GTR 74909697
Tenders Are Invited For Renovation Of The Gravel Road Towards The Descent To Beach No. 16
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
74909697
Tendering Authority
Subscribe to view
Tender No
RI.271.1.2024.MJ
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Gravel Road Towards The Descent To Beach No. 16
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
26-01-2024
Closed
Work Detail
1. The Subject Of The Order Is: Renovation Of The Gravel Road Leading To The Beach No. 16, The So-Called Titmouse. 2. The Works Should Be Performed Based On The Description Of The Subject Of The Order: A) The Total Length Of The Road Is Approx. 300 Meters, With A Variable Width Of 4-6 M B) The Works Should Be Carried Out On Plot No. 65/18 And 64/1 Rev. 2 Łeby, Only Within The Path Leading From Ul. Nadmorska To The Beach No. 16C), The Scope Of Work Includes: Selecting And Removing The Existing Surface (Be Careful With The Lighting Power Cables!), Preparing The Base - Crushed Stone With A Fraction Of 30-60 Mm, Profiling And, If Necessary, Compacting The Base, Laying Crushed Stone With A Fraction Of 4-30 Mm Mixed With Gravel And Its Compaction And Leveling; The Road Is To Be Limited By A Concrete Road Curb Along Its Entire Length On Both Sides; You Need To Connect At A Height To The Descent From The Street. Nadmorska And From The Side Of The Descent To The Beach; D) As Part Of The Task, Plantings Should Be Made Along The Road From The Wooded Area On Both Sides Of The Road - The Soil In The Place Where The Plant Was Planted Should Be Replaced, An Improver Should Be Added (Obtained From Spółka Wodna Łeba) Coniferous Shrubs Pinus Mugo Var. Pumilio / Mountain Pine – A Variety That Grows Max. Up To 80 Cm: Size Parameters - Trunk Circumference At A Height Of 1.30 M - C3, Size Parameters - Min. Trunk Height In Cm - 30-40 - Quantity 1000 Pcs. C) A Toilet Should Be Placed Next To The Road In A Place Agreed With The Ordering Party (Pattern, Model To Be Agreed With The Ordering Party), Which Must Meet The Following Requirements: - A Free-Standing Facility With An Area Of 18-20 M2 (But Not Larger Than 20 M2), Self-Supporting, Not Permanently Attached To The Ground, Placed On A Hardened Square Without Pouring Foundations (Square Made Of Gray Concrete Cubes Limited By A Concrete Curb - Execution Within The Scope Of This Task) With The Possibility Of Moving To Another Place (Exact Place Location Of The Facility To Be Agreed With The Ordering Party), - Toilet Rooms - 2 Cabins Equipped With: Toilet Bowl, Washbasin, Paper Holder, Waste Bin, Double Hanger Made Of Acid-Resistant Stainless Steel, - Internal Water And Sewage System, - Minimum Height Of The Rooms 2 ,5 M, - External Facade Resistant To Scratches, Scratches, Graffiti, Made Of Sandwich Panels (Colors To Be Agreed With The Ordering Party), - Interior Light Activated Automatically After Opening The Entrance Door In Each Cabin; - External Doors (2 Pcs.) Solid Steel With Size 90 Cm X 205 Cm; The Set Includes: Handle, Lock, Two Sets Of Keys, - Pvc Window (2 Pcs.) With Dimensions Of 60 X 50 Cm, Type R/U (Tilt And Turn), Placed In Toilet Rooms, - Cabin Partition Panels Supported On Supports Are Attached To Walls Using Aluminum Profiles, Boards Connected To Each Other At Right Angles Using Aluminum Profiles, All Stiffened With An Upper Stabilizing Profile, - Cabins Made Of Flame Retardant Materials In Flammability Class B1, - Knob On Both Sides Of The Door And A Lock With A Knob Equipped With A Closed Indicator / Open, The Lock Must Be Able To Be Opened In An Emergency, - The Toilet Is Connected To The Road Lighting Installation, - The Toilet Must Have A Drainless Tank For Waste And A Water Tank Enabling Filling (Water For Washing Hands And Flushing Waste In Toilets).3. The Description Of The Subject Of The Order And The Swz Cover The Entire Task. If Proper Names Appear In Any Item Of The Subject Of The Order, The Ordering Party Allows The Use Of Equivalent Solutions. The Ordering Party Allows Including In The Offer And Then Incorporating Equivalent Solutions Involving The Use Of Materials And Devices Other Than Those Specified In The Description Of The Subject Of The Order, Provided That All Parameters Are Not Worse Than Those Specified In This Description. In Such A Situation, The Ordering Party Requires, In Accordance With Art. 101 Section 5 Pzp, Submitting Appropriate Documents Confirming The Equivalence Of These Materials And Devices. All Provisions Of The Swz Should Be Considered Together. In A Situation Where The Requirements In The Swz Exceed The Requirements Contained In The Standards, The Provisions Contained In The Swz Apply. In Order To Prepare An Offer, The Contractor Should Prepare A Bill Of Quantities Based On The Description. Power Supply To The Area Where The Works Will Be Carried Out In Electricity And Water, As Well As Waste And Sewage Collection, The Contractor Will Be Obliged To Perform At His Own Expense And With His Own Efforts. If Using The Ordering Partys Connections, The Contractor Is Obliged To Install Its Own Meters At Each Water And Electricity Consumption Point Before Starting The Works, Document Their Readings And Submit Them To The Ordering Party. The Contractor Is Obliged To Secure Demolition Materials In Such A Way That They Can Be Reused. This Applies In Particular To Curbs, Road Blocks, Tiles And Road Markings. The Contractor Is Obliged To Report The Resulting Material, Taking Into Account Its Type And Quantity. Before Disposing Of Any Demolition Material, Please Ask The Ordering Party Whether It Is Needed For Reuse. The Contractor Will Provide Construction Services: A Construction Manager In The Road Industry. All Costs Related To Carrying Out The Works, Making Arrangements For The Duration Of The Works, Occupying The Area For The Duration Of The Works Is Covered By The Contractor.4. The Ordering Party Allows The Execution Of Part Of The Order To Be Entrusted To A Subcontractor. The Ordering Party Does Not Reserve The Obligation For The Contractor To Perform Key Tasks.5. The Ordering Party Requests That The Contractor Indicate In The Offer The Parts Of The Order Whose Performance Will Be Entrusted To Subcontractors, And Provide The Names Of Any Subcontractors, If They Are Already Known.6. The Ordering Party Requires The Contractor Or Subcontractor To Employ Persons Under An Employment Contract To Perform The Activities Indicated Below During The Execution Of The Order:• Preparatory Works, Including Demolition;• Surface Works Related To Laying The Surface;• Finishing Works7. During The Execution Of The Order, The Ordering Party Is Entitled To Carry Out Inspection Activities Towards The Contractor Regarding The Contractors Or Subcontractors Compliance With The Requirement Of Employing Persons Performing The Activities Indicated In Point 6 Under An Employment Contract. The Ordering Party Is Entitled In Particular To: A) Request Declarations And Documents Confirming Compliance With The Above-Mentioned Requirements. Requirements And Their Assessment, B) Request Explanations In Case Of Doubts Regarding Confirmation Of Compliance With The Above-Mentioned Requirements. Requirements, C) Carrying Out On-Site Inspections.8. During The Execution Of The Order, At Each Request Of The Ordering Party And Within The Time Specified In The Request, The Contractor Will Submit To The Ordering Party The Evidence Indicated Below In Order To Confirm The Fulfillment Of The Requirement Of Employment Under The Employment Contract By The Contractor Or Subcontractor Of Persons Performing The Activities Indicated In Point 6 During The Execution Of The Order: • Declaration Of The Contractor Or Subcontractor On The Employment Under An Employment Contract Of Persons Performing The Activities Referred To In The Ordering Partys Request. This Declaration Should Include In Particular: Precise Identification Of The Entity Submitting The Declaration, Date Of Submission Of The Declaration, Indication That The Activities Covered By The Request Are Performed By Persons Employed Under An Employment Contract, Together With An Indication Of The Number Of These Persons, Their Names And Surnames, The Type Of Employment Contract And The Salary. Full-Time Position And The Signature Of The Person Authorized To Submit A Declaration On Behalf Of The Contractor Or Subcontractor; • A Copy Of The Employment Contract/Contracts Of Persons Performing The Activities Referred To Above During The Execution Of The Order, Certified By The Contractor Or Subcontractor, Respectively. Declaration Of The Contractor Or Subcontractor (Together With A Document Regulating The Scope Of Obligations, If Prepared). A Copy Of The Contract(S) Should Be Anonymized In A Way That Ensures The Protection Of Employees Personal Data, In Accordance With The Provisions Of The Act Of May 10, 2018 On The Protection Of Personal Data (Journal Of Laws Of 2018, Item 1000) (I.E. In Particular Without Addresses, Employees Pesel Numbers). The Employees Name And Surname Are Not Anonymized. Information Such As: Date Of Conclusion Of The Contract, Type Of Employment Contract And Working Hours Should Be Identifiable;• A Certificate From The Relevant Zus Branch Confirming The Payment Of Social Security And Health Insurance Contributions By The Contractor Or Subcontractor For Employment Under Employment Contracts For The Last Period Settlement Document;• A Copy Of The Proof Of Registration Of The Employee By The Employer For Insurance, Certified As A True Copy By The Contractor Or Subcontractor, Respectively, Anonymized In A Way That Ensures The Protection Of Employees Personal Data, In Accordance With The Provisions Of The Act Of May 10, 2018 On The Protection Of Personal Data (Journal Of Laws Laws Of 2018, Item 1000). The Employees Name And Surname Are Not Subject To Anonymization.9. In Case Of Failure By The Contractor Or Subcontractor To Employ Persons Performing The Activities Specified In Point 6 Under The Employment Contract, The Contracting Authority Provides For A Sanction In The Form Of The Contractors Obligation To Pay A Contractual Penalty In The Amount Specified In The Relevant Provisions Of The Public Procurement Contract. Failure By The Contractor To Submit, Within The Deadline Set By The Ordering Party, The Evidence Requested By The Ordering Party To Confirm That The Contractor Or Subcontractor Has Met The Employment Requirement Under The Employment Contract Will Be Treated As The Contractors Or Subcontractors Failure To Meet The Requirement To Employ Persons Performing The Activities Specified In Point 6 Under The Employment Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1a6139db-fbe7-4afc-850f-df8978ad1146.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.