GTR 75994239
Tenders Are Invited For Construction Of The Adamów - Bliżów Water Supply Network, Improvement Of The Living Conditions Of Residents Through The Construction Of A Water Supply System
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
75994239
Tendering Authority
Subscribe to view
Tender No
RIG 271.4.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of The Adamów - Bliżów Water Supply Network, Improvement Of The Living Conditions Of Residents Through The Construction Of A Water Supply System
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
16-02-2024
Closed
Work Detail
1. Construction Of The Adamów - Bliżów Water Supply Network, Improving The Living Conditions Of Residents Through The Construction Of A Water Supply System2. Detailed Description Of The Subject Of The Order And The Scope Of Work Regarding The Construction Of The Adamów - Bliżów Water Supply Network - In Accordance With: Construction Designs Constituting Annex No. 7 To The Swz, Bills Of Quantities Constituting Annex No. 8 To The Swz, Technical Specification For The Execution And Acceptance Of Construction Works Constituting Annex No. 9 To The Swz And The Contract Template Constituting Annex No. 6 To The Swz. Note - The Designed Water Supply Connections Included In The Technical Design Are Not Included In The Scope Of Works. However, The Scope Of Works Includes Sections Of Connections Subject To Overvoltage To The Designed Water Supply Network In Adamów (In Accordance With Table No. 1 Opi Su Technical Design And Indicated In Figure S10 - S6 )3. The Subject Of The Order Includes In Particular: 1) Surveying Services, 2) Construction And Assembly Works In The Field Of Construction Of A Water Supply Network, Including: • Replacement Of The Water Pumping Station In Adamów; • Connection To The Existing Water Supply Network On Plot No. 721, District 0001 Adamów With A Total Length Lc = 6560.45 M Of Pipes And Fittings Pehd 100 Rc, Sdr 17, Pn 10:- Pehd100 Rc Sdr17 160×9.5 Mm L= 6038.08 M – Main Network,- Pehd100 Rc Sdr17 90×11.72 Mm L = 11.72 M – Branch To The Hydrant,- Pehd100 Rc Sdr17 63×3.8 Mm L= 218.95 M – Branch,- Pehd100 Rc Sdr17 50×3.0 Mm L= 291.70 M – Branch. The Entire Network Water Supply System Should Be Performed Using The Trenchless Method. The Drilling Will Be Performed In Two Working Phases: Phase I - Conducting A Pilot Drilling With The Possibility Of Controlling It Phase Ii - Pulling In The Pipeline Cold And Assembly Works Of The Water Supply Network Made Of Pe Pipes Should Be Performed Based On The Technical Requirements: - Pn-B-10736 :1999. Open Excavations For Water Supply And Sewage Lines. - Pn-B-10725:1997. Water Pipes. Requirements And Tests.3) Carrying Out The Required Tests And Examinations And Preparing Documents Related To Putting The Constructed Water Supply Network And Connections Into Operation And Obtaining An Occupancy Permit, 4) Commissioning The Constructed Network, 5) Providing A Set Of Equipment, Markings, Instructions And Personal Protective Equipment And Collective In The Field Of Occupational Health And Safety And Fire Protection, Required By Specific Regulations For The Proper Operation Of Water Supply Networks, 6) Fees For External Supervision, Tests, Etc., 7) Fees For Carrying Out Construction Works In Road Lanes, 8) Obtaining Technical Acceptance By The Ordering Partys Representative (Maintenance Officer) Water Supply), 9) Inventory And As-Built Documentation, Including Surveying.4. Bills Of Quantities Are Not The Basis For Preparing An Offer By The Valuation Contractor, But Are Only Of Auxiliary And Informative Nature. The Contractor Will Not Be Able To Demand Additional Payment If, At The Implementation Stage, It Turns Out That The Bill Of Quantities Did Not Contain All The Elements Described In The Swz, Construction Design, Technical Specifications For The Execution And Acceptance Of The Works. Before Preparing An Offer, You Should Verify The Provided Bill Of Quantities And The Scope Of Work To Be Performed. 5. Common Procurement Vocabulary - Cpv: 45231300-8 - Construction Works In The Field Of Construction Of Waterworks And Sewage Disposal Pipelines 45000000-7 - Construction Works 45453000-7 - Renovation And Renovation Works 6. It Is Recommended That The Contractor Makes A Site Visit Before Preparing The Offer. The Area Covered By The Order And Its Surroundings, And Also Obtained, On Its Own Responsibility And Risk, Any Additional Information That May Be Necessary To Prepare The Offer, Sign The Contract And Perform The Order. The Cost Of Inspecting The Construction Site Is Borne By The Contractor.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b909c2f2-1e90-451f-a3f8-9ff3e3a14db6.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.