GTR 75675646
Tenders Are Invited For Performance Of Construction Works Within The Scope Of The Project Regarding The Consolidation Of Land Located In The Area Of The Village Of Rzeplin, Pruchnik Commune, Implemented Under The Rural Development Program For 2014-2020.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
75675646
Tendering Authority
Subscribe to view
Tender No
ZP.272.4.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Performance Of Construction Works Within The Scope Of The Project Regarding The Consolidation Of Land Located In The Area Of The Village Of Rzeplin, Pruchnik Commune, Implemented Under The Rural Development Program For 2014-2020.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
09-02-2024
Closed
Work Detail
1. The Subject Of The Order Is The Performance Of Construction Works Within The Meaning Of The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2023, Item 682, As Amended) As Part Of Post-Consolidation Development Works Within The Scope Of The Project Under The Name Consolidation Of Land Located In The Area Of The Village Of Rzeplin, Pruchnik Commune Implemented Under The Rural Development Program For 2014-2020, In Order To Prepare Newly Designated Plots For Rational Agrotechnical Works.2. Construction Works Constituting The Subject Of The Order Include: 1) Construction And Reconstruction Of Access Roads To Agricultural And Forest Lands And Access Roads To The Buildings Of Individual Consolidation Participants; 2) Construction Of Culverts Under Roads With Reinforcements At The Entrances And Exits To The Plots; 3) Construction, Renovation And Correction Of The Route Of Facilities Water Improvement, I.E. Drainage Ditches And Drainage And Water Disposal Systems, As Well As Improvement Of Their Technical Parameters; Construction Of Fords On Streams, Ensuring Access To The Plots; 4) Land Reclamation, Including The Removal Of High And Unnecessary Balks, Slopes And Fallow Areas, Ravines And Old Roads By Fertilizing Soil, Plowing And Harrowing, Anti-Erosion Protection And Removal Of Trees And Bushes; 5) Other Works , Including: Relocating The Pole From The Internet, Building An Inspection Well, Bringing In Soil And Strengthening The Slope, Leveling The Plot/Removing The Old Ditch, Clearing/Leveling The Area, Leveling And Rebuilding The Ditch, Constructing Covered Ditches, Drainage Of Washed Fields.3. A Detailed Description Of The Subject Of The Order Constituting The Subject Of This Agreement And The Scope Of Construction Works Necessary To Be Performed Are Specified In The Design And Technical Documentation, Which Includes: 1) Construction Design: Reconstruction Of Roads, Construction Of Ditches And Recultivation As Part Of The Task: Post-Consolidation Development Of Land In The Area Of The Village Of Rzeplin, Commune Pruchnik, In The Scope Of The Project Regarding Land Consolidation Under The Rural Development Program For 2014-2020: A) Land Development Design, B) Architectural And Construction Design, C) Technical Design; 2) Executive Design Reconstruction Of Roads, Construction Of Ditches And Recultivation As Part Of The Task : Post-Consolidation Development Of Land In The Area Of The Village Of Rzeplin, Pruchnik Commune, In The Scope Of The Project Regarding Land Consolidation Under The Rural Development Program For 2014-2020;3) Decisions, Opinions, Arrangements, Technical Conditions;4) Maps;5) Geotechnical Documentation;6) Bioz;7) Bills Of Quantities Prepared For Individual Industries/Works.8) Technical Specifications For The Execution And Acceptance Of Construction Works.4. The Bills Of Quantities Provided By The Ordering Party, I.E. Both Their Scope And The Measurements Included Therein, Should Constitute Only The Basis For Preparing An Accurate Valuation Of The Construction Works Constituting The Subject Of The Order. All Works Described In The Bills Of Quantities For This Order Should Be Valued, Taking Into Account Any Differences Between These Bills Of Quantities And The Design And Technical Documentation, As Well As All Direct And Indirect Costs That The Contractor Deems Necessary In Order To Properly Perform The Subject Of The Order And Achieve The Intended Purpose. Serve.5. Both The Scope Of The Bills Of Quantities Prepared For Individual Industries/Works And The Measurements Contained Therein Should Be Treated As Illustrative And As Auxiliary Materials Intended To Facilitate The Correct Calculation Of The Lump-Sum Offer Price In The Manner Described In The Swz. They Cannot Constitute The Only Basis For Preparing An Accurate Valuation Of Construction Works Constituting The Subject Of The Contract, As They Will Not Be Binding On The Ordering Party At The Execution Stage.6. In The Event Of Differences Between The Design And Technical Documentation Referred To In Section 3, And The Bills Of Quantities Referred To In Section 4, For The Valuation It Should Be Assumed That The Subject Of The Order Is Specified In The Design And Technical Documentation, I.E. Architectural And Construction Design, Technical Design, Executive Designs, Decisions, Opinions, Arrangements, Technical Conditions, Geotechnical Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works. Works (Works) Covered By The Design And Technical Documentation And Not Included In The Bills Of Quantities Will Not Be Treated As Additional Works. All Works Necessary For The Proper Execution Of This Order Must Be Valued.7. As Part Of The Execution/Execution Of The Order, In Accordance With The Provisions Of The Swz And The Contract Concluded For The Execution Of The Order, The Contractor, With Its Own Efforts And At Its Own Expense: 1) Will Provide A Construction Manager With Appropriate Qualifications To Manage The Construction Site And The Necessary Construction Licenses, In Accordance With The Provisions Of The Act Of July 7 1994 Construction Law And Belonging To The Appropriate Chamber Of Professional Self-Government And Having The Required Civil Liability Insurance; 2) If Necessary Or Required By Law, It Will Provide Managers Of Industrial Works With The Necessary Construction Qualifications, In Accordance With The Provisions Of The Act Of July 7, 1994 Construction Law And Those Belonging To The Relevant Chambers Of Professional Self-Government And Having The Required Civil Liability Insurance;3) Within 30 Days From The Date Of Concluding The Contract For The Execution Of The Order, Submit Appropriate Applications To The Competent Authority For Permission To Cut Down Trees;4) Provide The Owners Of The Plots Wood From The Felling Of Trees And Bushes;5) Will Manage Waste Generated In The Course Of Its Own Works And Will Bear The Costs Of Its Removal Along With The Costs Of Storage And Disposal;6) If Necessary Resulting From Legal Provisions, Will Report To The Appropriate Authorities For The Collection Of Completed Works. Inspections, Services And Guards, And Will Pay Fees For The Acceptance Of Completed Works By Relevant Inspections, Services And Guards.8. The Contractor Will Be Obliged To: 1) Provide The Ordering Party With A Warranty And Quality Guarantee For The Completed Subject Of The Order (Construction Works) For The Period Declared By The Contractor In The Submitted Offer, Counted From The Date Of Receipt Of The Entire Subject Of The Order Without Reservations, Which Cannot Be Shorter Than 36 Months;2 ) Properly Handle Waste Intended For Disposal, I.E. In The Manner Specified In The Provisions Of The Act Of December 14, 2012 On Waste (Consolidated Text: Journal Of Laws Of 2023, Item 1587, As Amended) And The Act Of 13 September 1996 On Maintaining Cleanliness And Order In Municipalities (Consolidated Text: Journal Of Laws Of 2023, Item 1469, As Amended);3) Bear All Costs Necessary For The Proper Performance Of The Order, Including All Fees Related To Performance Of The Contract, Previously Unforeseen And Arising During Or As A Result Of The Implementation Of Works / Works Related To The Execution Of The Order / Contract; 4) In The Event Of A Need To Perform Replacement Works, To Perform Them Without Charging The Ordering Party With Additional Unjustified Costs; 5) In The Event Of A Need To Perform Execution Of The So-Called Additional Works, To Be Performed On The Basis Of The Same Price Factors (R, S, Kp, Kz, Z) That Will Be Shown In The Bid Cost Estimate, And If There Are No Such Price Factors In The Submitted Bid Cost Estimate And Their Interpolation Is Not Possible, On Based On Price Factors Included In The Current Sekocenbud Price Lists.9. The Contractor Will Be Obliged To Perform The Subject Of The Order In Accordance With Applicable Law, The Provisions Of The Swz, The Provisions Of Its Own Offer And The Conditions Specified In The Provisions Of The Draft Agreement, Constituting Annex No. 8 To The Swz.10. Note: If The Description Of The Subject Of The Order Uses Proper Names Of Products Or Products, Manufacturers, Brands Or Trademarks, Patents Or Origin, Source Or Specific Process, It Serves Only To Determine The Parameters Of The Ordered Supplies, Services Or Construction Works Or Products Or Products, Quality Standards , Technical And Functional, And Specifying The Description Of The Subject Of The Order, And Not Selecting Or Preferring A Specific Product Or Product, Manufacturer Or Supplier. The Ordering Party Allows The Submission Of Equivalent Offers. An Equivalent Offer Is An Item (Product Or Product) With The Same Or Better Functional, Technical And Quality Parameters, Meeting The Minimum Parameters Specified Or Described By The Ordering Party In Documents Describing The Subject Of The Order Using Proper Names Of Products Or Products, Manufacturers, Brands Or Trademarks, Patents. Or Origin, Source Or Particular Process. If The Description Of The Subject Of The Contract Includes References To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2) And Section 3 Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described. The Ordering Party Informs That In The Event Of A Possible Use Of A Trademark In The Description Of The Subject Of The Order, An Equivalent Offer Is Considered To Be An Offer That Individually Meets The Parameters Of The Indicated Product Or Product Specified By Its Manufacturer. A Contractor Who Refers To Solutions Equivalent To Those Described By The Ordering Party Is Obliged To Demonstrate That The Item (Product Or Product) He Offers Meets The Requirements Specified By The Ordering Party. In Such A Case, The Contractor Must Submit Appropriate Documents Describing The Functional, Technical And Quality Parameters, Certificates Required By Law And Other Documents Allowing The Given Item (Product Or Product) For Use And Making It Possible To Clearly State That It Is Equivalent, Otherwise The Offer Will Be Rejected.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
90f03fe1-396f-42fd-a0fa-a50c9a10ea33.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.