GTR 76597847
Tenders Are Invited For Improving The Energy Efficiency Of The Building At Przemysłowa 44 In Bełżyce - Thermal Modernization Of The Gymnasium.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
76597847
Tendering Authority
Subscribe to view
Tender No
IGM-ZP.272.3.2024.AW1
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Improving The Energy Efficiency Of The Building At Przemysłowa 44 In Bełżyce - Thermal Modernization Of The Gymnasium.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
04-03-2024
Closed
Work Detail
The Subject Of The Order Is The Performance Of Construction Works As Part Of The Task Entitled: Improvement Of The Energy Efficiency Of The Building At Przemysłowa 44 In Bełżyce - Thermal Modernization Of The Gymnasium. The Task Is Co-Financed By The Polish Order Government Fund: Strategic Investment Program. The Scope Of Implementation Will Include, Among Others: The Following Works: A) Construction Industry - External Works: - Drying Damp Foundations And Walls Using The Crystal Injection Method, - Performing Moisture And Heat Insulation Of The Foundation Walls Of The Gymnasium, - Performing Vertical Insulation Of The External Walls Of The Gymnasium, - Performing External Plasters Of The Gymnasium, - Painting External Walls Of The Gymnasium, - Removal Of Layers Of Thermal Insulation And Roofing Felt On The Roof Above The Gymnasium And Installation Of New Ones, - Execution Of Sheet Metal Work (Gutter Strip, Eaves, Gutters And Downpipes), - Modernization Of The Firewall (Firewall) On The Roof Separating Parts Of The Facility, - Removal Of Existing Foundations And Construction Of New Ones For The Air Handling Unit, - Construction Of A Fence For The Air Handling Unit, - Removal Of Bushes From The Square In Front Of The Building, - Painting Of Strips Marking The Driving Zones, Parking Lots And Maneuvering Area, - Construction Of Sidewalks Enabling Access To The Building, - Construction Of A Strip Around The Building And Concrete Edging Around The Driving Surface And Parking Lots, - Installation Of A Gate In The Existing Fence, - Installation Of A Garbage Shelter, B) Construction Industry - Internal Works: - Preparation Of Openings For Door Joinery In The Cloakroom And Sanitary Part, - Installation Of Round Air Vents In The Cloakroom And Sanitary Part ,- Construction Of A Warehouse In The Corridor In The Cloakroom And Sanitary Part,- Laying Tiles In The Cloakroom And Sanitary Part,- Laying The Floor In The Cloakroom And Sanitary Part,- Covering The Central Heating Pipes With Gkf Boards. And Other Installations In The Cloakroom And Sanitary Part And The Gymnasium, - Installation Of Lightweight Walls Separating Shower Cabins In The Sanitary Part, - Installation Of Internal Door Joinery In The Cloakroom And Sanitary Part, - Dismantling Windows And Bricking Up Window Openings In The Gymnasium On The North Side, - Replacement Window Joinery And Door-Window Set In The Gymnasium On The South Side, - Installation Of Internal Window Sills, - Making A Hole For The Ventilation Installation In The Western Wall Of The Gymnasium, - Ventilation Of The Trainers Rooms With Ducts Leading Through The Gymnasium To The Roof And Installing Ventilators, - Removal Assembly Hooks For The Ladders In The Gymnasium, - Disassembly Of Air Vents In The Northern And Southern Walls Of The Gymnasium And Installation Of New Ones In The Southern Wall, - Construction Of A Climbing Wall Inside The Gymnasium On The Western Wall, - Painting The Rooms Of The Locker Room And Sanitary Section, The Gymnasium And The Structure Of The Girders, - Uncovering Part Of The Floor At The Entrance To The Gymnasium From The Locker Room And Sanitary Area, Excavating, Closing And Backfilling The Central Heating Duct. At Its Entrance To The Building And Making A Concrete Screed For The Floor Of The Gymnasium, - Replacing Part Of The Floor In The Gymnasium And Plinths Around The Entire Perimeter Of The Gymnasium, - Sanding And Painting The Floor And Appropriate Stripes For The Courts In The Gymnasium, - Installing New Basketball Hoops In The Gymnasium, Gymnasium, - Installation Of A Partition Curtain In The Gymnasium, C) Sanitary Industry: - Installation Of Mechanical Ventilation In The Gymnasium, - Installation Of Technological Heat From The Distributor In The Boiler Room To The Ventilation Center, - Installation Of Radiators Along With The Adjustment And Commissioning Of The Installation, - Flushing And Taking Water Samples From The Existing Water Supply System, D) Electrical Industry: - Installation Of Basic Lighting, - Installation Of Evacuation And Directional Lighting, - Installation Of Plug Sockets And Power Supply For Technological Devices, - Installation Of General And Local Equalizing Connections, - Installation Of Protection Installations Anti-Shock Protection, - Construction Of A Lightning Protection And Anti-Overvoltage Installation, - Construction Of Overcurrent Protection, - Construction Of A Gymnasium Switchgear. