GTR 75716517

Tenders Are Invited For Reconstruction Of Municipal Roads In Wicie

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
75716517
Tendering Authority
Subscribe to view
Tender No
ZP.271.39.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Municipal Roads In Wicie
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-02-2024 Closed
Work Detail
1. The Subject Of The Order Is Reconstruction Of Municipal Roads In Wicie.2. Common Public Procurement Dictionary (Cpv Codes): 45233120-6 Road Construction Works; 45233123-7 Minor Road Construction Works; 45111200-0 Construction Site Preparation And Earthworks; 45233000-9 Construction, Foundation And Paving Works Of Highways And Roads; 45316110-9 Installation Of Road Lighting Devices; 45232130-2 Construction Works Of Storm Water Pipelines; 45230000-8 Construction Of Pipelines, Communication And Power Lines, Highways, Roads, Airports And Railways; Land Leveling 32520000-4 Telecommunications Equipment And Cables 32521000-1 Telecommunications Cables3. The Area Related To The Investment In Question Includes Wczasowa And Morska Streets Within The Wicie Commune. Darłowo Plots: 68/1, 98/17, 98/39, 98/28, 100/13, 98/29, 100/6, 98/7, 101/2, 115/3, 124/30, 124/41 , 124/77, 115/4, 98/8, 98/16 (Ul. Wczasowa); 68/1, 91/2, 90/2, 89 (Ul. Morska). The Scope Of The Investment Includes The Reconstruction Of The Road, Roadsides, Intersections And Exits With A Total Length Of Approximately: Morska Street - 309 M, Wczasowa Street - 972.69 M, Construction Of Sidewalks And Pedestrian Routes, Parking Lots, Construction Of Rainwater Drainage, Relocation Of Water And Sewage Networks, Construction Of Lighting. , Removal Of Electricity Conflicts, Reconstruction Of The Telecommunications Network. 4. The Expected Scope Of Works For The Investment In Question Includes: 1) Construction Of Road Surfaces, Sidewalks, Individual Exits, Public Exits, Intersections, Parking Lots With A Total Area Of ​​Approximately: 9,603.7 M2 - Concrete Paving Stone Surfaces (Ul. Holiday); 1,524.00 M2 - Surface Made Of Mineral-Bituminous Mixtures, 679.00 M2 - Surfaces Made Of Concrete Paving Stones (Ul. Morska).2) Construction Of Street Lighting Throughout The Investment - 28 Light Points. Note: The Ordering Party Changes The Proposed Fixtures In The Design Documentation. In Order To Illuminate Pedestrian Routes And Streets, We Plan To Install Lighting Points Using Led Luminaires With A 50% Reduction In Power Level, Which Operates For 3 Hours. Before Virtual Midnight And 5 Hours After It. The Luminaire Is Intended For Mounting On A Boom Or Directly On A Pole, The Diameter Of The Boom End Should Be 60 Mm. The Fixture Should Be Able To Adjust The Angle Of Inclination From -15 To 20 Degrees. The Luminaire Is Made Of Aluminum Or Aluminum Alloy, The Colors Of The Luminaires According To The Requirements Of The Ordering Party. Safety Class Ii, Mechanical Resistance Min. Ik09. Led Efficiency Minimum 134Lm/W On The Fixture. Optical Module Mounted On The Surface Of The Heat Sink, Ip66 Led Module And Luminaire Power Supply. Total Power Of The Luminaire Max. 36W/5900 Lm. Light Color Temperature 4000K. Surge Protection: 10Kv Against Single Pulse And 8Kv/6Kv Against Multiple Pulses. The Luminaire Should Achieve Class A++ Energy Efficiency, Which Should Have A Direct Impact On Reducing Operating Costs And Have A Positive Impact On The Natural Environment. Color Rendering Index Cri Above 70. The Fixture Is Designed To Operate At Temperatures From -40 To 40 Degrees C. Manufacturers Warranty For The Complete Fixture Is At Least 5 Years. The Luminaire Should Be Equipped With A Power Supply Equipped With The Necessary Protections: Overvoltage, Short-Circuit And Protection Protecting The Leds Installed In The Luminaire Against Overheating. 3) Construction Of A Rainwater Drainage System, 4) Removal Of Collisions With Technical Infrastructure Related To The Construction Of The Road, 5) Installation Of Vertical And Horizontal Markings, 6) Securing The Existing Land Infrastructure Networks, 7) Cutting Down Trees And Bushes And Creating Roadside Greenery In The Form Of Lawns In The Road Area, 8) As Part Of The Investment, Necessary And Necessary Works Will Also Be Carried Out To Connect To The Existing Development, 5. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works Constituting Annex No. 6 To Swz.6. The Contractor Will Be Responsible For Full Geodetic Services, Including Post-Construction Geodetic Inventory. 7. When Performing The Subject Of The Order, The Contractor Will Be Obliged To Provide Access To The Adjacent Properties Where The Investment Is Being Carried Out.8. Based On Article. 95 Section 1 Of The Act, The Ordering Party Requires That The Contractor Or Subcontractor(S) Employ On The Basis Of An Employment Relationship Within The Meaning Of Art. 22 § 1 Of The Act Of June 26, 1974, Labor Code (Journal Of Laws Of 2023, Item 1465), All Persons Who Will Perform The Work Indicated By The Ordering Party In § 5 Section 1 Of The Draft Contract, Activities Related To The Implementation Of The Order.9. Whenever The Procurement Documents Indicate Trademarks, Patents Or Origin, Source Or Specific Process That Characterize The Products Or Services Provided By A Specific Contractor, The Words Or Equivalent Are Added After Their Wording. The Ordering Party Allows The Use Of Equivalent Materials And Products, Provided That The Proposed Materials And Products Meet The Criteria Used By The Ordering Party To Assess Equivalence. If The Contractor Offers Equivalent Materials Or Products, The Contractor Is Obliged To Submit A Description Of The Equivalent Materials And Products With The Offer And Demonstrate That They Meet The Criteria Used By The Ordering Party To Assess Equivalence.10. If There Are References To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Act, Equivalent Solutions Are Allowed. If Equivalent Solutions Are Offered, The Contractor Is Obliged To Submit A Description Of Equivalent Solutions With The Offer And Demonstrate That They Meet The Requirements Specified By The Ordering Party. Whenever In The Description Of The Subject Of The Contract There Are References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems, The Phrase Or Equivalent Is Added After Each Of Their Wording.11. The Contractor Selected In The Proceedings In Question Will Be Obliged To Provide The Ordering Party With A Detailed Offer Cost Estimate And A Material, Financial And Time Schedule Within 7 Calendar Days From The Date Of Conclusion Of The Contract In Accordance With Annex No. 7 To Swz.12. The Task In Question Is Titled: Reconstruction Of Municipal Roads In Wicie Will Be Carried Out With Funds From The Government Road Development Fund.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
3da64cae-6ee9-413e-8276-da79decdd0f3.html
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders