GTR 75716589
Tenders Are Invited For Reconstruction Of The Water Treatment Plant In Małków Commune. Guard
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
75716589
Tendering Authority
Subscribe to view
Tender No
WOA.271.4.2024.Zp
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Water Treatment Plant In Małków Commune. Guard
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
16-02-2024
Closed
Work Detail
3.1 Subject Of The Order: Reconstruction Of The Water Treatment Plant In Małków, Commune. Warta.3.2 The Subject Of The Planned Investment Is The Reconstruction Of The Water Treatment Plant In Małków In The Warta Commune. The Water Supply Station In Małków Based On Two Deep Wells S1 On Plot 226/1 And S2 On Plot 216/2 Is Used To Supply Water To The Bartochów Group Waterworks And Periodically To The Warta Waterworks.3.3 The Subject Of The Order Includes The Following Construction Works:3.3. 1 Reconstruction Of S1 And S2 Deep Wells - New Above-Ground Casings With Fittings And Piping Are Designed; 3.3.2 Replacement Of Technological Pipelines Along With Automation Of The Water Treatment Process; 3.3.3 Renovation Of Expansion Tanks; 3.3.4 Construction Of A Filter Rinsing System; 3.3.5 Construction Of Control And Measurement Equipment And Automation (I&C);3.3.6 Development Of The Area Of Plot 226/1 (Installation Of A Container Casing For The Installation Of The Switchboard Supplying The Suw, Reconstruction Of The Fence And Hardening Of The Area).3.4 The Station Will Be An Unattended Facility With Full Automation Of Technological Processes, Ensuring The Achievement Of Drinking Water Of A Quality Consistent With The Regulations In Force In This Regard.3.5 While Performing Construction Works, The Contractor Is To Ensure Continuity Of Water Supply For The Duration Of Construction Works. Water Supplied To Consumers Should Have Appropriate Quality Parameters Specified In The Relevant Regulations. 3.6 Technology And Structure Elements Subject To Dismantling Should Be Disposed Of After Consultation With The Network Ordering Party. The Ordering Party Allows For The Recovery Of Some Elements. The Place Of Disposal Of Rubble, Spoil Or Other Waste Generated During Construction Works, Together With Their Disposal In Accordance With The Relevant Regulations, Remains The Responsibility Of The Contractor And Constitutes Its Expense. Water Quality Tests And The Obligation To Maintain Water Parameters According To Sanepid Guidelines At Individual Stages Of The Investment On The Contractors Side. The Acceptance Documents Should Include The Results Of Raw Water Testing For Each Well, The Results Of Testing The Treated Water After The Filters And After The Tank And At The Outlet To The Network. 3.7 A Detailed Description Of The Subject Of The Order Is Included In The Technical Documentation - Construction Design, Technical Specifications, Cost Estimates (Auxiliary Material ), Building Permit, Notification Of Works Constituting Annex No. 11 To Swz.3.8 Due To The Fact That The Construction Design Was Carried Out In 2016 And Since Then There Has Been A Significant Degradation Of Individual Elements Of Water Treatment Technology That Were Not Covered By The Scope Of The Construction Design, The Ordering Party Was Forced To Prepare A New Description Of The Water Treatment Technology That Meets The Current Needs. Therefore, Chapter Iii Technological Sector Of The Construction Project Does Not Apply, And The Bidders Must Base The Valuation On The Basis Of The Attached Draft Changes To The Technology Description, Which Constitutes Annex No. 12 To Swz.3.9 Due To The Fact That Only A New Description Of The Water Treatment Technology Was Prepared, Which Does Not Present All Detailed Solutions, Such As The Arrangement And Dimensions Of Supports Which, Due To The High Density Of Equipment And Technological Pipelines In The Suw Building, May Significantly Affect The Safety Of Operation And Comfort Of Use. The Ordering Party Requires The Contractor To Attach To The Offer: 3.9.1 Technological Diagram Water Treatment Plant;3.9.2 3D Visualization Of The Technology Installed Inside The Building. The Visualization Should Present All Technological Devices Of The Support And Must Reflect The Internal Surfaces Of The Building Of Technological Rooms In Which Technological Devices Are Installed. 3.9.3 Plans, Views And Cross-Sections With The Dimensions Of Passages And Access Points As Well As The Diameters And Descriptions Of Technological Pipelines, Fittings And Installed Devices. 3.10 The Contractor Will Prepare As-Built Documentation. 3.11 The Required Warranty Period For Construction Works Is At Least 36 Months.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ff1e93f6-ccb3-47af-ae2e-e146646d02f3.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.