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 1 To The Swz, Which Consists Of The Following Documents: − Design Documentation, − Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb), − Bill Of Quantities. Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence, During The Implementation Of The Contract, Of Works Not Included In The Bill Of Quantities Or Works In A Larger Quantity Than That Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation. The Amount Intended To Finance The Order - Pln 2,200,000.00 .The Ordering Party Pays Particular Attention To The Possibility And Advisability Of Making A Site Visit To The Site Of The Planned Works Before Submitting The Offer. The On-Site Visit Can Be Carried Out From Monday To Friday From 10.00 A.M. To 2.00 P.M. After Prior Arrangement Of The Date By Calling: 81/517 23 62 - Zespół Szkół Im. Nicolaus Copernicus University In Bełżyce. Equivalent Solutions In Each Case Of Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. If References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In The Design Documentation, The Ordering Party Allows Solutions Equivalent To Those Described. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Design Documentation Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Design Documentation Or The Technical Specification For The Execution And Acceptance Of Works, It Means That They Are Provided As Examples And Define Only Minimum Expected Quality Parameters And The Required Standard. The Contractor May Use Equivalent Materials Or Devices, But With Similar Or Better Technical And Quality Parameters, The Use Of Which Will In No Way Adversely Affect The Proper Functioning Of The Solutions Adopted In The Design Documentation. The Contractor Who Will Use Devices Or Materials Equivalent, He Will Be Obliged To Demonstrate During The Execution Of The Order That The Equipment And Materials Used By Him Meet The Requirements Specified By The Ordering Party. The Use Of A Label In The Design Documentation Means That The Ordering Party Accepts All Labels Confirming That Given Construction Works, Supplies Or Services Meet The Equivalent Requirements Of The Label Specified By The Ordering Party. . If The Contractor, For Reasons Beyond Its Control, Cannot Obtain The Label Or Equivalent Label Specified By The Contracting Authority, The Contracting Authority, Within The Time Limit Set By Itself, Accepts Other Appropriate Means Of Evidence, In Particular The Manufacturers Technical Documentation, Provided That The Contractor Proves That The Construction Works , Supplies Or Services To Be Performed By Him Meet The Requirements Of A Specific Label Or Specific Requirements Indicated By The Ordering Party. The Use In The Design Documentation Of The Requirement To Have A Certificate Issued By A Conformity Assessment Body Or A Test Report Carried Out By This Body As A Means Of Evidence Confirming Compliance With The Requirements Or Features Specified In The Description Of The Subject Of The Contract, Offer Evaluation Criteria Or Contract Performance Conditions Means That The Ordering Party Also Accepts Certificates Issued By Other Equivalent Conformity Assessment Bodies. The Ordering Party Also Accepts Other Appropriate Means Of Evidence, In Particular The Manufacturers Technical Documentation, In The Event That A Given Contractor Has Neither Access To Certificates Or Test Reports Nor The Possibility Of Obtaining Them In An Appropriate Time, Unless This Lack Of Access Cannot Be Attributed To A Given Contractor. , And Provided That A Given Contractor Proves That The Construction Works, Supplies Or Services Performed By Him Meet The Requirements Or Criteria Specified In The Description Of The Subject Of The Order, The Offer Evaluation Criteria Or The Requirements Related To The Implementation Of The Order. If The Description Of The Subject Of The Order Includes A Provision Resulting From The Knr Or Knnr Indicating The Need To Use Specific Equipment With Specific Parameters To Complete The Order. The Ordering Party Allows The Use Of Other Equipment, Provided That It Ensures The Achievement Of The Assumed Design Parameters And Does Not Cause The Risk Of Non-Compliance Of The Work Performed With The Technical Documentation. The Said Means Of Evidence. The Ordering Party Does Not Require The Contractor To Submit The Said Means Along With The Offer. Evidentiary.Cont. Part Iv Swz (Limited Text Field).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
57fc571d-e188-4f2d-84bc-67f3a87cd27f.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.