GTR 75457927

Tenders Are Invited For Construction Work - Expansion Of Dieskaustraße Ba24, To: Road, Track And Line Construction

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
75457927
Tendering Authority
Subscribe to view
Tender No
41463-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Expansion Of Dieskaustraße Ba24, To: Road, Track And Line Construction
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
19-02-2024 Closed
Work Detail
Construction Work - Expansion Of Dieskaustraße Ba24, To: Road, Track And Line Construction. Road Construction: Clearing 2,100 Bushes; Break Off 370 M Gas Pipe Dn 50-300; 550 M Pipeline Cancel Dn 100-150; Renovate 3 Old Tree Slices; Make 22 Tree Pits And Install Substrate; Loosen And Utilize 3,000 M³ Of Soil; Carry Out 1,000 M³ Of Soil Replacement; Collect And Utilize 5,200 M³ Layers Without Binders; 6,850 M² Asphalt 4-35 Cm Milling And Recycling; Break Up And Recycle 1,000 M² Of 10 Cm Concrete Paving; Accommodate 800 M Of Concrete Curbs; Accommodate 1,600 M Of Natural Stone Curbs; Take Up 100 M² Of Small Paving; Accommodate 3,000 M² Of Mosaic Paving; 200 M² Concrete Paving Surface To Record; Accommodate 1,400 M² Of Copper Slag Pavement; Take Up 300 M² Of Concrete Slabs; Take Up 600 M Of Paving Strips (Copper Slag); 2,774 M³ Frost Protection/Gravel Base Layer Produce; Create 4,200 M² Asphalt Base Layer 14 Cm Thick; 4,200 M² Asphalt Binder Course Make 8 Cm Thick; Produce 4,200 M² Of Stone Mastic Asphalt 4 Cm Thick; 900 M³ Lean Concrete Layer Install To Improve The Subsoil; Place 1,011 M Of Natural Curb; 1,200 M Of Natural Curb Set, Material Of The Ag; Place 650 M Of Concrete Curb; 2,270 M Row Of Paving Stones Made Of Large Concrete Paving Stones Make 1 Row; Create 390 M Paving Rows Of Copper Slag Paving In 1 Row, Mat. Of The Ag; Create 3,150 M² Of Concrete Paving; 180 M² Guide/Companion Panels For The Blind Embarrassed; Lay 150 M² Of Air Chamber Panels; Produce 1,500 M² Of Mosaic Paving Mat. Of The Ag; Produce 320 M² Of Natural Stone Paving Surface; 450 M² Copper Slag Paving Ceiling Produce, Material Of The Ag; 55 St Road Drains Expand; 83 St Street Gullies Incl. Produce Connecting Cables; Marking And Signage Work; 1,680 M³ Pipe Trenches/Pits And Partly Cable Protection For Utility Companies; 1,000 M Of Cable Trenches For Street Lighting Including Cable Protection; Produce 28 Lighting Points Including Electrical Assembly Work; Set 9 Lighting Poles Including Electrical Assembly Work; 270 M Cable Trench / -Pe-Hd Protective Tube; 27 Pcs Compact Cable Ducts; 8 Pieces Make Temporary Light Points And Dismantle; 1,310 M Lsa Cable Protection Pipe Including Cable Trench; 15,000 M² Area Exploration Carry Out Ordnance; 2 Pcs. Produce Signposting Including Execution Documents And Statics; Install 36 Bicycle Support Bars; Working On 3 Hand Pumps Pipeline And Civil Engineering Aw + Tw: Implementation Of Wastewater Control / Interim Drainage For Pump Delivery Rates Up To 100 M3/H (Pump System, Pressure Lines, Temporary Barriers Daily Construction And Dismantling Of Temporary Sewer Connections); 3,250 M² Departure Unbound Base Layer For Main And Connecting Lines For Open Renovation; 3,250 M² Create Unbound Base Layer; 5,000 M³ Of Pipe And Construction Pit Excavation Including. Installation Work For Main And Connecting Lines For Open Renovation Mixing And Replacement Drinking Water Pipes, Depth Up To 5.00 M (Excavation, Disposal, Delivery And Installation Of Replacement Floor); 600 M Dismantling Of Mixed Water Pipe Up To Dn 600 Including Dismantling Of 21 Shafts (19 X Dn 1000, 1 X Dn 1200, 1 X Dn 1500); 300 M Damming Mixed Water Pipe Up To Dn 300 Including Partial Dismantling Of 7 Shafts; 225 M New Installation Of Mixed Water Pipe Dn 300 Grp Including Fittings; 130 M New Installation Of Mixed Water Pipe Dn/Od 400 Pp Incl. Fittings; 250 M New Installation Of Mixed Water Pipe Dn 400 Grp Including Fittings; 120 M New Installation Of Mixed Water Pipe Dn 500 Grp Including Fittings; 13 M New Installation Mixed Water Pipe Dn 600 Grp Including Fittings; 545 M Replacement Connecting Cable Up To Dn 200 (Stz, Pp) Including Fittings And Dismantling Of Existing Connection Pipe; 5 Pieces Of New Shaft Dn 1000 Made Of Reinforced Concrete, Depth Up To 3.50 M; 22 Hours Of New Shaft Construction Dn 1000 Made Of Grp, Depth 1.25 M - 4.50 M; 2 Pieces Of New Shaft Dn 1200 Made Of Grp, Depth Around 4.50 M; 1 Piece Of New Shaft Dn 1500 Made Of Grp, Depth Approx. 2.75 M; 5 Hours Of Renovation Mixed Water Pipe Dn 300 Using A Longliner Including Preparatory/Milling Work; 11 Pieces Of Renovation Connection Line Up To Dn 200 Using A Hose Liner Including Preparatory/Milling Work; 11 Pieces Renovation Of Connection Pipe Up To Dn 200 Using Short Liner Including Preparatory/Milling Work; 655 M Dismantling Of Drinking Water Pipes Up To Dn 300 Gg And Pe Da 63 (House Connection Pipes), Including 89 Fittings (Hydrant, Slide Valve, Valve Tapping Fitting); 945 M Dam Of Drinking Water Pipe Up To Dn 300 Including Partial Dismantling Of Fittings; 1,370 M Of New Drinking Water Pipeline Installation Dn 100 Ggg, Pe-Ha Da 110, Pe-Hd Da 125, Pe Da 160, Pe Da 180 And Pe-Ha Da 225 (Partly In The Protective Pipe) Including Fittings And Fittings (12 X Hydrant, 27 X Slide, 1 X Ventilation Valve); 320 M Tw Temporary Solution Up To Pe-Ha Da 110; 46 Hours Takeover Drinking Water House Connection Pipe, Including Fittings, Valve Tapping Fitting And Some. Laying In A Protective Tube Track Construction: 300 Msch Remove And Recycle Grooved Rails; Remove And Recycle 120 Pieces Of Large Composite Panels; 1,600 M² Of Asphalt Paving Collect And Recycle Concrete; Remove And Recycle 14 Drainage Boxes; 1,800 M³ Of Base Layers Without Binders; Hold 1,300 M³ Of Soil; 800 M Drainage Pipe Produce; Install 52 Pieces Of Rail Drainage Boxes; 6 Pcs Track Drainage Boxes Produce; Produce 4,200 M² Of Fine Subgrade; Create 800 M³ Frost Protection Layers; 1000 M³ Lean Concrete Layer To Improve The Subsurface; Create 4,200 M² Of Concrete Base Layer; Produce 4,200 M² Of Asphalt Base Courses; Produce 4,200 M² Of Asphalt Binder Courses; Produce 4,200 M² Of Asphalt Surface Layers Of Mastic Asphalt; Produce 1,400 Mgl Rheda City-D Station Construction: Carry Out 20 M³ Floor Replacement; Create 200 M² Of Subgrade; 40 M³ Create Antifreeze Layers; Create 165 M Of Paving Strips; 165 M Studded Board Set; Stop Equipment And Lighting Catenary: Dismantle 16 Concrete Masts And Utilize; Dismantle And Recycle 30 Wall Mounts; 1,880 M Of Chainwork Dismantle And Recycle; Install 14 Masts; Install 55 Wall Anchors; 1,620 M Install The Chain Gear
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e78eea99-9e1c-4023-bac7-4bb414afd66e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders