GTR 75381767
Tenders Are Invited For Modernization Of The Water Treatment Plant In Stróża
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
75381767
Tendering Authority
Subscribe to view
Tender No
ZP.271.09.02.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Water Treatment Plant In Stróża
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
05-02-2024
Closed
Work Detail
1. The Subject Of The Order Is The Performance Of Construction Works Consisting In The Reconstruction And Modernization Of The Water Intake In Stróża At Ul. Tenisowa 1.2. The Construction Works That Are The Subject Of The Order Include In Particular: 1) Construction Of Borehole No. 2 (Emergency) To Capture Underground Water, Casing, Reinforcement Of The Well And Preparation Of Hydrogeological Resource Documentation For The Drilled Well No. 2, Preparation Of An Application And Obtaining An Environmental Decision For The Construction Of The Device Water For Well No. 2, Preparation Of A Water Law Report For The Construction Of A Water Facility And For The Intake And Use Of Water From Well No. 2, Physicochemical And Bacteriological Analysis Of Water Samples According To The Project, 2) Reconstruction And Modernization Of The Technological Building, 3) Construction, On The Foundation Reinforced Concrete, Two Insulated Clean Water Expansion Tanks, 4) Construction Of A Septic Tank For Sewage From The Chlorination Plant, 5) Construction Of A Water Treatment Installation Inside The Suw Building And Technological Installations Of Raw And Treated Water Outside The Building, 6) Construction Of A Second-Degree Pumping Station In The Technological Building , 7) Construction Of A Chlorination Installation, 8) Installation Of A Ventilation Installation, 9) Construction Of A Control And Automation Installation And Monitoring Of A Water Intake, 10) Construction And Reconstruction Of A Network Of Internal And External Water Supply Installations, 11) Construction Of External Sewage Installations With A Sewage Connection, 12) Construction And Reconstruction Of Internal And External Power Installations With A Power Generator And Automatic Switching Of The Reserve (Szr), 13) Construction Of Hardening Of The Area - Access Roads And Roads, Development Of Greenery Around The Station Square And Construction Of A Fence With A Wicket And Entrance Gate, 14) Modernization Of The Existing Well S1,3. The Investment Will Be Implemented In Stróża, Plot No. 266, Precinct 0008 Stróża, 4. A Detailed Description Of The Subject Of The Order, The Scope Of Works As Well As The Technology Of The Works And The Technical Specification For The Execution And Acceptance Of Construction Works Are Specified In Annexes No. 11 To No. 14 Inclusive:1) Annex No. 11 - Design Documentation2) Annex No. 12 - Geological Documentation3) Annex No. 13 - Stwior4) Annex No. 14 - Bills Of Quantities5. The Bills Of Quantities Attached To The Swz Are Secondary To The Design Documentation, They Contain A List Of Expected Works In Order To Illustrate The Scale Of Construction And Help Contractors Estimate The Costs Of Implementing The Investment. The Bill Of Quantities Has An Auxiliary Function.6. The Ordering Party Requires That In Order To Ensure Adequate Durability Of Elements Made Of Acid-Resistant Steel, Their Surfaces Must Be Etched And Then Passivated. Due To The Fact That The Water Treatment Plant Is Located In The Direct Sanitary Protection Zone And There Is A High Risk Of Contamination During Pickling And Passivation Operations, These Operations Are Not Allowed On The Premises Of The Water Treatment Plant.7. The Ordering Party Requires That The Continuity Of Drinking Water Supply To Recipients Be Ensured During The Implementation Of The Investment. The Work Should Be Carried Out In A Way That Allows The Existing Treatment Facilities To Be Kept In Operation. 8. Before Starting The Expansion Of The Water Treatment Plant, The Contractor Will Be Obliged To Prepare A Work Schedule So That There Is No Interruption In The Water Supply. If The Circumstances Of The Works Performed Result In The Necessity Of Interruption Of Supply, This Fact Should Be Agreed With The Ordering Party And With The Municipal Utilities Plant In Andrespol.9. The Scope Of The Subject Of The Order Also Includes: 1) Full Surveying Services During The Implementation Of The Subject Of The Order, However, Apart From The Subject Of The Order, Inventory Measurements Should Also Cover Other Utility Networks Located In The Open Pit And Inconsistent With The Location Shown On The Basic Maps; 2) Presentation For Review Bioz Health And Safety Plan To The Ordering Party, In Order To Ensure Appropriate Occupational Health And Safety Conditions And Environmental Protection At The Work Site And Its Surroundings;3) Obtaining All Relevant Decisions, Expert Opinions, Tests And Opinions, Together With The Costs Of Obtaining And Implementing Them;4) Incurring All Costs Related To Carrying Out Construction Works, In Particular Fees For Water Consumption, Electricity And Fees For Geodetic Measurements; 5) Proper Organization And Security Of The Construction Site; 6) Tidying Up The Area After Construction And Any Other Works Not Expressly Indicated In The Swz, And Necessary To Be Carried Out In Accordance With The Art Of Construction;7) Marking Of The Work Area (Ensuring Constant Conditions Of Visibility During The Day And At Night Of Those Marking Elements That Are Necessary For Safety Reasons), Until The Works Are Completed And Accepted, Carrying Out Them In Compliance With The Requirements Of Occupational Health And Safety And Fire Protection Regulations And In A Manner That Ensures Safety;8) Carrying Out The Works In Accordance With Relevant Standards, Legal Acts, Regulations And Instructions, Using All Available Construction And Technical Knowledge And Skills To Ensure The Correct And Timely Performance Of Construction Works.10. While Performing The Works, The Contractor Should Act With Respect For Public And Private Property, Take Care Of Environmental Protection And Comply With Applicable Legal Regulations.11. To Perform The Subject Of The Order, Construction Products Should Be Used, Legally Approved For General Use In Construction, Marked With The Ce Mark Or Construction Mark, Or Included In The List Of Products Of Minor Importance For Health And Safety, In Accordance With The Construction Products Act.12. The Ordering Party Reserves That Wherever In The Description Of The Subject Of The Order, The Bill Of Quantities, The Technical Specification For The Execution And Acceptance Of Construction Works Constituting The Description Of The Subject Of The Contract, Trademarks, Patents Or The Origin, Sources Or Detailed Processes That Characterize The Products Or Services Provided By A Specific Contractor, European Standards, Technical Assessments, Technical Specification Approvals, Technical Reference Systems Referred To In Article 101 Section 1 Point 2 And Section 3 Of The Act - The Ordering Party Allows Methods, Materials, Devices, Systems, Technologies, Etc. Equivalent To Those Presented In The Description Of The Subject Of The Order. Equivalent To Those Presented In The Description Of The Subject Of The Order Are Understood To Be Made By Any Manufacturers While Maintaining Identical Or Better Technical Parameters And Functional Values And Fully Compatible With The Rest Of The Devices, Provided That They Meet The Same Technical Properties As Those Proposed By The Ordering Party.13. The Parameters Of The Indicated Standard Define The Minimum Technical, Operational, Utility, Quality And Functional Conditions That The Subject Of The Order Is To Meet. The Indicated Trademarks, Patents, Brands Or Manufacturers Names Or Sources Or Specific Processes Indicating Origin Only Determine The Class Of The Product, Method, Materials, Devices, Systems, Technologies, Etc.14. The Offer May Include Methods, Materials, Devices, Systems, Technologies, Etc. From Other Brands And Manufacturers, But With Technical, Quality Parameters And Performance And Functional Properties Corresponding To The Methods, Materials, Devices, Systems, Technologies, Etc. Described In The Swz. Additionally, The Ordering Party Emphasizes That Equivalent Methods, Materials, Devices, Systems, Technologies, Etc. Cannot Be Substitutes For The Methods, Materials, Devices, Systems, Technologies, Etc. Described In The Description Of The Subject Of The Order Using Trademarks, Patents, Origin, Source Or Particular Process.15. A Contractor Who Offers Methods, Materials, Devices, Systems, Technologies, Etc. Equivalent To Those Presented In The Description Of The Subject Of The Contract Is Obliged To Demonstrate This Equivalence. Pursuant To Point 35 Of The Judgment Of The Court Of Justice Of The European Union Of 2018-07-12, C-14/17, For This Purpose It Is Required To Submit Appropriate Documents And Declarations Confirming The Offer, E.G. Catalog Cards/Technical Specifications/Descriptions, Etc.16. Task Co-Financed By The Task Co-Financed By The Polish Order Government Fund: Strategic Investment Program.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c8ba0daf-f762-46f2-9f17-ebd791047c81.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.