GTR 74909673

Tenders Are Invited For Revitalization Of The Historic Town Hall In Rawicz - Sarnów - Stage 1

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
74909673
Tendering Authority
Subscribe to view
Tender No
ON.2710.14.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Revitalization Of The Historic Town Hall In Rawicz - Sarnów - Stage 1
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
25-01-2024 Closed
Work Detail
1. The Subject Of The Order Are Construction Works Consisting In The Revitalization Of The Historic Town Hall In Rawicz - Sarnów - Stage 1. The Task Should Be Performed In Accordance With The Assumptions And Guidelines Included In The Design Documentation (Implementation Of Stage 1), Carried Out As Part Of The Task Specified In The Budget Resolution Entitled: Revitalization Of The Historic Town Hall In Rawicz - Sarnów In Accordance With The Scope And Provisions Resulting From This Swz Together With The Annexes.2. The Scope Of Works During The Execution Of The Order Under Stage 1 Includes The Performance Of All Construction Works In Accordance With Applicable Regulations, Including Works Consisting In Renovating The Interior And Facade Of The Town Hall Tower, Renovating The Facade Of The Town Hall, Replacing Window And Door Joinery, Performing The Necessary Electrical Works In The Facility And The Strips Around It. Building And Replacing Gutters And Downpipes, In Particular: 1) Construction Industry: A) Ground Floor: Forging Sockets For Steel Beams And Placing Steel Beams Together With Processing, Piercing Ventilation Holes And Installing Ventilation Along With Processing, B) Attic: Installation Of Roof Windows Including Roofing Treatments And Additions, C) Renovation Of The Tower: Works On Wooden Platforms, Fungus Removal, Replacement, Impregnation, Painting Of The Floor, Changing The Location Of The Clock Mechanism From The Wooden Platform To The Ceiling Level Above The First Floor, D) Renovation Of The Tower: Works On Walls, Plastering, Manual Rendering, Manual Plastering With Renovation Plasters, Priming Surfaces, Two-Time Painting With Silicate Paints, E) Replacement Of Window And Door Frames, Carving Out Door Frames, Carving Out Internal And External Window Sills, Removal And Disposal Of Rubble, Installation Of Wooden And Composite Windows, Double-Glazed Installation Of Ei60 Aluminum Doors, Installation Of Powder-Coated Wooden Panel Doors With A Frame (Windows And Doors Should Be Made In Accordance With The Guidelines Of The Conservator Of Monuments And The Technical Design), Installation Of Wooden Window Sills, Titanium-Zinc Sheet Metal Flashings, F) Construction Of The Band Around The Building: Dismantling Sidewalks, Islands And Pedestrian Crossings, Excavations In Vertical Walls When Uncovering Foundation Walls, Earthworks Including Transport Of Excavated Material, Soil Storage, Profiling And Mechanical Compaction, Construction Of A Concrete Footing For A Concrete Rim, Concrete Rim, Laying Of Road Channel Sewage, Construction Of A Gravel Band Around Building With A Substructure Made Of Stone Aggregate, G) Replacement Of Gutters And Downpipes: Demolition Of Gutters, Demolition Of Firewalls, Eaves, Collars, Cornices, Etc. - Strip Under/Above The Gutter, Dismantling Of The Double-Laid Flat Tile Roof - Along The Eaves For Replacement Sheet Metal Flashings And Roofing Felt Gutters, Replacement Of Fascia Boards, Titanium-Zinc Sheet Metal Flashings, Reconstruction Of The Roof Covering With Double Cement Plain Tiles, Installation Of Roof Gutters Made Of Titanium-Zinc Sheet, Gutter Tanks, Downspouts Made Of Titanium-Zinc Sheet, H) Purchase And Installation Of Double Nesting Boxes For Sparrows,I) Construction Of A Single-Slope Roof Over The Entrance Made Of Tempered Glass With An Aluminum Structure,J) Renovation Of The External Facade: Plastered Facade, Erection Of Scaffolding, Demolition Of Fire Walls, Eaves, Collars, Cornices, Etc. - Cornice Processing, Flashings Made Of Titanium-Zinc Sheet Metal, K) Installation Of Horizontal Moisture-Proof Insulation - Polymer-Cement Injection (Execution Method In Accordance With The Technical Documentation), L) Plastered Facade: Supplementation Of Category Iii External Plasters With Lime Or Cement-Lime Mortar, Local Supplementation Of Rotten Plasters - Execution Renovation Plasters,M) Renovation Of The Entrance Portal In Accordance With The Design Documentation And The Recommendations Of The Conservator,N) Renovation Of The Attic Wall Above The Entrance Portal In Accordance With The Recommendations Of The Conservator,O) Reflection Of Internal Plasters On Walls, Pillars, Pilasters Made Of Cement And Lime Mortar, Local Additions Plastering Of Jambs, Beams, Pillars, Pilasters,P) Execution Of Ordinary Category Iii External Plasters Made Of Cement-Lime Mortar On Jambs, Beams, Pillars And Pilasters, Along With Local Replenishment Of Rotten Plasters - Execution Of Renovation Plasters,Q) Priming Of Vertical Surfaces, Painting Of Facades Double Silicate Paint,R) Installation Of Frame Facade Scaffolding,S) Removal Of Rubble From The Building, Removal And Disposal,T) Tower: Construction Of A Systemic Spatial Scaffolding For The Town Hall Tower With Possible Demolition Of The Roof Covering For The Duration Of The Works,U) Tower: Preparation Of The Old Substrates For Insulation Using The Light-Wet Method By Mechanical Cleaning And Washing, Cleaning The Brick Bond Of The Brick Tower Using The Thermocouple Technology With Detergent Or Locally With A Paste With Acidic Ammonium Fluoride, In Accordance With Conservation Guidelines, V) Repair Of Damaged Bricks From The Surface Of Historic Walls 1 Brick, 2- 3 Bricks - Filling Brick Defects According To The Pattern And Type Of Existing Brick,W) Pointing Of Walls With Architectural Decorations Made Of Gothic Brick - Filling The Missing Joint,X) Hydrofibization By Hand Painting With A Hydrophobic Preparation Of Mineral Substrates Of Brick Surfaces During The Renovation Of Old Buildings,Y) Renovation Of Steel Existing Elements Of The Tower In Accordance With The Recommendations Of The Conservator Of Monuments: E.G. Clock Face, Helms, Spiers, Etc. Recommendations Of The Conservator Of Monuments, Bb) Other Works Accompanying The Proper Execution Of The Order. 2) Electrical Industry: A) Cable Routes: Electrical Installation Pipe, Cutting Grooves For Wires And Cables Of The Electrical Installation Together With Their Mortaring With Cement And Lime Mortar, Sealing Culverts And Penetrations Through The Walls Fire Protection Mass With Marking, System Bushings, B) Power Wires And Cables: Installation Of Cables Laid In Grooves, Laying Of Power Cables, C) Installation Of An Rg Electrical Switchgear With A Complete Set Of Equipment And Internal Cabling, Flush-Mounted Installation, D) Installation Of The Town Hall Board Tr With A Set Of Equipment And Internal Cabling, Flush Mounting, Installation Of A Zp Measuring Connector With A Set Of Equipment And Internal Cabling, Floor-Standing Switchgear, E) Analysis Of Network Parameters, F) Installation Of Current Transformers, G) Installation Of Lighting Fixtures In Accordance With The Design H) Assembly Emergency Luminaires In Accordance With The Design, I) Installation Of Evacuation Luminaires In Accordance With The Design, J) Electrical Installation Equipment: Preparation Of The Surface For Installation Equipment, Installation Of A Motion And Presence Sensor - In Accordance With The Description And Arrangements With The Ordering Party, Installation Of Plug Sockets And Flush-Mounted Boxes - In Accordance With The Description And Arrangements With The Ordering Party, K) Fire Protection Circuit Breaker: Preparatory Works, Installation Of Devices And Cables, L) Lightning Protection And Earthing Installation: Installation Of Earthing Electrodes Or Grounding Cables - Hoop Iron, Installation Of Lightning Protection System Cables, Distance Brackets, Discharge Cables, Cross Clamps, Control Connectors In The Lightning Protection System - Installation On The Facade, Flexible Connection Elements, Tests And Measurements, Anti-Corrosion Protection, Along With Accompanying Works, M) External Electrical Installations: Construction Of The Main Power Line (Sealed Culvert, Digging Trenches For Cables, Filling A Layer Of Sand, Laying The Pipe Rigid Casing, Installation Of Spigot Glands, Laying Cables, Backfilling Ditches),N) Illumination Lighting Installation: Installation Of Lighting Fixtures On The Walls Of The Building In Accordance With The Design Along With The Light Source And Mounting Materials,O) Emergency Evacuation Lighting Monitoring System (Emergency Lighting Monitoring Control Unit – Parameters In Accordance With The Design, Signal Splitter, Cable Lines),P) Dismantling Works,Q) Electrical Measurements Along With Preparation Of Protocols,R) Training, Commissioning, Instructions, As-Built Documentation,S) Grooving For Cables In The Walls And Grouting The Grooves After Making Works And Restoring The Surface To Its Original Condition,T) Elements Not Included But Necessary For The Complete Implementation Of The Scope Of Works - Other Works Accompanying The Proper Execution Of The Order.3) All Other Accompanying Works Necessary For The Proper Execution Of The Order.4. It Is Recommended That The Contractor, Before Preparing The Offer, Makes A Site Visit To Familiarize Himself With The Facility And Obtain, At His Own Responsibility And Risk, Any Additional Information That May Be Necessary To Prepare The Offer, Sign The Contract And Perform The Order. The Date Of The On-Site Visit Should Be Arranged By Phone With The Person Supervising The Investment - Mr. Michał Handke. The Cost Of The On-Site Visit Is Borne By The Contractor.5. Note: Lump Sum Settlement Of The Investment. The Scope Of Work To Be Performed Under This Order (Stage 1) Is Specified In The Attached Bills Of Quantities Together With Zero Cost Estimates. Bills Of Quantities / Zero Cost Estimates Are Indicative - They Are Only Supporting Documents For Determining The Offer Price. The Contractor Will Assess The Final Scope Himself Based On The Design Documentation And The Recommended Field Visit.6. A Detailed Description Of The Subject Of The Contract Is Included In Chapter Iii Of The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e15b7514-dbbf-4c32-b590-5c91e95b6ec9.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders