GTR 75663715

Tenders Are Invited For Construction Work - Renovation Of The Millennium Pavilion

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
75663715
Tendering Authority
Subscribe to view
Tender No
49960-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Renovation Of The Millennium Pavilion
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
11-03-2024 Closed
Work Detail
Construction Work - Renovation Of The Millennium Pavilion. Renovation Of The Millennium Pavilion (Hereinafter: Project). Request For Tenders By The Ministry Of Human Resources Iii/111-3/2020. No Receives Budget Support, Which The Tenderer Is 2627 Zebegény, János-Hegy Utca 12. (Hrsz.: 824) Intends To Use It For The Transformation, Renovation And Expansion Of The Property. The Total Net Floor Area Of ​​The Property: 1283 M2, The Event Building Has A Maximum Capacity Of 280 People Suitable For Reception. As Part Of The Renovation, The Building With A Floor Area Of ​​650 M2 Is A Wooden Load Carrier Frame Structure, Large-Span, Visible Structure With A Full-Length Wooden Deck Chair Will Be Rebuilt, Which Will Be In Several Rooms Of The Building (Event Rooms And Lobby Planned In An Area Of ​​512 M2) Is Also Made With Visible Beams. The Building Has A Large Span Wooden Roof Chair With A Wooden Carpentry Structure That Is Designed Without Intermediate Supports Is Made, Where The Distance Between Supports Is 9 Meters On Average. The Implementation In The Framework Of The Contract, The Task Of The Successful Tenderer Is In Particular: The Property Into An Event Building Transformation, Which Requires, Among Other Things, The Development Of Appropriate Kitchen Technology, The Complete Sub-Basement, Separate Rooms And The Caterer Necessary To Supply The Event Space Service Functions Necessary For The Operation Of Units (Café, Bistro, Patisserie). Design, An Elevator Providing Traffic In Order To Pass Each Space Properly Installation And Creation Of A Guest Staircase. The Subject Of The Construction Investment Relating To The Property All Construction Work Necessary For The Implementation Of Training Tasks (The Building Is Partial Demolition, Transformation And Renovation) As Follows (For Information Only): - Demolition Works (Demolition Of Reinforced Concrete Wall - 111.93 M3; Demolition Of Concrete Foundations - 982.53 M2; Demolition Of Load-Bearing And Infill Masonry – 508.82 M3; Demolition Of Wooden Roof Structure – 947.6 M2; Demolition Of Linoleum Covering – 651.15 M2) - Formwork (Double-Sided Wall Formwork With A Vertical Or Inclined Plane Surface - 2518.84 M2; Flat Sheet Formwork – 920.11 M2 ) - Scaffolding (Adjustment Of Facade Pipe Scaffolding From Scaffold Pipe – 2184 M2) - Earthwork (Creating A Soil Improvement Layer – 177.85 M3; Excavation Of A Working Pit, Buildings And Structures In Place With Mechanical Power - 900 M3; Trenching - 1795 M2) - Paving Works (Reinforced Concrete Production Of Strip And Base Plate Foundations – 240.98 M3; Production Of Precast Concrete – 61.87 M3) - On-Site Concrete And Reinforced Concrete Work (Production Of A Reinforced Concrete Wall - 240.98 M3; Flat Or Sub-Ribbed Production Of Reinforced Concrete Slab – 310.27 M3) - Masonry And Other Masonry Work (Load Bearing And Making Infill Masonry – 46.25 M3; Construction Of Floor Channel Masonry – 74.36 M2) - Plastering And Subsequent Facade Thermal Insulation (Exterior And Interior – 8849 M2) - Dry Construction Works (Making A Partition Mounted On A Metal Frame Structure - 30.8 M2; Metal Creation Of A Retaining Wall Mounted On A Frame Structure – 61.82 M2) - Carpentry (Wooden Roof Structure Construction – 919.12 M2; Making A Glass Slab – 23.1 M2) - Roofing (Large Roof Structure Construction – 594.72 M2; Construction Of Tower Structures – 324.4 M2; Crest Formation – 205.36 Fm) - Tinning (Construction Of Wall Edges – 57.84 Fm; Construction Of Gutter – 284.56 Fm) - Facade Construction Of Light Structure Walls And Wooden Cladding (Light Structure Wall Construction – 397.44 M2; Construction Of Coffered Wooden Wall Covering – 104.41 M2) - Shutter Placement Of Structures (Facade Doors And Windows And Interior Doors And Windows – 139 Pcs) - Locksmith Placement Of Structures (Design Of Unique Mechanical Floor Grid – 36 Pcs.; Unique Wall Decorative Grid – 18 Pcs) - Surface Preparation (Surface Preparation For Interior Painting – 2997.8 M2; Wallpapering Preparation – 235.18 M2; Cleanliness Painting – 1088.11 M2, Plastic Dispersion Wall Painting – 2997.8 M2) - Insulation Works (Solvent/Solvent-Free Cold Bitumen Glaze Qualification – 1523.94 M2; Insulation Against Working Water On The Floor And Walls – 132.92 M2; Plinth Waterproofing Of Walls – 228.44 M2; Elevator Sink Insulation – 40.21 M2) - False Ceilings Production (Production Of Plasterboard False Ceiling - 284.14 M2; Cassette Removable False Ceiling Construction – 269.97 M2) - Construction Of Internal Coverings (Construction Of Polished Concrete Surface – 532 M2; Creation Of Synthetic Resin Flooring – 128.5 M2; Ceramic Plinth Design – 280.1 Fm) - Assembly Of Carpentry And Glass Structures In A Water Block (Individual Glazed Shower Walls - 3 Pcs.; Washstands – 2 Pcs) - Individual Built-In Furniture And Decorative Elements Placement (Fire Tap Cabinet – 2 Pcs; Profiled Wooden Ledges – 172.54 Sq M) - Water Supply And Sewerage Works (Installation Of Galvanized Pipe - 53 Fm; Five-Layer Drinking Water Pressure Pipe Location – 671 Sq M) - Heating-Cooling Installation Works (Outdoor Heating, Additional Insulation Of Wires - 95 Fm; Insulation Of Heating Lines – 1400 Fm) - Air Technology Installation Works (Insulation Of Civil Engineering And Industrial Pipelines – 441 M2; Outdoors Additional Insulation Of Installed Ventilation Ducts – 58 M2) - Protective Pipes, Cable Trays Placement (Placement Of Flexible Insulating Protective Pipe - 1630 M; Perforated Steel Plate Placement Of Cable Tray – 170 M) - Wiring And Cabling Tasks (Nyy-J Cable Placement On Cable Tray - 390 Fm; Placement Of Nyy-O Cable On Cable Tray - 340 Fm) - Design Of Fittings, Switches, Connectors (Installable Plastic Parapet Channel Placement – ​​3 M) - Placement Of Light Fixtures (Led Attached To The Inner Side Of The Railing Placement Of Lighting With Aluminum Profile - 12 Fm; Placement Of Led Strip Lighting Monolithic Plasterboard In A False Ceiling, In A Teased Section, Edge Lighting Next To The Wall – 14 Fm) - Design Of Distribution Equipment (Design Of Fire Protection Disconnect Panel – 1 Piece; Design Of Main Distribution Equipment - 1 Pc) - Safety Lighting System Creation (Placing A Ceiling-Mounted Safety Lighting Fixture With An Led Light Source – 18 Pieces; Recessed Safety Lighting Fixture With Led Light Source – 26 Pcs) In View Of Character Limitation, Continuation In Point Bt-300 (Ii.2.14).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
77d2de9c-b549-49eb-8223-38fdd2aa9a54.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders