GTR 75938480
Tenders Are Invited For Modernization Of The Restaurant And Hotel Part Of The Bytów Castle - Stage I
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
75938480
Tendering Authority
Subscribe to view
Tender No
BRZ.271.4.2024.AZ
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Restaurant And Hotel Part Of The Bytów Castle - Stage I
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
15-02-2024
Closed
Work Detail
The Subject Of The Order Is The Modernization Of The Restaurant And Hotel Part Of The Bytów Castle. The Scope Of Work Includes: A) Execution Of Water And Sewage Installations - Without White Assembly (Equipment In The Bathrooms Has Already Been Dismantled); B) Construction Of Electrical Installations;C) Construction Of Central Heating Installations;D) Construction Of Ventilation Installations;E) Construction Of Air-Conditioning Installations;F) Expansion Of The Fire Alarm System;G) Construction Of Structured Cabling (Lan) With A Tv Network;H) Construction Of A Call System; I) Construction Of Partition Walls; J) In Hotel Rooms, It Is Necessary To Expand The Hotel Card Switch, The Functionality Of Which Is To Include Powering Air Conditioning Devices; K) The Air Conditioning Control System Should Be Expanded With Window Switches That Turn Off The Air Conditioning When The Window In The Room Is Opened; L) Installation Switches And Plug Sockets As Standard Investment; M) Make Cable Entries For Mounting The Fixtures. Do Not Include Dali System Elements In The Valuation. In Addition, The Contractors Obligations Include: A) Taking Over The Work Site; B) Securing And Fencing The Work Site; C) Locating And Preparing The Construction Site Facilities According To Its Needs And At Its Own Expense; D) Providing The Safety Plan And Health Protection In Accordance With Art. 21A Of The Construction Law Act; E) Providing A Material And Financial Schedule Of Works; F) Providing The Construction Managers Declaration Of Assuming Duties Along With A Complete Set Of Licenses And Certificates Required By Law; G) Ensuring Supervision Of The Property At His Own Expense; H) Ensuring The Consumption Of Electricity And Water At His Own Expense; I) Bearing Full Responsibility For The Application And Safety Of All Activities Carried Out On And Outside The Work Site And Related To The Execution Of The Construction Object, Also In The Case Of Third Parties;J) Tidying Up The Construction Site After Completion Of The Works, Construction Facilities And Adjacent Areas Occupied Or Used By The Contractor, Including Renovation Of Facilities, Roads Or Their Fragments, Surfaces Or Installations, At Their Own Expense, Destroyed Or Damaged As A Result Of The Works; K) Immediately Informing The Ordering Party (Investor Supervision Inspector) About Technical Problems And Circumstances That May Affect The Quality Of The Works Or The Date Of Completion Of The Works; L) Providing The Ordering Party With All Documents Necessary To Settle The Investment And Report The Completion Of Construction To The Competent Construction Supervision Inspector. The Detailed Scope Of Works Was Included In The Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works, Which Constitute Annex No. 10 To The Swz. The Attached Bills Of Quantities Constitute Auxiliary Material For The Valuation. The Contractor Undertakes To Perform The Subject Of The Contract In Accordance With The Documentation, Principles Of Technical Knowledge And Construction Practice, Applicable Regulations And Standards, Under The Conditions Specified In The Contract And Swz. The Bill Of Quantities Is Illustrative Material. If References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In The Documentation Describing The Subject Of The Order, The Ordering Party Allows Solutions Equivalent To Those Described. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Design Documentation Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Documentation Describing The Subject Of The Contract, It Means That They Are Provided As Examples And Specify Only The Minimum Expected Quality Parameters And Required Standard. The Contractor May Use Equivalent Materials Or Devices, But With Similar Or Better Technical And Quality Parameters, The Use Of Which Will In No Way Adversely Affect The Proper Functioning Of The Solutions Adopted In The Design Documentation. The Contractor Who Uses Equivalent Devices Or Materials Will Be Obliged To Demonstrate In During The Execution Of The Order, That The Equipment And Materials Used By Him Meet The Requirements Specified By The Ordering Party. The Use Of A Label In The Documentation Describing The Subject Of The Order Means That The Ordering Party Accepts All Labels Confirming That Given Construction Works, Supplies Or Services Meet The Equivalent Requirements Of The Label Specified By The Ordering Party. If The Contractor, For Reasons Beyond Its Control, Cannot Obtain The Label Or Equivalent Label Specified By The Contracting Authority, The Contracting Authority, Within The Time Limit Set By Itself, Accepts Other Appropriate Means Of Evidence, In Particular The Manufacturers Technical Documentation, Provided That The Contractor Proves That The Construction Works , Deliveries Or Services To Be Performed By Him Meet The Requirements Of A Specific Label Or Specific Requirements Indicated By The Ordering Party. The Use In The Documentation Describing The Subject Of The Contract Of The Requirement To Have A Certificate Issued By A Conformity Assessment Body Or A Report On Tests Carried Out By This Body As Evidence Confirming Compliance With The Requirements Or Features Specified In The Description Of The Subject Of The Contract, The Offer Evaluation Criteria Or The Terms Of Contract Execution Means That The Contracting Authority Also Accepts Certificates Issued By Other Equivalent Conformity Assessment Bodies. The Ordering Party Also Accepts Other Appropriate Means Of Evidence, In Particular The Manufacturers Technical Documentation, In The Event That A Given Contractor Has Neither Access To Certificates Or Test Reports Nor The Possibility Of Obtaining Them In An Appropriate Time, Unless This Lack Of Access Cannot Be Attributed To A Given Contractor. , And Provided That The Contractor Proves That The Construction Works, Supplies Or Services Performed By Him Meet The Requirements Or Criteria Specified In The Description Of The Subject Of The Contract, The Offer Evaluation Criteria Or The Requirements Related To The Implementation Of The Contract. If The Description Of The Subject Of The Order Includes A Provision Resulting From Knr Or Knnr Indicating The Need To Use Specific Equipment With Specific Parameters In The Execution Of The Order, The Ordering Party Allows The Use Of Other Equipment Provided That It Will Ensure The Achievement Of The Assumed Design Parameters And Will Not Cause The Risk Of Non-Compliance Of The Work Performed With The Technical Documentation.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
df05f9cd-33e2-4bfd-8421-96b16572c831.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.