GTR 76576508
Tenders Are Invited For Machinery For Food, Beverage And Tobacco Processing And Associated Parts – Purchase Of Distillation Equipment For Pte Szbki
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
76576508
Tendering Authority
Subscribe to view
Tender No
96519-2024
Financer Name
European Union (EU)
Work Title
Tenders Are Invited For Machinery For Food, Beverage And Tobacco Processing And Associated Parts – Purchase Of Distillation Equipment For Pte Szbki
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
28-03-2024
Closed
Work Detail
Machinery For Food, Beverage And Tobacco Processing And Associated Parts – Purchase Of Distillation Equipment For Pte Szbki. Filling Volume Of The Cauldron: 100 Liters (± 5% Deviation Allowed) The Distillation Equipment Must Be Suitable For Distilling Small Amounts, I.E. Amounts Smaller Than 100 Liters - No Less Than 20 Liters - Also For Distilling The Lower And Upper Part Of The Cauldron: Red Copper (Please Specify The Standard Specification Compliance, If Available To The Bidder) Or Stainless Steel Cefre Thermometer: Digital (℃) Temperature Scale With Graduations Mixer Motor Power: Min. 0.25 Kw Boiler Lighting: With An External Lighting Body Mounted On The Boiler, Or With An Additional Viewing Glass. Glass Thickness: Min. 6 Mm Safety Fittings: Vacuum Breaker, Overpressure Valve On The Water Bath, Safety Pressure Switch For The Water Bath, Water Shortage Switch To Protect The Heating Cartridges, Safety Thermostat On The Aftercooler To Prevent An Explosive Situation, Emergency Stop Button Filling The Cauldron: The Top Ball Valve Equipped Min. It Should Be Possible To Fill The Cauldron Both Through The Dn 50 Connector And Through The Door. Emptying The Cauldron: The Min. Possible Via A Dn 65 Connector Heating: Electric Heating Installed In The Water Space Min. With A Power Of 12 Kw Refining Column: Min. 200 Mm Diameter Copper Or Stainless Steel, 1.4301 (Standard: Din En 10088-3) Or Equivalent Analogue Thermometers: Min. 4 Pieces: Cooling Water Coming Out Of The Aftercooler, Cooling Water Coming Out Of The Dephlegmator 1 Each, Another 1 Each Installed On The System/Steam Pipe/Refining Column (℃) With Temperature Scale Graduations Central Electrical Control Cabinet: From The Distillation Equipment Max. Within 5 M Mounted On The Wall Or On The Device (Responsibility Of The Equipment Bidder) Cooling Control: Automatic Mixer Control: Manual Boiler Washing: Central With Mains Water, Manual Ball Valve Or Central Chip System Refining Column Washing: Central With Mains Water, Manual Ball Valve Or Central Chip System Column Structure: At Least 2, With A Plate That Can Be Continuously Changed During Cooking, Operation Control: Manual (Can Be Switched On Or Off) Pre-Distillate Separation Method: Manual Heating Control: Semi-Automatic By The Controller Electrical Connection: 3 Phases, 3X400v, 50Hz, 3X32a Mains Water Connection, Min. 2.5 Bar Drinking Water Quality, 150 Liters Per Hour, Min. 1/2" External Threaded Connection In And Min. 3/4 On The Outlet Side On The Outlet Side Boiler Heating Method: Electric Cooling Method: Water-Cooled Water Consumption: Maximum 200 L/H Have Instructions For Use In Hungarian, Which Must Be Made Available To The Contracting Authority In An Electronic Version Warranty: 12 Months Provision Of Training (Trial Operation): 2 Through Distillation For 4 People 2 Times
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8206face-ae69-4f07-a781-852ea9b4724e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.