GTR 76597753

Tenders Are Invited For Modernization Of Cloakrooms And Toilets At The Facility At Ul. Dąbrowskiego 113 In Chorzów - Stage Ii

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
76597753
Tendering Authority
Subscribe to view
Tender No
ZP.26.1.2.2024.TP
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of Cloakrooms And Toilets At The Facility At Ul. Dąbrowskiego 113 In Chorzów - Stage Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
29-02-2024 Closed
Work Detail
The Subject Of The Order Is The Second Stage Of Modernization Of The Locker Rooms And Sanitary Facilities, Which Includes: Repeatable Locker Rooms On The Second Floor (302, 303, 304, 305, 306 And 307) Orange (The Final Color Will Be Approved At The Construction Stage) Massage Room On The Ground Floor Administration Bathroom On The Second Floor Floor And Room No. 20 (Annex 15 And Appendix 16 To The Swz) Modernization Of The Cloakroom, Bathrooms And Accompanying Rooms Are Intended, Among Others, For: To Service The Main Sports Hall And A Smaller Gymnasium And Will Be Used Mainly By School Children And Individual Users. Demolition And Dismantling Works: • Disassembly Of Panels With Dismantling Of The Substructure On The Walls • Removal Of Existing Tiles From The Walls • Removal Of Hollow Plasters On The Walls • Widening And Demolishing Of Openings Doors• Disassembly And Demolition Of Partition Walls (According To The Design)• Disassembly Of Existing Toilet Bowls, Washbasins And Associated Equipment• Dismantling Of Existing Radiators• Dismantling Of Suspended Ceilings (According To The Design)• Disassembly Of Any Elements That Will Interfere With Construction Works• Disassembly Of Existing Lighting And Replacement Electrical Installation• Disassembly Of Floor Drains• Disassembly Of Doorsconstruction Works:• Installation Of New Door Joinery• Installation Of Bathroom Fittings• Installation Of Equipment• Installation Of A New Grid For Panels• Installation And Erection Of Partition Walls (According To The Design)• Filling Of Gaps In The Walls, Gluing Cracks• Placing Lintels Over Newly Created Holes• Leveling The Walls With Plaster• Finishing Walls And Floors With Tiles (According To The Design)• Installation Of Suspended Ceilings (According To The Design)• Finishing The Walls With Plaster (The Ordering Party Waives The Use Of Glued Sport Inscriptions)• Installation Of Overhead Lighting And Sockets• Installation Of Linear Drainage In Bathrooms• Installation Of Water Mixers• Installation Of Valves With Connectors• Execution Of Sanitary Installationsadditionally, The Subject Of The Order Is The Renovation Of Room No. 20, In Order To Adapt The Room To The Social Needs Of Employees (Separate Bill Of Quantities, Appendix No. 15 And Description Of Appendix 16) Scope Of Works:• Cleaning The Surfaces Of The Walls And Ceiling• Preparation Of Wall And Ceiling Surfaces • Plastering • Painting The Surface - Ceiling Emulsion Paint, Latex Paint (Washable), Wall Surface - Color To Be Determined • Possible Repair And Leveling Of The Floor • Laying A Rolled Carpet, With A Turn-Up On 10 Cm High Plinths • Replacement Of Lighting Fixtures - One Wall And One Ceiling• Delivery And Replacement Of Electrical Connectors - 2 Pieces• Installation Of 4 Double Splash-Proof Sockets - Together With The Necessary Electrical Installation And Adaptation Of The Electrical Switchboard To Which The Cables Should Be Run• Delivery And Installation Of Standing And Hanging Kitchen Cabinets With A Countertop• Delivery And Assembly: Kitchen Countertop, Length Approx. 1.5 M With A Single-Bowl Sink With Spout, Under-Cabinet Boiler, Shredder And Pump• Execution Of Connection Of Water And Sewage Installations - To Existing Installations, To The Adjacent Room Colors / Patterns - To Be Agreed At The Execution Stage. A Detailed Description Of The Subject Of The Order Is Included In The Annexes To The Swz, Which Constitute Its Integral Part, I.E.: Only Items Relating To Stage Ii - Bill Of Quantities - Illustrative - Specifications For The Technical Execution And Acceptance Of Construction Works - Design Documentation 3. The Offer Must Include All Additional Costs Related To The Implementation Of The Scope Of The Task Covered By The Bill Of Quantities, Such As E.G. Preparation The Work Area, Organization Of Work Facilities, Tidying Up The Area After The Work Is Completed And Securing