GTR 75994205
Tenders Are Invited For Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno, Ul. Pushkina 5
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
75994205
Tendering Authority
Subscribe to view
Tender No
OW.VII.260.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno, Ul. Pushkina 5
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
04-03-2024
Closed
Work Detail
1. The Subject Of The Order Is The Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno, Ul. Pushkina 5 Implemented As Part Of The Investment Project Titled Reconstruction Of The Kitchen For The Needs Of Pm 7 - Adaptation Of Rooms To Sanitary Requirements. Execution Of Works In The Field Of: 1. Construction: Demolition Works Include: Dismantling Of Internal Door And Window Joinery, Demolition Of Partition Walls And Load-Bearing Walls With Installation Of New Lintels And Beams, Removal Of Burnt Plasters , Wall And Floor Tiles, Removal Of Existing Floor Layers In Accordance With The Design, Dismantling Of Existing Wooden Stairs, Demolition Of A Fragment Of The Ceiling Near The Internal Stairs. Renovation Works Include: Construction Of Foundation Walls Under Load-Bearing Walls And Reinforced Concrete Stairs In The Basement, Construction Of New Stairs Between The Basement And Ground Floor, Construction Of Load-Bearing And Partition Walls With Door Lintels, Additions To Existing And Construction Of New Floor Layers, Installation Of Doors And A Service Window, Construction Of Ceilings Suspended In The Rooms Indicated In The Design, Casing Of Sanitary Installations With Inspection Hatches, Finishing Works, Installation Of Balustrades.2. Sanitary Installation: Demolition Works Include: - Disassembly Of Existing Installations, Sanitary Utensils Along With Their Equipment, Fasteners And Insulation, - Cutting Holes In The Walls, Digging Furrows, Construction And Installation Works Include: Installation Of Galvanized Steel Ventilation Ducts Along With Suspensions, Structures Supports, Dampers And Other Elements Necessary For The Proper Operation Of The Installation, Installation Of Wall Fans And A Kitchen Fan On The Roof, Installation Of An Air Supply Unit, Installation Of A Split Air Conditioner, Installation Of Supporting Structures, Installation Of Air Inlets, Exhaust Vents, Ventilation Grilles With Hangers And Accessories, Installation Of Air Intakes And Exhaust Vents , Installation Of Cleaning Doors, Insulation Of The Ventilation System, - Installation Of Regulation And Control Devices, Installation Of A New Water Installation, Installation Of Pipes With Slings And Fittings, Insulation Of Water Pipes, Installation Of A New Sanitary Sewage System Made Of Pvc Pipes - Installation Of Pipes With Slings And Fittings, Installation Of Fittings, I.E. Shut-Off Valves, Quarter-Turn Valves, Thermostatic Valves, Etc., - Installation Of Sanitary Utensils, E.G. Washbasins, Floor Drains, Frames, Sinks, Siphons And Faucets, Installation Of Hot Water Heaters, - Installation Of A New Heating Installation Made Of Plastic Pipes - Installation Of Pipes With Slings And Fittings, Installation Of Panel Radiators, Thermostatic Heads, With Slings And Accessories, Installation Of Central Heating Fittings, - Insulating Central Heating Pipes, Making Electrical Connections And Automatic Control Of Individual Devices, - Preparing Operating And Maintenance Instructions For Installations, Commissioning Installations And Devices, And Testing In Accordance With Cobrti Instal Requirements, In Particular Tightness Tests, Rinsing, Disinfection, Marking Devices And Flow Directions Etc. - Quality Control Of Materials And Equipment, - Quality Control Of Works.3. Electrical Installation: Demolition Works Include: - Dismantling Of The Old Installation: Cables, Accessories, Lighting Fixtures Within The Scope Of The Study. Construction And Installation Works Include: - Supply Of Electricity To The Modernized Rooms From The Internal Installation, Designed Lv Switchboards, Receiving Installations Of Sockets And Lighting, Installations Supplying Power To Kitchen Technology Devices, Installations Supplying Sanitary Devices, Emergency Lighting Installation, Installation Of Wires And Cables, Laying And Fastening Cables, Installation Of Accessories, Passages Through Walls, - Quality Control Of Materials, - Quality Control Of Works.4. Interior Furnishings: The Works Include: Disassembly, Assembly And Delivery Of Room Furnishings In Accordance With The Design. In Accordance With: 1) Land Development Design And Architectural And Construction Design: Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5” – Architectural Industry, October 2023 Constituting Appendix No. 1 To Swz2) Technical Project Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5” – Construction, Sanitary And Electrical Industries, October 2023. Constituting Appendix No. 2 To Swz3) Interior Design Project: Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5” - Description And List Of Equipment, October 2023. Constituting Annex No. 3 To Swz4) Technical Specification For The Execution And Acceptance Of Construction Works: Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5” – Construction Industry, October 2023 Constituting Annex No. 4 To Swz5) Technical Specification For The Execution And Acceptance Of Construction Works: Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5” – Sanitary Industry, October 2023 Constituting Annex No. 5 To Swz6) Technical Specification For The Execution And Acceptance Of Construction Works: Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5” – Electrical Industry, October 2023 Constituting Annex No. 6 To Swz2. The Ordering Party Provides Information On The Bill Of Quantities As An Aid In Preparing The Offer Price By The Contractor.2.1. Bill Of Quantities Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5 - Construction Industry, October 2023, Constituting Annex No. 7 To Swz2.2 Bill Of Quantities Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5” – Sanitary Industry, October 2023 Constituting Annex No. 8 To Swz2.3 Bill Of Quantities Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5 - Electrical Industry, October 2023. Constituting Annex No. 9 To Swz2.4 Bill Of Quantities - Interior Design Project Renovation And Reconstruction Of The Kitchen With Kitchen Facilities In The Municipal Kindergarten No. 7 In Jaworzno At Ul. Pushkina 5” - Description And List Of Equipment, October 2023. Constituting Annex No. 10 To The Swz
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5a440e2c-7f66-4938-8b2f-190772a8db56.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.