This Assignment Concerns The Supply, Expansion And Installation And Operational Installation And Maintenance Of Loggers And Solar Weir And Inlet Controls, Which Measure The Following Process Values: Water Level Precipitation Electrical Conductive Power Groundwater Level Soil Moisture Content In Addition To Delivery, The Loggers Must Be Installed , Tested And Connected Ready For Operation According To The Protocol As Described By The Contractor In The Action Plan. A Large Number Of The Current Loggers And Sensors Have Been Replaced In Recent Years. In The Coming Years, Rijnland Expects To Expand The Existing Monitoring Network Or Occasionally Replace It In The Event Of Theft Or Lightning Strike, For Example. The Maximum Scope Of The Framework Agreement For The Supply And Operational Installation Of Loggers And Solar Weir And Inlet Controls For Water Systems Concerns: Number Of Locations/Loggers Type Of Logger/Measurement 56 Loggers Surface Water Level 20 Loggers Electrical Conductivity 28 Loggers Groundwater Level *) 28 Loggers Soil Moisture *) 8 Locations Precipitation Meter 12 Locations Solar Weir Or Inlet Control *) A Combination Of The Measurement Of Groundwater Level And Soil Moisture Can Occasionally Be Combined In One Logger. The Assignment Also Includes The Maintenance Of All Purchased Loggers And Solar Weir And Inlet Controls Within The Framework Agreement. Maintenance Continues Until The End Of The Life Of This Equipment Within The Term Of The Maintenance Agreement.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.