It During The Work Until The Investment Is Handed Over To The Ordering Party.4. The Quality Of Materials And Works Should Be Examined And Monitored On An Ongoing Basis During The Execution Of The Works And After Completion (If Applicable). The Results Of All Tests And Inspections Should Be Included In The Protocols Attached To The Acceptance Documentation. The Cost Of Testing And Inspection Will Be Borne By The Contractor.5. The Works Must Be Made Of Materials Provided By The Contractor In Accordance With The Technical Specification For The Execution And Acceptance Of Construction Works, Applicable Standards And Technical Conditions For The Execution And Acceptance Of Works. The Contractors Obligation Is To Provide The Required, Up-To-Date Approvals And Certificates Of All Materials And Devices Used. 6. Equivalent Solutions: 1) If The Description Of The Subject Of The Order Indicates Any Trademark, Patent Or Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor, It Should Be Assumed That The Ordering Party Provided Such A Description In Order To Determine The Minimum Parameters That The Products Must Meet The Requirements Set By The Ordering Party And Constitute Only A Quality Standard Of The Subject Of The Order. The Ordering Party Allows Equivalent Products Provided That The Subject Of The Offer Is Functionally Identical And As Close As Possible In Terms Of Structure, Materials And Dimensions To The Sample Products. The Contractor Who Refers To Equivalent Solutions Is Obliged To Attach To The Offer A List Of Substitute/Equivalent Materials/Goods Along With Their Parameters.2) If The Swz Uses Standards, European Technical Assessments, Approvals, Technical Specifications, Technical Reference Systems, The Ordering Party Allows Solutions Equivalent To Those Described. Each Time A Standard Is Indicated In This Swz Or The Annexes To The Swz, It Should Be Assumed That The Phrase Or Equivalent Was Used In Reference To It. 3) The Equivalence Of The Solutions Will Be Assessed At The Stage Of Examining The Offers. 4) Materials, Products And Equivalent Solutions Used By The Contractor , Must Be At Least: - Of The Same Strength And Durability, With The Same Level Of Aesthetics (Products); - With Technical Parameters Described In The Tender Documentation; - Compatible With The Existing And Planned Infrastructure; - Meet: The Same Functions And Safety Requirements Construction, Occupational Health And Safety And Fire Protection; - Have Appropriate Documents Allowing For Use In Construction (Approvals, Certificates And Technical Approvals); 5) The Contractor Must Prove To The Ordering Party That The Proposed Material, Product, Technology Or Solution Is Equivalent By Presenting All Documents, Calculations, Opinions, Etc. Confirming Equivalence. 7. The Contractor Is Obliged To Perform Construction Works In Accordance With Construction Practice, Applicable Legal Regulations And Standards And In Compliance With Health And Safety And Fire Protection Regulations. The Contractor Also Guarantees The Execution Of The Subject Of The Order Under The Supervision Of Persons With The Required Professional Preparation To Perform Independent Technical Functions In Construction.8. The Ordering Party Informs That Construction Works Will Take Place At An Active Sports Facility. During Construction Works, The Contractor Must Secure The Work Area And Provide Access To The Rooms In The Building.10. Pursuant To Art. 95 Section 1 Of The Public Procurement Law, The Ordering Party Requires The Contractor, Subcontractor Or Further Subcontractor To Employ Persons Performing All Activities Included In The So-Called Direct Costs Under An Employment Contract In The Scope Of Order Execution, If The Performance Of These Activities Involves Performing Work In The Manner Specified In § 1 Of Art. 22 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2020, Item 1320) And Covers The Following Types Of Activities: 1) Construction Works [Activities Specified In Detail In The Bill Of Quantities], 2) Installation Works Sanitary Installations [Activities Specified In Detail In The Bill Of Quantities], 3) Works In The Field Of Electrical Installations [Activities Specified In Detail In The Bill Of Quantities].
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
eadc3578-e59f-4a54-bab9-3f719df0ec21.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders