zoz Jarosław Ul. Kościuszki 18 Jarosław – Building No. 5A. Expected Scope Of Works Scope Of Works To Be Performed In The Current Tender: Modernization Of The Corridor, Staircases, Installation Of Snow Barriers, Execution Of Electrical, Telecommunications And Water And Sewage Installations. Lightning Protection . The Works Are Performed According To Project Reconstruction Of Building No. 5 In The Specialized Psychiatric Health Care Complex. Reconstruction Project According To By Zakład Usług Projektowych Grzegorz Kałamarz Ul. Krakowska 5, 37-200 Przeworsk, Approved By The Starosta Of Jarosław With The Decision On Building Permit No. 59/2016, Ref. No.: Ab.6740.831.2015 Of February 12, 2016 And The Design According To. Authored By Center Projekt Marcin Rymarz Ul. Józefa Poniatowskiego 34, 37-500, Jarosław. The Works Are Related To The Modernization Of Building No. 5. Rooms For This Purpose Are Located On The First Floor, Staircases Of The Building And The Roof. The Investment Will Consist In Carrying Out The Following Works: 1. Modernization Works1.1 Staircases - Renovation Of Walls1.1.1 Removal Of Existing Oil Paneling1.1.2 Cleaning Of Wall And Ceiling Surfaces1.1.3 Replenishment Of Internal Plasters 1.1.4 Priming Of Substrates1.1.5 Filling Of Ceilings And Walls1.1.6 Painting Of Ceilings1.1.7 Execution Of Wall Cladding 1.1.8 Installation Of Ei30 Fire Doors In Accordance With The Design1.2 Staircases 1.2.1 Replacement Of Balustrades With Chrome-Nickel Balustrades1.2.2 Arrangement Of Granite Slabs On Landings And Plinths1.3 Rooms, First Floor - Suspended Ceiling, Installation Of Half-Light Windows 1.3.1 Removal Of Fanlights Made Of Half-Glass Windows From The Inside Of The Room 1.3. 2 Coffered Ceiling1.3.3 Replenishing Walls And Plasters (Existing Defects And Cast-In Electrical Installations)1.3.4 Installation Of Water Treatment Filters1.4 Corridor On The 1St Floor - Renovation Of Walls, Suspended Ceiling1.4.1 Partition Walls Made Of Plasterboards, Covering One-Sided, Single-Layer Walls - Installation Of Windows1.4.2 Cleaning Of Wall Surfaces1.4.3 Removal Of Existing Oil Paneling1.4.4 Priming Of Substrates1.4.5 Filling Of Walls1.4.6 Cassette Ceiling1.4.7 Execution Of Wall Cladding To Full Height1.4.8 New Doors Between Rooms 107 And 109 (In Accordance With Project)1.5 Corridor On The 1St Floor - Renovation Of Floors1.5.1 Removing Existing Floors Together With A Plinth1.5.2 Leveling Layers Under The Floors, 1.5.3 Laying Granite Slabs On The Floor And Plinth1.6 Renovation And Reconstruction Of Sanitary Facilities (1St Floor)1.6.1 New Floor – Ceramic Tiles 1.6.2 Renovation Of Walls And Ceilings (Demolition, Construction Of New Ones)1.6.3 Walls – Ceramic Tiles To Full Height1.6.4 Reconstruction Of The Sanitary Installation New Fittings1.6.5 Removal Of Fanlights From The Internal Side 1.6.6 Installation Of New Door Joinery1 .6.7 Installation Of Hpl System Walls1.7 Roof - Snow Barriers1.7.1 Installation Of Snow Barriers 2. Works - Electrical And Telecommunications Installations2.1 Dismantling Of Old Installations.2.2 Cctv System Recorder 2.3 Installation Of A Video Monitoring System, Installation Of Cameras2.4 Installation Of Switchboards With Equipment (Rg, R4, R5, R6 Switchgear).2.5 Electrical Installations, Installation Of Fixtures, Plug Sockets, Switches, Emergency And Evacuation Lighting2.9 Internet Sockets 2.10 When Carrying Out Work, Adapt The Arrangement Of Sockets To The Existing Layout Of Rooms And Furniture 2.13 Installation Of A Lightning Protection System Along With Research3. Works - Hydrant Installation 3.1 Installation Of Hydrants (According To The Design) Along With Tests Note: Renovation Works Must Be Organized In A Way That Ensures Continuous Operation Of The Administration Departments Located In Building No. 5. The Works Must Not Create Difficulties In The Use Of The Building Or Access To And Access To The Building From Side Of The Hospital Area And From The Street. Kosciuszko. Building No. 5 Is Entered In The Register Of Monuments.1. The Detailed Scope Of Works Is Included In The Design Documentation Prepared By Zakład Usług Projektowych Grzegorz Kałamarz Ul. Krakowska 5, 37-200 Przeworsk, Approved By The Starosta Of Jarosław With The Decision On Building Permit No. 59/2016 Ref. No.: Ab.6740.831.2015 Of February 12, 2016 And Supplements To The Project Acc. Authored By Center Projekt Marcin Rymarz Ul. Józefa Poniatowskiego 34, 37-500, Jarosław.2. The Bill Of Quantities Is An Auxiliary Document To Describe The Subject Of The Order.3. A Detailed Description Of The Subject Of The Order (Scope Of Works) And The Terms Of Their Implementation Are Included In The Documentation Attached To The Terms Of Reference, In Particular: A) Design Documentation, B) Technical Specifications For The Execution And Acceptance Of Works, C) Bills Of Quantities.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1c0fbdb6-23db-47cb-a9c2-5ec3eec2ff06.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.