GTR 74263995
Tenders are invited for Watertube Boiler
ICB — International Competitive Bid
Closed
Americas
Tender Information
GTR Reference
74263995
Tendering Authority
Subscribe to view
Tender No
24-10
Financer Name
Self-Funded
Work Title
Tenders are invited for Watertube Boiler
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Americas
Political Region
Asia Pacific Economic Cooperation APEC,APAC Asia Pacific
Last Date of Bid Submission
11-01-2024
Closed
Work Detail
Watertube Boiler Item Quantity Description Unit Price Total Price 1 1 Watertube Boiler Model: M5-700-4500-150St (460/3/60)-Std/Cfg • Boiler Capacity (Input) At 700 Ft: 4500Mbtu (Output: 3600Mbtu) • Application Environment: Indoor - Typical Boiler Room • Project Nema Rating: Nema 12 • Boiler Tube Wall Thickness: 0.095In • Fuel: Natural Gas • Design Pressure: 150Lb St • Operating Pressure: 100 Psig • Safety Valve Setting: 125Lb • Safety Valve Relieving Requirement: Full Capacity • Safety Valve Relieving Capacity: 3711 Lbs/Hr • Voltage: 460/3/60 • Customer Site Voltage: 460 V • Electrical Panel Configuration: Control Panel (Burner Mount) • Insurance Requirement: Csd-1 • Insurance Requirement: Fm • Packaged Boiler Ul Label: Ul Integral Burner Information: • Burner Modulation: Full Modulation • Blower Motor: Blower Motor: 3 Hp Total Enclosed Fan Cooled (460/3/60) • Blower Motor Starter: Iec • Altitude: 700 Ft Asl • Burner Input Capacity: 4500 Mbtu • Gas (Natural Gas) Emissions Level: Uncontrolled • Gas (Ng) Co Emissions Level: 200 Ppm • Minimum Gas Flow: 1500 Scfh • Maximum Gas Flow: 4500 Scfh • Burner Gas Turndown: 3 : 1 • Burner Modulation: Full Modulation • Burner Ignition Type: Spark Ignited Gas • Economizer Included Separately With Boiler Package: No Kunkle Safety Valve Arrangement (125Lb Hps): • Safety Valve #1: Inlet Size - 1 1/2In (Full Capacity) Boiler Pressure Vessel Package Steam Pressure Vessel Connections: • Stack Connection: 16In Sleeve • Steam Nozzle Connection: 3In Flanged 300Lb. R.F. • Feedwater Connection: 1In Npt (Back) • Blowdown Connection: 1.25In Npt (Front) • Surface Blowoff Connection: 0.75In Npt Steam Valve Arrangement: • Steam Valve Arrangement: Arrangement 4 • Steam Valves: Two Stop Valves • Steam Piping Options: Steam Spool Piece 1: 3In X 3In X 30In • Steam Spool Elbow: 3In X 3In • Steam Stop Valves: 3In 300Fl (Sl) O Steam Spool Piece 2: 3In X 3In X 12In O Free Blow Drain Valve Mounted On Spool Between Steam Stop Valves: 0.5 Npt Boiler Valves And Piping Arrangement : • 1 Quick / 1 Slow 1.25In Blowdown Valve Arrangement - Factory Piped Schedule 80 (Location: Front): O Slow Blowdown Valve: Npt Class 250 Iron (Qty: 1 Per Boiler) O Quick Blowdown Valve: Npt Class 250 Iron (Qty: 1 Per Boiler • Feedwater Valve Arrangement (Factory Assembled): 4 O Feedwater Globe Valve And Check Valve: 1In Npt Class 200 • Surface Blow Off Valve Arrangement (Factory Piped): O Surface Blowoff Manual Stop Valve: 0.75In O Npt Surface Blowoff Metering Valve: 0.5In O Npt Surface Blowoff Collector Pipe Level Control Package With Sch 80 Carbon Steel Piping • Main Low Water Cutoff: Main Low Water Cutoff: Mcd-M 157 Automatic Reset On/Off Float • Auxiliary Low Water Cutoff: Auxiliary Low Water Cutoff (Alwco): Mcdm1575 Manual Reset On/Off External Probe Miscellaneous Trim Options Package: • 3In Dial Stack Thermometer • 4.5In Dial 0-300 Psig Pressure Gauge #11 1 Boiler Controls Package: • Standard Non-Parallel Positioning Controls: O Modulating Control: Steam (Pressure) O Operating Pressure Limit Control O High Limit Control: Steam O Pressure Control Piping And Elbow Plugs: 0.75In Sch 80 Carbon Steel • Modulating Motor: Honeywell 0-135 Ohm • Cb780euv Combustion Flame Safeguard Package: • Miscellaneous Control Options: • Combustion Safeguard Control Mounted Display Module Front Control Panel Door (Nema 4 With External Reset) Miscellaneous Control Options: O Low Fire Hold: Minimum Temperature (Steam) O Remote Emergency Shutoff: Terminals Only O Steam Day Night Control Fuel Train Package For 700 Series: Primary Gas Train For Natural Gas: O Nema Rating: Nema 1 O Piping Material: Carbon Steel O Primary Gas Train Mounting Location: Left Side O Customer Site Gas Pressure: 140 In. W.C. (5.05 Psig) O Components From Customer Connection To Burner: Manual Valve #1: 2In Ball 5 Gpr Configuration: 210 2 (Standard Trim) Safety Shutoff Valves: Honeywell Dual_Motorized_1_Poc Ssov #2: 2In Manual Valve #2: 2In Ball Butterfly Valve: 2In Customer Connection: 2In Primary Gas Train Accessories: O High Gas Pressure Switch O Low Gas Pressure Switch O Vent Valve O Plugged Leakage Test Cock: 0.25In Brass Ball O 2.5In Steel Pressure Gauges With Bronze Shutoff Cocks At The Following Locations: Manifold Inlet/Regulator Outlet Natural Gas Pilot Gas Train Accessories: Natural Gas Customer Inlet Gas Pressure (In. W.C.): 140 In. W.C. O Natural Gas O Gas Pressure Regulator: Maxitrol 325-3 O Manual Shutoff Cock: Bronze O Solenoid Valve: Aluminum Body Boiler Electrical Package: • Main Power Distribution Type - Rotary Unfused Disconnect: Amps:30 Blower Motor Starter: Iec • Individual Power Distribution Type - Fuse Package Mounted In Control/Entrance Panel: • Cct Protection: 1.6 Amp Fuse (Qty:3) • Blower Motor Protection: 9 Amp Fuse (Qty:3) Boiler Panel Configuration And Panel Accessories: • Burner Mounted Control / Burner Panel Enclosure Configuration Nema 12 With Panel Accessories: O Electronic Sounder Audible Alarm O Alarm Silence Switch O Common All Function Alarm O Single Point Connection: - 460/3/60 O Circuit Wire: 16 Awg O Iec Entrance Panel O 22Mm Led Light Package With Standard Labels Mounted On Control/Burner Panel: Green Fuel Valve Light Red Flame Failure Light Red Low Water Light
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a8ec045a-bc35-44d9-ace7-cfbcf349ce7c.pdf
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.