GTR 75094590
Tenders Are Invited For Superstructure Of The Municipal Building At Ul. Piastowska 15 In Zielonka
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
75094590
Tendering Authority
Subscribe to view
Tender No
WIZ.271.1.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Superstructure Of The Municipal Building At Ul. Piastowska 15 In Zielonka
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
26-01-2024
Closed
Work Detail
The Subject Is The Superstructure Of A Municipal Building Located At Ul. Piastowska 15, 05-220 Zielonka. The Scope Includes (Listing The Main Works In Technological Order Of Execution): − Renovation (Main Repair) Of The Ceiling Above The First Floor With The Ceiling Covered With E.G. Osb3 22Mm Board. − Securing The Ceiling Against Weather Conditions During The Works. − Securing The Building For Partial Demolition. Construction Of Scaffolding Surrounding The Building. − Installation Of Façade Protection Over The Existing Insulation, A Roof Made Of A Wooden Structure. − Demolition Of The Buildings Roof In The Reverse Order Of Construction. − Construction Of Scaffolding For Internal Walls And Chimneys. − Demolition Of External, Internal And Chimney Walls To The Level Of Placing The Tie Beams Above The First Floor. . Removal Of Construction Waste, Segregating It Appropriately And Removing It From The Construction Site. Then, The Waste Should Be Disposed Of In Accordance With The Current Regulations In Force During The Works. − Securing The Staircase. − Demolition Of The Ceiling And Staircase Walls To The Level Of The Ring Foundation In The Ceiling Level Above The First Floor. − Leveling The Surfaces Of Horizontal Walls And Chimneys With Mortar For Tie Beams. − Installation Of Rk Columns To Strengthen The Chimney Edges. − Reinforcement, Formwork And Concreting Of Ring Beams And Beams. , Stairs To The Landing Above The First Floor, Landing Above The First Floor, Reinforced Concrete Ceiling Above The First Floor And Balconies With Beams. − Bricklaying Of Walls And Chimneys On The Second Floor, Concreting Of Lintels, Stairs, Beam Under The Landing, Landing On The Mezzanine. − Installation Of Rk Columns On The Ring Beam. , At The Level Of The Second Floor, In Order To Strengthen The Chimney Edges. − Reinforcement, Formwork And Concreting Of Studs. − Reinforcement, Formwork And Concreting Of The Ring Beam Above The Second Floor, Stairs, Landing Beams, Landing And Reinforced Concrete Ceiling Above The Second Floor. − Installation Of Ceiling Beams Made Of I-Beams Steel. − Brickwork Of Knee Walls And Attic Staircase Walls. − Construction Of Brick Chimneys. − Reinforcement, Formwork And Concreting Of The Ring Crowning The Walls. Concreting Of Beams Located Above The Staircase. − Installation Of Brickwork On Previously Laid Insulation. − Installation Of Roof Trusses. − Installation Of Vapor-Permeable Foil, Counter Battens On The Sealing Tape On The Roof Rafters And Battens. − Installation Of Roof Covering With Roof Penetrations (Works). − Construction Of A Flue Gas Chimney Casing Structure Up To Rei60 Class, Along The Entire Height Of The Chimney, From The Ceramic Ceiling To The Roof Covering. Extension Of The Existing Chimney With A Double-Jacketed Stainless Steel Pipe With Insulation Between The Jackets. From The Covering, There Was A Transition To A Double-Walled Stainless Steel Chimney, Insulated, Finished With A System Chimney Cap. − Installation Of The Ceiling Above The First Floor, Wooden Beams, 15 Cm Soundproofing Wool Between The Ceiling Beams, 6X5 Cm Joists, Spaced 60-65 Cm With Leveling. − Installation Of Central Heating, Water And Sewage Pipes. − Protection Of The Wooden Ceiling From Above To Rei30, System Solution. − Installation Of The Ceiling Above The Second Floor, Wooden Beams. Ceiling Protection From Above, Up To Rei30, System Solution. Soundproofing The Ceiling. − Installation Of Steel Chimneys, Sheet Metal Chimneys, Spiro Pipes, Insulated To Cover The Roof With Wool Laggings And Aluminum Foil. Above The Roof, A System Solution With Turbovent Attachments, Made Of Stainless Steel, On A Double-Jacketed, Insulated Stainless Steel Pipe. − Installation Of Windows On The Facades. Installation Of External And Internal Window Sills. − Insulation Of Walls Using The Light-Wet Method. − Construction Of Installations And Rk Structures. − Construction Of Walls Separating The Premises And Partition Walls. Installation In The Walls. − Construction Of Plasterboard Ceilings Above The Second Floor. Installation Of Installations Above Ceilings. − Construction Of Fire Passages. Through Partitions. − Thermal Insulation Of The Roof. − Dry Construction Of The Attic And The Ceiling Above The Staircase. − Internal Plastering. Preparing Walls And Ceilings For Painting. Single Painting Of Walls And Ceilings White With Emulsion Paint. − Construction Of Floor Decks For Panels, E.G. From 5Mm Wood Fiber Boards. And Underlays, E.G. Made Of 8 Mm Thick Cement Boards For Tiles. − Floors Made Of Panels With A Minimum Thickness Of 8 Mm, Ac4, (Floating) And Stoneware Tiles With A Minimum Thickness Of 9 Mm, Anti-Slip Properties Of Min. R10, On Glue. Installation Of Liquid Foil Insulation In Bathrooms And Showers. Execution Of Tiles.− Execution Of Balcony Floors.− Installation Of Staircase Balustrades And Handrails As Well As Balcony Railings.− White Sanitary And Electrical Installation.− Installation Of Designed Doors.− Delivery And Assembly Of Premises Equipment Indicated In The Tables Of Integrated Elements.− Start-Up Of Devices, Adjustments And Checks.− Surface Hardening Of The Area Marked On The Development Design, I.E. Construction Of Sidewalks, Access To The Building, Access To Parking Spaces And Parking Spaces Themselves, Space Designated For Storing Solid Waste Containers, Made Of Gray Paving Stones, Rectangular, 6 Cm Thick In The Edges. − Reconstruction Of The Existing Sidewalk To The Exit To The Parking Lot For Residents Using The New Cube Indicated Above. − At The Entrance To The Building, A Galvanized, Serated Steel Doormat, 120X80, 20 Mm Thick, Must Be Installed. − Construction Of A Designed Fence Made Of 3D Panels With The Number Of 3 Embossments, Galvanized H = 1230 Mm, Minimum Rod Diameter 5 Mm, Mesh 50X200, Span Length 2.5 M .− Construction Of Panel Gates In The Fence From Galvanized 3D Panels With The Number Of 3 Embossments On Square Profiles. Filling Rod Diameter 5Mm, Mesh 50X200. The Height Of The Gate Is The Same As The Height Of The Fence. The Gate Is Equipped With A Lock And A Cylinder Insert. − Reclamation Of Greenery Located On The Plot With Sowing A Lawn On The Planted And Leveled Area. − Demolition Of The Construction Site, − Tidying Up The Area. The Detailed Scope Of The Order And Implementation Conditions Are Included In The Design Documentation Prepared By The Architekon Design Studio. Design Services Adam Śliwka Ul. Baśniowa 10, 07-200 Wyszków.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6ff97a45-cc30-4493-9909-1dc141032eed.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.