GTR 74849112

Tenders Are Invited For Load-Bearing Structure Design Services - Planning Service For Structural Planning For The Construction Of An Ogs Extension And The Renovation Of Parts Of The Old Building Of The Theodor Heuss School

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
74849112
Tendering Authority
Subscribe to view
Tender No
10726-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Load-Bearing Structure Design Services - Planning Service For Structural Planning For The Construction Of An Ogs Extension And The Renovation Of Parts Of The Old Building Of The Theodor Heuss School
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
15-01-2024 Closed
Work Detail
Load-Bearing Structure Design Services - Planning Service For Structural Planning For The Construction Of An Ogs Extension And The Renovation Of Parts Of The Old Building Of The Theodor Heuss School. New Ogs Building As An Extension To The Administration Wing. The Premises Of The Open All-Day Care Are Currently Located On The Upper Floor Of The Administration Wing Of The Theodor Heuss School (Tract A). As Part Of The Construction Project Described Here, The Kitchen And Dining Room Situation Must Be Taken Into Account The Ogs Has Been Optimized With Regard To The Increasing Number Of Participants In Lunch Catering And More Care Space Can Be Generated. As Part Of A Feasibility Study In In 2021, The Possibility Of Adding A Cafeteria Including A Connecting One Became Possible Person Extract Examined In The Administrative Wing. The Planned Extension With A Net Floor Area The New Cafeteria, Measuring Approximately 240 Square Meters, Contains A Kitchen, A Laundry Room And A Disabled Toilet As Well As An Elevator With Connection To The Ground And Upper Floors Of The Administration Wing. The Kitchen Must Be Equipped According To The Latest Specifications For Open All-Day Schools. The The Cafeteria Area Must Be Divisible Into Smaller Units And Equipped In Such A Way That: Can Be Used Multifunctionally For Care, As A Cafeteria And As An Event Room Can. The Floor Plan And Furnishings Are Particularly Noise-Intensive Use By Large Groups Should Be Planned Taking Into Account The Best Possible Acoustics. The Developed Concept Of The Feasibility Study For The New Building Is Included In The Tender Documents At (Appendix 03). Draft Planning For The Further Construction Phases Next Are The Service Phases 1 To 3 For The Further Construction Phases Iii. And Iv. Renovation And Conversion Of The Sports Hall And Adjacent Rooms, Renovation Of The Toilet Wing (3Rd Floor). Construction Phase) In The Rear Wing Of The Building (Tract D) There Are On The Ground Floor To The East Of The Stairwell The Changing Rooms And Behind Them The Gymnasium Extension. Upstairs Are Two Rooms That Are Used Multifunctionally For Teaching, Supervision, Etc. All Rooms Must Be In Terms Of Pollutants, Fire Protection And Technical Building Equipment Needs To Be Comprehensively Renovated. In Addition, The Cloakrooms Must Be Included The Sanitary Facilities Will Be Re-Divided And Completely Re-Equipped. In The Stairwell A Cleaning Supplies Room With A Washbasin Must Be Separated. The Gym Already Has One Got A New Hall Floor And New Windows With The Possibility Of Cross Ventilation. As Part Of The Holistic Renovation, The Old Heating System And Ventilation Must Be Dismantled Become. It Will Be Replaced By Ceiling Heating. The Existing Ceiling Must Be Complete Canceled And Including Lighting And Other Technical Equipment Be Replaced With The Current Specifications. A Static Check Must Be Carried Out Beforehand, Whether The Old Roof Construction Is Sufficient Or Upgraded For The New Functions Must Become. The Renovation Of The Toilet Facilities Was Several Years Ago. In Addition, Were Issues Such As Fire Protection And Pollutants Are Not Sufficiently Taken Into Account, So That A Another Renovation Is Planned As Part Of A Holistic Approach. Renovation And Conversion Of The Administration Wing, The Auditorium And The Entrance Area (4Th Construction Phase) In The Next Construction Phase, The Administration Wing (Tract A) Will Be Examined. Because Of Due To The Diverse Uses, It Must Be Divided Into Two Construction Phases. The School Administration Is Located On The Ground Floor, East Of The Stairwell. This Currently Houses The Teachers Room, A Tea Kitchen, The Headmasters Office And The Secretary. There Is Also The Caretakers Apartment On The Ground Floor, However, For The Time Being, They Are Not Added To The Schools Premises And Therefore Also Is Not Renovated. The Renovation Measures On The Ground Floor Primarily Include: The Remediation Of Pollutants, Measures To Improve Building Physics And Adaptation The Technical Building Equipment To The Current Specifications. In Addition, It Must Be Manufactured To Ensure Accessibility, A Lift Should Be Installed In The Hallway As There Are Three Steps To Overcome Have To Be Taken In Order To Get Into The Administration. The Existing Open All-Day Care The Upper Floor Of The Administration Wing Needs To Be Completely Restructured As Part Of The Renovation. The Kitchen And Dining Rooms Are No Longer Needed Here Due To The New Cafeteria Extension And Are To Be Converted Into Offices And Meeting Rooms. The First Step Is To Clean Up Pollutants The Rooms Must Then Be Reorganized And Brought Up To Date Technology And Fire Protection. Together With A Specialist Planner In Terms Of Building Physics, The Building Must Be Checked For Weak Points On The Facade That Could Cause Mold Be Examined And Remedied Accordingly. This Part Of The Building Must Also Be Done The Clinker Brick Facade Will Be Renovated And The Windows In The Southeast With Vertical Awnings Be Equipped As Sun Protection. The School Auditorium Is Still In The Construction Phase Condition And Therefore Requires Comprehensive Renovation In Terms Of Fire Protection, Building Physics, Acoustics And Technical Building Equipment. Through The Floor-To-Ceiling Glass Facade Direction Southwest And An Outdated Heating System It Doesnt Get Warm Here In Winter. A Presentation Technique Is Not Yet In Place, The Lighting Needs To Be Replaced And The Acoustics Checked Become. The Appearance Of The Original Ribbed Ceiling Must Be Preserved. Installations Must Be Introduced As Gently As Possible. The Ceiling Will Be In The Upcoming Construction Phase With A Fire Protection Coating To Prevent Flashover. This Must Be With The The Introduction Of Installations Must Also Be Taken Into Account. The Auditorium Is Current Barrier-Free Access Via The Schoolyard. Through The Cultivation Described Above Ogs It Will Be Connected To The New Elevator And Will Therefore Also Be Accessible From The Main Entrance Made Barrier-Free Accessible Through The Foyer. To Also The Middle Class Wing To Make It Accessible For People With Walking Difficulties, Which Is Currently Only Accessible Via Two Steps To Access The Stage Of The Auditorium, It Is Necessary That There Is One On The Side Of The Auditorium Ramp Is Formed.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7b3b6407-c5dd-45d5-a70b-3af7cf020c1e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders