GTR 75513295

Tenders Are Invited For Expansion And Reconstruction Of A Public Building At Ul. Pułaskiego 10 In Szczytno

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
75513295
Tendering Authority
Subscribe to view
Tender No
GM-P.271.2.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion And Reconstruction Of A Public Building At Ul. Pułaskiego 10 In Szczytno
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
06-02-2024 Closed
Work Detail
1. The Subject Of The Public Procurement Is The Implementation Of Construction Works Consisting In: Expansion And Reconstruction Of A Public Utility Building Located On Plot No. 112, District 3, Szczytno, Ul. K. Pułaskiego 10 In Szczytno.2. The Following Works Should Be Performed As Part Of The Project: 1) Demolition Of The Existing Concrete Sidewalk To The Building, 2) Demolition Of The Concrete Band Around The Building, 3) Demolition Of Window Wells, 4) Demolition Of External Stairs To The Basement Rooms, 5) Demolition And Reconstruction Of The Fragment Of The Fence Leading To The Building To Enable Insulation Of Basement Walls And Thermal Modernization Of Above-Ground Walls,6) Construction Of New Sidewalks,7) Construction Of A New Strip Around The Building,8) Construction Of New External Stairs To The Basement,9) Construction Of New Main External Stairs With A Ramp For Disabled People,10) Dismantling Windows And Doors,11) Dismantling Parts Of Partition Walls,12) Dismantling Internal Stairs,13) Dismantling Ventilation Chimneys,14) Removing Plasters, Ceramic Tiles, Etc.,15) Dismantling Roof Covering, Gutters And Downpipes,16) Dismantling Floors Etc.,17) Widening Window And Door Openings, Making New Penetrations, Lintels, Etc.,18) Making New Internal Stairs,19) Making Fire Partitions For Walls And Ceilings,20) Bricking Up The Openings,21) Making New Partitions And Load-Bearing Walls,22 ) Renovation Of Inter-Story Ceilings Together With Replacement Of Floor Layers, Etc. With Possible Strengthening,23) Possible Strengthening Of The Roof Structure, Replacement Of Rafters,24) Construction Of New Ventilation Chimneys,25) Installation Of New Window And Door Joinery,26) Installation Of New External Window Sills And Interior,27) Installation Of New Plasters, Painting Walls, Ceramic Cladding,28) Installation Of New Floor Finishes,29) Installation Of A New Roof Covering With Laying New Roof Tiles, Replacement Of Gutters And Downspouts,30) Implementation Of Vertical Insulation Of Basement Walls,31) Implementation Horizontal Insulation Of External Walls,32) Insulating The Walls Of The Building Along With Finishing With Plaster And Façade Coating, And Restoring The Plinth While Maintaining The Current Color Scheme,33) Insulating The Ceiling Of The Top Floor,34) Possible Underlining Of Basement Walls And Other Works Subject To The Reconstruction Of The Building,35 ) Foundation Of The Gazebo,36) Disassembly Of All Sanitary Installations In The Building Along With Radiators,37) Cutting Off The Gas Supply To The Building,38) Moving The Water Meter To The Heat Distribution Center Room Along With The Construction Of A Fragment Of The Water Supply Connection On The Investors Plot,39) Construction Of A New Central Heating Installation Including The Installation Of A New Compact Heating Station,40) Construction Of A New Cold And Hot Water Installation Together With The Installation Of A New, More Efficient Water Heater (Electric Heater),41) Construction Of A New Sanitary Sewage System With Risers And Levels,42) Installation Of The Necessary Sanitary Equipment, 43) Installation Of Bathroom Fans,44) Installation Of Wall Intakes, Air Vents, Etc.,45) Dismantling Of All Internal Installations,46) Construction Of A New Rg Switchgear And New Floor Switchboards,47) Replacement Of Internal Power Supply Lines,48) Construction Of New Equalizing And Grounding Connections, 49) Replacement Of Plug Sockets And Lighting, 50) Installation Of A Lightning Protection System With A New Earthing Electrode, 51) Installation Of A Fire Protection Switch. At The Main Entrance To The Building,52) Construction Of New Telecommunications Installations, Including Telephone And Computer Installations,53) Construction Of An Overvoltage Installation,54) Construction Of Area Lighting From The Buildings Facade,55) Construction Of Emergency And Evacuation Lighting,56) Construction Of Retaining Walls,57) Processing Roof Sheet Metal Work,58) Construction Of A Working Platform,59) Construction Of Retaining Walls3. Construction Works Related To The Implementation Of The Order In Question Will Be Performed On The Basis Of Building Permit No. I/777/20.4. A Detailed Description Of The Subject Of The Order In This Procedure Is Included In The Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), Bills Of Quantities, Swz, Contract Template And Annexes.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5a127158-f384-4eef-b7dd-2b55a12d81ef.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders