GTR 76724776

Tenders Are Invited For Construction Of A Sports Field In Olszowa

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
76724776
Tendering Authority
Subscribe to view
Tender No
WR.271.6.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Sports Field In Olszowa
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
05-03-2024 Closed
Work Detail
The Subject Of The Order Is The Construction Of A Sports Field With An Artificial Epdm Polyurethane Surface At The Primary School In Olszów. The Task Was Carried Out As Part Of The Task Entitled Construction Of A Sports Field In Olszowa. Construction Works Related To The Investment Will Be Carried Out On The Plot With Registration Number 625, Olszowa District, Commune. Kępno. The Task Involves The Construction Of A Multi-Purpose Sports Field In The Shape Of A Rectangle With Dimensions Of 19.05 X 32 M, With An Artificial Epdm Polyurethane Surface Permeable To Water, Moving The Existing Above-Ground Gas Tank To Another Place And Constructing A Fence. The Contractor Is Obliged To Carry Out Archaeological Research, For Which A Permit Must Be Obtained Wielkopolska Provincial Conservator Of Monuments And Obtain An Occupancy Permit Or, If It Is Not Required, To Notify The Supervisory Authority About The Completion Of Construction, Including Obtaining A Certificate Of No Grounds For Objection. The Scope Of Construction Works Was Specified In The Design Documentation, Including: 1) Dismantling Of The Existing Above-Ground Lpg Tank With A Capacity Of 6,700 Dm3, Demolition Of The Reinforced Concrete Slab Of The Tank And Relocation To A New Location Indicated In The Pzt, 2) Assembly Of The Existing (After Dismantling) Tank Above-Ground Lpg Gas With A Capacity Of 6,700 Dm3 On A Prefabricated Concrete Slab With Connection Of The Gas Pipeline, Construction Of A Fence Around The Gas Tank And A Lightning Protection System For The Tank. A Detailed Description Of The Works Is Included In The Design Documentation For The Sanitary And Electrical Industries. Note: Work Related To The Relocation Of The Above-Ground Lpg Tank With A Capacity Of 6,700 Dm3 Should Be Carried Out After The End Of The Heating Period. Before Dismantling The Existing Gas Tank, It Should Be Emptied Of Liquid Gas. The Gas Tank Is Subject To Udt Inspection - All Formalities Before The Office Of Technical Inspection Related To Works On The Above-Ground Lpg Tank, Covered By The Subject Of The Order, Are The Responsibility Of The Contractor. Works Related To Dismantling The Tank And Dismantling The Gas Installation May Be Performed By Persons With Appropriate Energy (Gas) Qualifications. 3) Construction Of A Pitch Slab With Dimensions External 32 X 19.05 M. With An Artificial Epdm Polyurethane Surface That Is Permeable To Water. Due To Its Location, The Pitch Will Have A Maximum Slope Of 0.9% Along Its Length In One Direction, In The Direction Of The Natural Slope Of The Terrain. Use Concrete Edging With Dimensions Of 8X25x100 Cm Placed On A Concrete Bench Made Of C8/10 Concrete. As A Playing Surface, Make A Flexible Layer Of Rubber Granulate, Quartz Gravel And A Thick Polyurethane Binder. Min. 3Cm. Then Make A Flexible Layer Of Rubber Granulate. 11Mm And A Pu Sprayed Wear Layer, Thickness. 2Mm. The Surface Should Be Made Water-Permeable. The Surface Must Be A System Solution From One Manufacturer. Layers Of The Pitch Slab: Polyurethane Surface, System Solution - Wear Layer - Pu Spray - 2 Mm - Flexible Layer - Rubber Granulate - 11 Mm - Et Subbase - Min 3 Cm Stone Ground - 4 Cm Structural Layer Made Of Broken Aggregate With A Fraction Of 0 - 31.5 Mm - 20 Cm Compacted Sand Bill As A Result Of Soil Replacement - 9-40 Cm Native Soil Color Scheme: Central Field (Volleyball) Green, The Rest Of The Pitch Brick Color. Note: The Ordering Party Requires That The Contractor, Before Signing The Contract, Presents The Documents Required For The Pitch Surface: Pzh Certificate. Iaaf Tests - Complete Report. Iaaf Certificate. Technical Data Sheet Confirmed By The Manufacturer. Authorization And Warranty Confirmed By The Manufacturer. Tests Confirming Compliance With The Pn En 14877:2014 Standard. The Surface Should Be Friendly To People Using It And The Surroundings, And The Content Of Chemical Compounds Should Not Exceed The Values ​​Specified In The Standard. Tests Are Required To Confirm Compliance With The Din 18035-6:2021-08 Standard. Frost Resistance Test Dedicated To Pu Surfaces. 4) Installation Of Linear Drainage Along The Shorter Side Of The Pitch From The West And Drainage Of Water Through A Drainage Pipe Fi 100 Running Along The Longer Side Of The Pitch ,5) Construction Of A Panel Fence Around The Pitch Made Of 4M High Rods And Additionally On The Shorter Sides Of Mesh Barrier Fences Up To 6M High, Including An Entrance Gate And A Gate From The Side Of The Entrance Gate To The Property (Western Side) And An Additional Gate For People From Outside From The Street Marmurowa (Eastern Side). Fence Posts Installed In Foundation Footings, 6) Installation Of Pitch Equipment, 7) Installation Of Small Architecture Elements, 8) Construction Of A New Fence In The Field And Work On The Existing Fence, 9) Removal Of The Planned Pitch From The Area 4 Pcs. Existing Trees: Brittle Willow - 1 Pc, Weeping Willow 1 Pc, Black Locust - 1 Pc, Common Yew - 1 Pc, Including: Removal Of Tree Roots (Milling If Necessary), Collection, Removal And Disposal Of The Resulting Trees Waste Related To Cutting Down Trees And Removing Roots, Along With Tidying Up The Area After The Work. 10) Removal From The Area Of ​​The Proposed Playing Field Of 1 Fruit Tree And 3 Shrubs, Exempt From The Obligation To Obtain A Permit To Cut Down Trees Or Shrubs - Including: Removal Of Tree Roots (Milling If Necessary), Collection, Removal And Disposal Of The Resulting Waste. With The Felling Of Trees And Removal Of Roots Along With Tidying Up The Area After The Works. The Contractor Is Obliged To Perform All Construction Works And Activities Resulting From The Building Permit (Preparation Of, Among Others, All Necessary Research And Inspection Protocols, Post-Construction Geodetic Inventory, Appointment Of A Construction Manager, Purchase And Keeping A Construction Log And Other Documents Resulting From Legal Provisions). The Order Also Covers: - Ensuring Safety On And Around The Construction Site And Construction Insurance, - Notifying The Relevant Authorities And The Owner Of The Property Where The Works Will Be Carried Out About The Commencement Of The Works, - Accompanying And Temporary Works Specified In Stwiorb, - Carrying Out All Tests, Inspections And Acceptances, Envisaged By The Technical Conditions For The Execution And Acceptance Of Construction, Assembly And Installation Works, - Tidying Up The Construction Site After The Completion Of The Works And Handing It Over To The Ordering Party No Later Than The Date Of Final Acceptance, - Performing All Works And Activities Related To The Proper Implementation Of The Order, Even If They Are Not Included In The Bill Of Quantities, - All Construction Materials And Products As Well As Equipment Necessary To Perform The Works Are Secured By The Contractor Himself. Note: Work Related To The Implementation Of The Order Will Be Carried Out Within The Existing Primary School Facility. Work, Storage And Delivery Of Materials Should Be Carried Out In Such A Way That They Do Not Interfere With The Functioning Of The Facility.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
41743ba8-0e63-4ba8-8737-df639c95ba39.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders