Tenders Are Invited For The Service Of Exercising Investor Supervision Over The Project Implemented As Part Of The Project Establishment Of An Industry Skills Center In The Field Of Renewable Energy - Bioenergy
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
76724593
Tendering Authority
Subscribe to view
Tender No
ZSCKR-34-340-01-24
Financer Name
Self-Funded
Work Title
Tenders Are Invited For The Service Of Exercising Investor Supervision Over The Project Implemented As Part Of The Project Establishment Of An Industry Skills Center In The Field Of Renewable Energy - Bioenergy
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
26-02-2024
Closed
Work Detail
The Subject Of The Order Is The Provision Of Investor Supervision Services To The Ordering Party In The Construction Industry Of The Project Referred To In Section 4.1, Implemented By The School Complex Of The Agricultural Education Center In Jabłoń As Part Of The Project: Establishment Of An Industry Skills Center In The Field Of Renewable Energy - Bioenergets In The School Complex Of The Agricultural Education Center In Jabłoń Concerns The Competition - Creation And Support For The Operation Of 120 Industry Skill Centers (Bcu) Implementing Concept Of Centers Of Professional Excellence (Coves) From The National Recovery And Resilience Plan No. Aid Agreement No. Kpo/23/1/Bcu/U/00181. Construction Works Regarding The Sentence Establishing An Industry Skills Center In The Field Of Renewable Energy - Bioenergy In The School Complex Agricultural Education Center In Jabłoń Are Being Implemented In The Design And Build System. Scope Of Construction Works That Will Be Supervised: A) Creation Of An Industry Skills Center In The Field Of Renewable Energy - Bioenergets In The School Complex Of The Agricultural Education Center In Jabłoń Parameters Of The Investment Area And The Designed Building According To The Developed Concept: Ground Area Of The Investment Area 2,249.06 M2 Building Area, Including: 648.06 M2 - Building 648.06 M2 Area Of Paved Areas, Including: M2 - Roads, Parking Spaces (8 Cm Concrete Cubes) 784.00 M2 - Sidewalks (6Cm Concrete Cubes) 237.00 M2 Area Of Green Areas 580.00 M2 Designed Building Number Of Underground Floors 0 Number Of Above-Ground Floors 2 Usable Area 1,127.98 M2 The Facility Is Planned To Be Equipped With Internal Installations: • Electrical Industry: Photovoltaic Installation, Electrical Power Supply Installation, Installation Lighting, Emergency Lighting Installation, Outdoor Lighting Installation, Low-Current Installation (Structured Cabling, Cctv Monitoring, Burglary And Attack Alarm Installation), Lightning Protection Installation• Sanitary Industry: Sanitary Sewage Installation, Water Installation (Hot And Cold Utility Water Installation), Hydrant Installation, Heat Supply Devices - External Air/Water Heat Pumps, Building Heating System - Surface Heating Installation, Mechanical Ventilation Installation With Heat Recovery And Air Conditioning. Renewable Energy Sources Will Be Used: • Air Heat Pump For The Purposes Of Providing Domestic Hot Water, Heating And Cooling Of The Building • Photovoltaic Installation For The Needs Of Ensuring Electricity. The Facility Will Be Constructed Using Traditional Technology (Brick And Reinforced Concrete). Thermal Insulation Conditions Of The Building In Accordance With The Applicable Wt2021 Regulations. Flat Roof, Covered With Thermally Weldable Felt. The Building Will Be Equipped With An Elevator. The Floors Throughout The Facility Will Be Finished With Large-Format Stoneware Tiles. Walls Painted And/Or Finished With Ceramic Tiles. Suspended Ceilings. It Is Planned To Connect The Facility To The Public Electricity, Water, Sewage And Telecommunications Networks. It Is Planned To Build Our Own Internal Rainwater Drainage System. A New Exit To Ul. Zamoyskiego And The Liquidation Of The Existing Exit. The Parking Lot (Parking Spaces) Is Located Deep Inside The Plot. It Is Planned To Create New Paved Areas (Access Roads, Sidewalks), Green Areas And The Installation Of Small Architecture Elements. The Investment Is To Be Located At Ul. A. Zamoyskiego 4 In Jabłoń On Plot No. Geod. 2031/4, Rev. Jabłoń, Jabłoń Commune, Parczew Poviat, Province. Lubelskie. The Plot For The Investment Is Located In A Conservation Protection Zone. The Pfu Was Developed Based On The Conservation Guidelines Issued By The Provincial Office For The Protection Of Monuments In Lublin, Branch Office In Biała Podlaska. The Facility And Adjacent Areas Should Be Constructed In A Manner Consistent With The Guidelines Of The Conservator Of Monuments. The Construction Design Requires Approval With The Provincial Office For The Protection Of Monuments In Lublin. 2. The Ordering Party Announced And Resolved The Procedure For The Implementation Of Design And Construction Works And Signed A Contract In This Respect. The Agreement Constitutes Annex No. 7 To The Swz. Information On The Procedure For Selecting The Contractor Listed In Section 4.2 Point 1 Were Published On The E-Procurement Portal And On The Ordering Partys Website. The Value Of The Contract For Design And Construction Works Is: Pln 8,461,213.05.4.3 Obligations Of The Supervision Inspector (Applies To All Parts Of The Order From I-Iv)1. The Contractors Duties Will Include Performing The Duties Of An Investor Supervision Inspector, In Accordance With The Provisions Of The Act Of July 7, 1994, Construction Law (Journal Of Laws Of 2023, Item 682), Hereinafter Referred To As The Construction Law, In Particular In Accordance With The Provisions Of Art. 25 Of This Act.2. The Contractors Obligations Will Also Include: 1) Carrying Out Investor Supervision Activities With Due Diligence During The Stay On The Construction Site At Each Request Of The Ordering Party Or The Construction Contractor, If The Progress Of The Works Requires It, By Supervision Inspectors Assigned By The Contractor To Execute The Order; 2) Representing The Ordering Party By Checking The Compliance Of The Execution Of Construction Contracts With The Design Documentation, Applicable Legal Provisions, Principles Of Technical Knowledge And Applicable Standards; The Ordering Party Requires The Presence Of Supervision Inspectors From Each Industry, Min. Once A Week - The Visit Should Be Confirmed With An Appropriate Entry By The School Principal Or An Authorized Employee3) Checking The Quality Of The Works Performed And Built-In Construction Products, And In Particular Preventing The Use Of Construction Products That Are Defective And Not Approved For Use In Construction Or Inconsistent With The Design Documentation;4) Checking And Acceptance Of Construction Works That Are Covered Or Disappearing, Participation In Tests And Technical Acceptance Of Installations, Technical Devices And Cables, As Well As Preparation And Participation In Acceptance Activities Of Works, 5) Confirmation Of Actually Performed Works And Removal Of Defects; 6) Checking, Verifying And Controlling Financial Settlements Regarding Supervised Construction Works, Including Verifying The Documents Constituting The Basis For Settlements Between The Ordering Party And The Contractor Of Supervised Construction Works; 7) Checking The Correctness Of Entries In The Construction Log And Making Entries In The Construction Log Confirming All Circumstances Relevant To Assessing The Proper Performance Of Construction Works;8) In Consultation With The Ordering Party, Notifying The Competent Construction Supervision Authority And - If Applicable - Other Relevant Administrative Bodies - About Cases Of: Violation Of The Provisions Of The Construction Law, Performance Of Construction Works Inconsistent With The Design Documentation, Violation Of Regulations Governing Health And Safety Work, Fire Safety And Environmental Protection Rules, As Well As About Other Violations Of Obligations Arising From Legal Provisions;9) Informing The Ordering Party About Any Delays In The Performance Of Supervised Construction Works, Interruptions In The Conduct Of Construction Works, Improper Performance Of Duties Or Performance Of Supervised Construction Works In A Way That Violates Agreement Between The Contractor Of Construction Works And The Ordering Party, And In Particular About The Events Entitling The Ordering Party To Impose Contractual Penalties On The Contractor Of Construction Works.10) Checking The Detailed Design In Accordance With The Provisions Of Pfu3. In The Scope Of Individual Parts Of The Order From I-Iv, The Contractor Is Obliged To: 1) Ensure The Presence Of Supervision Inspectors At The Place Of Supervision Of Construction Works In Such A Way That The Contractor Is Able To Perform All The Obligations Imposed On Him; (Visit To The Construction Site By Supervision Inspectors At Least 1 X Per Week, Confirmed By An Entry By The School Principal Or An Authorized Employee)2) Ensure The Immediate Presence Of The Staff Assigned To Perform Investor Supervision At The Place Of Supervision Over Construction Works, At The Request Of The Ordering Party In The Event Of Events Requiring Immediate Action On The Part Of The Contractor;3) Supervise The Process Performing Construction Works In Order To Check The Quality Of The Works Performed And The Materials Used In A Way That Ensures Effective Supervision Of The Construction Works; 4) Maintain Current Photographic Documentation Of The Supervised Construction Works; Photographs Should Be Taken In Digital Form, With A Resolution Of Not Less Than 4000 X 3000 Pixels, In (Jointly) .Jpeg Or .Jpg And .Tiff Formats; Photographic Documentation Should Be Provided To The Ordering Party At Least Once A Month;5) Control The Fulfillment Of The Obligations Arising From Legal Provisions By The Contractor Of Construction Works, In Particular Obligations Arising From Fire Regulations And Environmental Protection Regulations;6) Immediately Verify All Documents Related To Implementation Of Supervised Construction Works Presented By The Construction Contractor; 7) Approve The Construction Work Execution Methods Presented By The Contractor Of The Supervised Works, Including Temporary And Protective Works;8) Check The Completed Works And Notify The Construction Works Contractor, Authors Supervision And The Ordering Party About The Detected Defects, Specifying The Scope Of Correction Works Necessary To Perform;9) Enforce Timely Removal Of Defects And Prepare A Report On The Removal Of Defects By The Contractor Of Supervised Construction Works; Cont. In Swz
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
29b0fca9-566b-4ddb-9ce8-33bfe02fce32.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.