GTR 74252382
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work - Extension Of The Fetscherplatz Stop With Nicolaistraße To Be Suitable For The Light Rail System; Lot 1 - Track And Road Construction, Civil Engineering Media
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
74252382
Tendering Authority
Subscribe to view
Tender No
783043-2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work - Extension Of The Fetscherplatz Stop With Nicolaistraße To Be Suitable For The Light Rail System; Lot 1 - Track And Road Construction, Civil Engineering Media
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
02-02-2024
Closed
Work Detail
Works For Complete Or Part Construction And Civil Engineering Work - Extension Of The Fetscherplatz Stop With Nicolaistraße To Be Suitable For The Light Rail System; Lot 1 - Track And Road Construction, Civil Engineering Media. 1. Track Construction And Road Construction Dvb Ag - Loosening And Loading Approx. 1,715 M3 Of Soil Or Rock - Transport Approx. 2,900 T Of Soil Or Rock - Dispose Of Approx. 2,900 T Of Soil Or Rock - Loosen And Load Approx. 1,700 M3 Of Track Ballast - Transport Approx. 3,100 T Of Track Ballast - Dispose Of Approx. 3,100 T Of Track Ballast - Take Up Approx. 210 M3 Layer Without Binder - Transport And Dispose Of Approx. 380 T Layer Without Binder - Approx. 3,380 M2 Of Asphalt Surface Pick Up - Transport Approx. 1,450 T Of Asphalt - Dispose Of Approx. 1,450 T Of Asphalt - Approx. Pick Up, Load And Transport A 330 M2 Paving Surface With Concrete Paving Stones And Dispose Of - Pick Up Approx. 70 M2 Of Concrete Slabs - Approx. 35 M2 Of Slabs Made Of Natural Stone - Pick Up And Store Approx. 250 M Of Natural Stone Curb - Remove And Store Approx. 1,335 M2 Of Natural Stone Paving For Reuse - Pick Up, Load And Remove Approx. 123 M2 Of Platform Slabs - Approx. 620 M2 Of Track Covering Slabs Pick Up, Load And Bring To The Clients Work Area - Approx. 120 M Gutter Made Of Paving Stones Made Of Concrete - Expand Approx. 850 M Of Single Track (Sleeper Track With Grooved Rails). And Loading, Rails To Werkplatz Ag - Approx. 230 M Dismantling Of Slab Track - 7 Systems Remove (Grooved Rails) - Approx. 75 M Of Railing - Dismantling - Dismantling Of 5 Street Bollards - Approx. 4,200 M2 Production Of Subgrade - Approx. 3,835 M2 Consolidation With Hydraulic Binder - Approx. 810 M3 Produce Base Layer Without Binder - Approx. 545 M3 Produce Antifreeze Layer - 98 Pieces. Expansion Of Track Drainage Boxes - Approx. 120 M Demolition Drainage Pipe - Approx. 175 M Production Of Drainage Pipe - 98 Pieces Of Rail Drainage Boxes - Approx. 969 M Of Single Track (Grooved Rails) On Slab Track With Two-Block Sleepers Set In Concrete Produce (In The Area Of The Lawn Track Two-Block Sleepers In A High Design) - Approx. 89 M Of Single Track (Grooved Rail) On Existing Two-Block Sleepers Already Set In Concrete Manufacture - Install 7 Systems (Grooved Rails) With Slab Track (1 Track Cross, 4 Double-Track Branches, 2 Single-Track Branches) - Making 2 Track Boxes For Switch Heating - Create Approx. 3,700 M2 Of Asphalt Pavement In The Track Area, Including Rail Chamber Filling And Joint Grouting - Approx. 155 M2 Asphalt Pavement Closure In The Street Area, Including Joint Grouting - Approx. 190 M2 Of Turf Track Covering (On Slab Track), Including Rail Chamber Filling - 2 Tram Stops With A Total Of 110 M Combibord Dresden As Well As Platform Panels And Guidance System For The Blind Manufacture - Approx. 780 M2 Manufacture Area Paving Monolith - Approx. 45 M2 Manufacture Paving Paving With Large Paving Stones Made Of Natural Stone - Approx. 235 M2 Producing Paving Paving With Small Paving Stones Made Of Natural Stone - Approx. 225 M Of Wide Borders Made Of Natural Stone - Make Approx. 200 M Gutter Out Of Copper Slag - 3 Pieces. Bicycle - Leaning Bracket - Approx. 75 M Installation Of Welded Tubular Steel Railing - 3 Pieces. Waste Paper Basket - New Building - 2 Pieces Install The Fis 8 Bus Stop Stele With Integrated Dfi And Sound System - 2 Large Displays Convert - Install 4 Pcs 3-Seater Seating Group - Various Markings In The Track Area Manufacture - Civil Engineering Services For Stop Equipment And Switch Control/Traction Power: Production Of Approx. 330 M Of Trench And Production Of Approx. 1,145 M Of Cable Protection Pipe, Various Dn, 15 Pcs Cable Ducts - 94 Pcs. Planting Of Shrubs, Topsoil And Tree Site Improvement - 94 Pcs. Shrubs Completion And Development Assistance - Signage - Creating Various Markings In The Roadway Area - Civil Engineering Services For Traffic Signals / Bü82 2. Road Construction Sta - Approx. 1,795 M2 Of Bituminous Road Pavement Remove - Approx. 2,360 M2 Of Various Natural Stone Paving - Approx. 620 M2 Of Various Remove And Store Natural Stone Paving For Reinstallation - Approx. 85 M2 Of Concrete Slabs Expand - Approx. 45 M2 Expand Granite Crust Slabs - Approx. 270 M Expansion From Borden Natural Stone - Approx. 435 M2 Removing Layers Without Binders - Approx. 1,200 T Of Soil Remove - Create Approx. 925 M3 Of Frost Protection Layer - Create Approx. 910 M2 Of Solidification With Hydraulic Binder - Approx. 230 M2 Paving Surface Made Of Large Paving Stones Produce Natural Stone - Approx. 1,025 M2 Paving Surface Made Of Small Paving Stones Made Of Natural Stone Manufacture - Approx. 55 M2 Installation Of Granite Crust Slabs - Approx. 485 M2 Installation Of Concrete Paving - Production Of Guidance System For The Blind - Approx. 300 M Wide Board Made Of Natural Stone - Approx. Create 825 M Of Channel From Copper Slag - Approx. 2,845 M2 Of Asphalt Pavement In The Road Area Manufacture, Including Joint Grouting - 35 Pieces Of Street Gullies, Including Approx. 180 M Of Drag And Connecting Pipes, Remove - Approx. 180 M Of Street Drainage Canal Up To Dn 150, Manufacture - Approx. 124 M Installation Of Box Gutter - 38 Pcs Street Gullies, Including Approx. 180 M Trailing And Connecting Cables, Produce - 6 Pieces. Bicycle - Leaning Bar - Civil Engineering Services For Traffic Lights: Construction Of Approx. 235 M Of Trench And Construction Of Approx. 235 M Cable Protection Pipe Of Various Dimensions, Delivery And Installation Of 6 Cable Ducts, Manufacture Of A Total Of 12 Pole Foundations - Civil Engineering Services For Public Lighting: Production Of Approx. 145 M Of Trench And Production Of Approx. 52 M Of P90 Cable Protection Pipe, Creating A Total Of 3 Mast Foundations, Setting Three Masts - 1 Piece. New Tree Planting Including Completion And Development Assistance 3. Services For Urban Drainage Systems Dresden: - Height And Position Adjustment Of 9 Shafts In The Track Area - Height And And Positional Adjustment Of 7 Shafts In The Street Area - 1 New Shaft Dn 2000 B, < 5 M Depth - 1 Piece Of New Construction Of Crash Structure And Unification Structure, Approx. 5 M Depth 4. Services To Other Utility Companies Facilities - Civil Engineering Services For Sachsenenergie-Tw: Construction Of Approx. 110 M Of Trench, 25 M Of New Protective Pipe Dn1200 (Under The Track Area), 5 M Extension Of Protective Pipe Dn200, Expansion Of 90 M Of Old System Dn150 To Dn600 - Civil Engineering Services For Sachsenenergie-Elt Ms/Ns
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6856d280-1971-4ffb-af17-634f4c45a083.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.