GTR 75881473
Tenders Are Invited For Construction Of A Photovoltaic Installation For The Municipal Office Of The Stęszew Commune
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
75881473
Tendering Authority
Subscribe to view
Tender No
IN.271.6.6.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Photovoltaic Installation For The Municipal Office Of The Stęszew Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
13-02-2024
Closed
Work Detail
The Subject Of The Order Is: Construction Of A Photovoltaic Installation For The Municipal Office Of The Stęszew Commune. Subject Of The Orderthe Subject Of The Order Includes The Preparation Of Technical Documentation With The Necessary Arrangements And Obtaining Possible Consents For Implementation, If Its Scope Requires It, Delivery And Assembly Of 1 Set Of Brand New Photovoltaic Installations (Devices And Installation Elements). , Preparation Of As-Built Documentation And Commissioning Of The Photovoltaic Panel System Generating Electricity, As Well As Any Other Activities Necessary For The Proper Performance Of The Order Or Required In Accordance With Applicable Law. The Subject Of The Order Will Be Installed On Municipal Buildings At Ul. Poznańska 11A (Osp Stęszew Building, 62-060 Stęszew) Ul. Poznańska 11 (Ug Stęszew Building, 62-060 Stęszew). Installation Of A Photovoltaic Installation With Accompanying Infrastructure At Ul. Poznańska 11A, And Connection To The Internal Power Installation At Ul. Poznańska 11. The Installed Photovoltaic Panels And The Connection To The Internal Power Grid Are Located At Two Different Addresses. These Are The Neighboring Buildings. The Installation Between The Buildings Should Be Laid In The Ground In Accordance With Construction Practice And Applicable Regulations (The Section Between The Buildings Is Partly A Green Area, An Area Covered With Asphalt And A Parking Area Made Of Paving Stones). The Area Through Which The Installation Is To Pass Should Be Restored To Its Original Condition After The Works Are Completed. A Set Of Photovoltaic Installations Means An Installation With A Minimum Power Of 35 Kwp, For Which The Minimum Annual Production Will Be 35 Mwh. The Contractor Must Make Cable Passages Through Partitions (Walls). ), Conducting Them In The Field And Securing Them. The Contractor Is Responsible For Providing Protection And A Fire Protection Switch For The Installation And Its Clear Markings. The Contractor Is Responsible For Installing A Total Electricity Production Meter (Gross) With A Display (Including One Enabling The Presentation Of The Energy Production Volume Electricity For A Given Day). The Contractor Will Notify (In Consultation With The Installation User) The Electricity Seller About The Preparation Of Connection Documentation - Notification To The Dso. The Contractor Will Train The Ordering Partys/Users Employees In The Field Of Safe Operation, Maintenance And Operation. The Contractor Will Tidy Up The Place Of Work After Completing The Installation And Will Repair Any Damage. Social Clause: The Ordering Party Requires That Persons Performing The Services Specified In The Documentation Be Employed Under An Employment Contract By The Contractor Or Subcontractor, With The Exception Of Persons Whose Duties Do Not Consist In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws 2022.1510, I.E. Of 2022/07/19). Each Time At The Request Of The Ordering Party, Within A Period Specified By The Ordering Party, Not Shorter Than 5 Business Days, The Contractor Undertakes To Submit For Inspection Copies Of Employment Contracts Concluded By The Contractor With Employees Providing Services. Failure Of The Contractor To Submit Copies Of Contracts Concluded By The Contractor With Employees Providing Services Within The Specified Period By The Ordering Party In Accordance With Point 2 Will Be Treated As Failure To Fulfill The Obligation To Employ Employees Providing Services Under An Employment Contract. For Failure To Meet The Requirement To Employ Employees Providing Services Under An Employment Contract Within The Meaning Of The Provisions Of The Labor Code, The Contractor Will Pay The Ordering Party Contractual Penalties In The Amount Specified In The Draft Contract Attached To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d5bedbc1-203f-46a9-9395-90cf5a6e0ec1.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.