GTR 76229214

Tenders Are Invited For Ongoing Maintenance Of Unpaved Roads In The Jadów Commune

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
76229214
Tendering Authority
Subscribe to view
Tender No
ZP.2710.4.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Ongoing Maintenance Of Unpaved Roads In The Jadów Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
22-02-2024 Closed
Work Detail
The Subject Of The Order Is The Performance Of Construction Works As Part Of The Ongoing Maintenance Of Roads In Order To Improve Passability In The Jadów Commune. The Order Includes: - Delivery And Spreading Of Crushed Natural Aggregate With A Grain Size Of 0/31.5 Mm Using A Bituminous Mass Spreader, Along With Leveling And Profiling Of The Road And Compaction With A Self-Propelled Roller. Natural Crushed Aggregate With A Grain Size Of 0/31.5 Mm Meeting The Requirements Of The Pn En 13242 Standard Or Equivalent. - Double Surface Consolidation Of The Surface. - Reconstruction Of Drainage Ditches Along With Spreading And Profiling The Slope And The Bottom Of The Ditch. - Spreading The Reclaimed Asphalt Entrusted By The Ordering Party Using Bituminous Mass Spreader, Along With Road Grading And Profiling As Well As Compaction With A Self-Propelled Roller, - Transport Of Reclaimed Asphalt From The Mzdw Headquarters In Warsaw, Wołomin - Nowy Dwór Maz. Region, Ul. Kobyłkowska 1, 05-200 Wołomin By Car With A Capacity Of Min. 15 Tons For The Area Of ​​The Jadów Commune. - Installation Of Pipe Culverts Ø400 Mm With Abutments. The Scope Of The Contract Includes The Execution Of Works In The Entire Area Of ​​The Jadów Commune. The Quantities Of Planned Tasks Are Specified In The Price Form Attached As Annex 4 To This Specification. The Ordering Party Will Indicate To The Contractor Specific Road Sections To Improve Trafficability. Due To The Fact That The Works Will Be Performed In A Used Area, The Contractor Must Ensure The Least Possible Nuisance To Road Users And Comply With Occupational Health And Safety Rules When Performing The Service. 3. An Integral Part Of The Subject Of The Order Is The Performance Of The Following Activities: 1) Execution Of The Subject Of The Contract With Due Diligence, In Accordance With The Principles Of Modern Technical Knowledge (Construction Art), In Accordance With Applicable Regulations And Standards And On The Terms Agreed In The Contract, In Close Cooperation With The Ordering Party;2 ) The Contractor Is Obliged To Immediately Repair, At His Own Expense, Any Damage Caused By The Contractors Fault To Third Parties, On The Work Site And Outside The Site; 3) Supervising The Construction Site, Protecting Property On The Construction Site; 4) Implementing And Maintaining Occupational Health And Safety Fire Protection;5) Protection Of The Natural Environment;6) Maintaining General Order At The Construction Site, Carrying Out Regular Cleaning Work As Well As Removing And Transporting Waste And Impurities;7) The Contractor Is Responsible For The Safety Of All Persons Present On The Construction Site; 8) Use Of Construction Products In Accordance With Art. 10 Of The Construction Law, Admitted To Trading In Construction, In Accordance With The Construction Products Act - In Addition, The Contractor Is Obliged To: Use Brand New Materials, Free From Any Physical And Legal Defects As Well As Third Party Claims And Which Are The Property Of The Contractor;9) Informing The Ordering Party About The Progress Of The Works And Taking Part In Coordination Meetings Organized By The Ordering Party, Acceptance Activities, Warranty And Other Inspection Committees; 10) Fully Bearing The Costs Of Interruptions In The Performance Of Works Resulting From The Work Technology, Weather Conditions And Other Reasons Beyond The Control Of The Ordering Party; 11) The Contractor Shall Bear Full Costs Related To Travel, Access To The Work Site, Overtime Costs And On Days Off From Work;12) Coordination Of Works Of Individual Industries And Possible Subcontractors;13) Removal Of Defects And Faults During The Implementation Of Works14) Implementation Of All Recommendations Resulting From From The Records Of Current Inspections And Inspections Of The Facility
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
14981ffa-cf01-48d8-8627-5a6a1d4e5418.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders