GTR 74963912

Tenders Are Invited For Reconstruction Of Some Rooms In The Boarding School Building, Including A Change Of Use To A Childrens Club And Development Of The Area Around The Building

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
74963912
Tendering Authority
Subscribe to view
Tender No
RIOSZP.271.1.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Some Rooms In The Boarding School Building, Including A Change Of Use To A Childrens Club And Development Of The Area Around The Building
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
25-01-2024 Closed
Work Detail
3.1. The Subject Of The Order Is The Reconstruction Of Some Rooms In The Dormitory Building And The Change Of Use To A Childrens Club. The Building Is Located In Kamieńsk, Commune. Kamieńsk, Plot No. 205/2, District 6. The Scope Of The Order Includes In Particular: 1) Dismantling Of Chutes To The Basement 2) Dismantling Of Window Joinery And Parts Of Door Joinery 3) Re-Forging Of Internal And External Walls For New Openings 4) Demolition Of Parts Of Partition Walls 5) Dismantling The Wainscoting On The Internal Walls6) Rebuilding The External Stairs7) Dismantling The Roof Over The Main Entrance8) Dismantling The Gutters9) Removing The Existing Tar Paper Roof Covering10) Separating The Main Entrance From The Rest Of The Building By Separating The Corridor Leading Further To The Connector11) Constructing A Ramp For Disabled People At The External Stairs And Inside The Building12) Reconstruction And Change Of Use Of The Rooms Located At The Connector Into Rooms For A Wheelchair, A Public Toilet, Including A Disabled Toilet, A Cleaning Room And A Cloakroom13) Reconstruction And Change Of Use Of The Dining Room And Kitchen Into Rooms For A Childrens Club And A Catering Kitchen With Kitchen Facilities, And Accompanying Rooms Such As A Waste Room, A Cleaning Room, A Toilet, A Social Room, A Staff Cloakroom, A Nurses Room And The Directors Office14) Construction Of A New Roof Covering From Polystyrene With Sheet Metal Flashing And New Gutters15) Replacement Of Window Frames, External And Internal Sills And Door Frames External And Internal16) Installation Of New Floors Made Of Ceramic Tiles And Floor Panels In The Rooms17) Thermal Modernization Of External Walls, Flat Roofs And Basement Ceilings18) Renovation Of The Walls At The Entrance To The Basement On The Northern Façade19) Construction Of A Light Polycarbonate Roof Over The Main Entrance To The Building20) Construction Of A Playground21 ) Replacement Of The Existing Pipes Of The External Heating System Led To The Dormitory Building From The Building Of The Secondary School Complex With Pre-Insulated Pipes22) Replacement Of Electrical And Sanitary Installations23) Replacement Of A Section Of The External Sewage System Running In The Ground To The First Manhole24) Marking Of Seven Existing Parking Spaces With Dimensions Of 2.5 M X 5, 0 M And One Space For Disabled People With Dimensions Of 3.6 M X 5 M On The Existing Hardening25) Purchase And Installation Of Equipment Indicated In The Equipment List. A Detailed Description Of The Subject Of The Order Is - Architectural And Construction Design With Land Development, Technical Design, Executive Design, Stwiorb Equipment List And Bills Of Quantities. Note: Due To The Adopted Nature Of The Contractors Remuneration (Lump Sum), The Bills Of Quantities Are For Information Purposes Only And Do Not Constitute The Basis For Calculating The Price By The Contractor.3.2. The Ordering Party Requires That Activities Related To The Performance Of Works In The Construction Industry, Sanitary Industry, Electrical Industry And Road Industry Be Performed By Persons Employed By The Contractor And Subcontractor On The Basis Of An Employment Relationship Within The Meaning Of Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (I.E.: Journal Of Laws Of 2023, Item 1465, As Amended). The Persons Mentioned In The First Sentence Cannot Perform Any Activities On The Construction Site Without Employment Under An Employment Relationship With The Contractor, Subcontractors Of Works Or Services. This Requirement Does Not Apply To Construction Managers, Work Managers, Suppliers Of Construction Materials, Surveyors, And Persons Providing Equipment And Transport Services, Unless These Activities Constitute An Employment Relationship Under The Provisions Of The Labor Code (E.G. Self-Employment). 3.3. The Ordering Party Informs That Where In The Tor The Subject Of The Contract Is Described By Indicating Trademarks, Patents Or Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor, It Allows Solutions Equivalent To Those Described, Provided That They Meet The Requirements Specified In Description Of The Subject Matter Of The Contract, Criteria Used To Assess Equivalence. For These Solutions, The Ordering Party Indicates As Equivalence Criteria The Allowance Of A Tolerance Of +/- 2% For All Parameters Required For Them. Where The Ordering Party Described The Subject Of The Order By Reference To Standards, European Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. . 101 Section 1 Point 2 And Section 3 Pzp, The Ordering Party Allows Solutions Equivalent To Those Described, And Such A Reference Is Accompanied By The Words Or Equivalent. The Ordering Party Indicates That The Obligation To Submit In The Offer Solutions Equivalent To Those Described In The Description Of The Subject Of The Contract And To Demonstrate Equivalence Lies With The Contractor. If The Requirements In The Description Of The Subject Of The Contract Refer To A Trademark, Patent Or Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor, The Ordering Party Requires That The Contractor, In The Event Of Offering Equivalent Solutions, Already Present Proof Of Equivalence In Its Offer. Confirming The Fulfillment Of The Criteria Specified In The Description Of The Subject Of The Contract, Which The Ordering Party Uses To Assess Equivalence (Cjeu Judgment C-14/17 Of 2018-07-12), E.G. Product Catalog Cards. If The Requirements In The Description Of The Subject Of The Contract Refer To European Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Pzp, The Ordering Party Requires The Contractor To Present Evidence Of Equivalence In Its Offer In The Manner Specified In Art. 101 Section 5 And 6 Pzp.3.4. Before Starting The Works, The Contractor Is Obliged To: • Mark The Construction Site (Information And Warning Boards), • Notify The Owners Of Neighboring Plots And Any Persons Staying On Neighboring Plots About The Works Being Carried Out, 3.5. Supplementary Works Required By The Ordering Party: 1) Performing Full Surveying Services For The Investment, 2) Preparing Acceptance Documentation In Two Copies In Polish, Divided Into Industries (Bound In Binders With A Detailed List Of Contents) Containing At Least: A) Permit For Use Or Application For Use To Pinb Accepted Without Objection, A) Original/Photocopy Of The Construction Log, B) As-Built Geodetic Maps With Stamps Confirming Contribution To The Geodetic Resource, C) Original Written Statement Of The Construction Manager: • On The Execution Of Works In Accordance With The Design Documentation, The Final Decision Of The Construction Permit And The Construction Law Act, • On The Execution Of Works In Accordance With Architectural Standards Constituting Part Of Annex No. 2 To The Guidelines On The Implementation Of Equality Principles Under Eu Funds For 2021-2027, • On Ensuring The Proper Condition And Order Of The Construction Site, As Well As Roads And Streets , Neighboring Properties, Buildings And/Or Premises, • Appropriate Development Of The Areas Adjacent To The Construction Site Enabling Proper Operation Of The Constructed Facility. D) A List Of The Built-In Materials Along With Documents Confirming Their Approval For Use In The Territory Of The Republic Of Poland, E) Original/Copy Of The As-Built Design Documentation - Signed By The Construction Manager/Works Managers, F) List Of Significant Changes (If Any) With A Graphic Attachment, Signed By The Construction Manager, Works Manager Appropriate To The Characteristics Of The Industry To Which The Change Applies, The Supervision Inspector, The Designer, Along With Documents Confirming Proper Legalization These Changes, G) Reports On Tests Performed During Construction Works, H) Building Fire Safety Instructions, I) Instructions For The Use And Operation Of The Facility Along With A List Of Built-In Devices That Require Service Inspections (The Ordering Party Requires A Tabular List Of Devices Requiring Service Inspections Along With An Indication Of The Dates Of These Inspections), J) All Operating Instructions And Operating Instructions For The Devices (In Polish), Along With Confirmation Of Training In The Operation Of These Devices, K) Electronic Version (In The Same Number As The Paper Version) Of Acceptance Documents And Documentation As-Built (Inventory In Pdf Format) On A Cd/Dvd Or Other Data Carrier.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2fe30978-3528-4cc0-9256-cf17e44ab2db.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders