GTR 74206561

Tenders Are Invited For Updating The Design And Cost Estimate Documentation For The Thermal Modernization Of A Residential Building And Redesigning The Change In The Heating Method In Rybnik At Ul. Gliwicka 50

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
74206561
Tendering Authority
Subscribe to view
Tender No
DZP.2120.0035.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Updating The Design And Cost Estimate Documentation For The Thermal Modernization Of A Residential Building And Redesigning The Change In The Heating Method In Rybnik At Ul. Gliwicka 50
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
09-01-2024 Closed
Work Detail
The Subject Of The Order Is To Update The Existing Design And Cost Estimate Documentation For The Thermal Modernization Of A Residential Building Prepared In August 2022 And To Redesign The Change In The Method Of Heating Apartments Due To The Refusal To Sign Connection Agreements By Pgnig Termika Energetyka Przemysłowa S.A. Necessary For The Ordering Party To Organize And Conduct A Public Procurement Procedure Pursuant To The Public Procurement Law And To Obtain A Building Permit Or To Notify The Intention To Perform Construction Works. Documentation In Pdf - Annex To The Swz. Characteristics Of The Facility: Number Of Apartments - 5 Usable Area - 256.00 M2 Volume - 2,452.00 M3 Residential Building, Built In 1912, Three-Story, Attic, Basement, Brick, Wooden Roof, Sloping, Tiled Roof. Plot No. 4469/5 Required Scope Of Study For The Premises: 1) Technical Assessment Of The Buildings Structural Elements Together With The Identification Of Possible Repair, Strengthening Or New Works To Be Performed And Including Them In The Design And Cost Estimate Documentation, 2) Designed Energy Performance Of The Building, 3) Energy Audit Along With With Presentation Of The Output Data Used For Calculations In Energy Audits Carried Out. The Energy Audit Should Be Performed In Accordance With The Energy Audit Template Based On The Instructions For Completion: Https://Funduszeue.Slaskie.Pl/Dokument/Szablon_Audytu_Energetyczny_Zalacznik_Wod_0207234) Update Of The Architectural And Construction Design, Technical Design For Thermal Modernization Of The Facility Based On Applicable Regulations, Including Current Technical Conditions Along With Liquidation Coal Furnaces, 5) Architectural And Construction Design, Technical Design: - Adaptation Of The Technical Room For The Installation Of A Heat Source With The Necessary Equipment, - Internal Central Heating Installation Powered By An Air Heat Pump, - Internal Hot Water Installation In Terms Of Connecting Existing Devices Or Execution New, - Electrical Installations For Connecting The Designed Devices, 6) Arrangements With The Municipal Conservator Of Monuments, 7) Bills Of Quantities, 8) Technical Specifications For The Execution And Acceptance Of Works, 9) Investor Cost Estimates (Updating Investor Cost Estimates Within A Period Of 3 Years From The Date Of The Protocol Submission Documentation),10) Collective Cost Statement,11) Schedule For Carrying Out Construction Works,12) Obtaining A Building Permit Or Reporting The Intention To Carry Out Construction Works (Respectively: Providing Approved Documentation With A Building Permit Or Providing Approved Documentation With Reporting The Intention To Carry Out Construction Works And A Certificate From The Department Of Architecture Of The Rybnik City Hall About The Lack Of Grounds For Raising An Objection, Or Providing Approved Documentation Along With The Notification Of The Intention To Perform Construction Works And The Expiry Of The Statutory Deadline Within Which The Architectural And Construction Administration Body May Raise An Objection, Or If A Permit Or Notification Is Not Required, Then The Contractors Declaration In This Respect Along With Information From The Department Of Architecture Of The Rybnik City Hall About The Lack Of Need To Obtain A Building Permit Or To Notify The Intention To Perform Construction Works). Additionally, The Documentation Should Include: 1) A Band Around The Building Along All Foundation Walls, 2) Insulation Of Foundation Walls To The Full Depth Of The Foundation, 3) Replacement Of Damaged Roofing Elements Over External Stairs Together With The Roof Covering, 4) Installation Of Snow Ladders On The Roof, 5) Replacement Of Chimney Sweep Benches, 6) Replacement Of Damaged Bricks Of Plinth Walls, 7) Construction Of Half-Timbered Wall Elements In The Form Of Strips Larch Panels Mounted To The Facade, 8) Relocation Of Existing Antennas And Installation Of New Ventilation Grilles On The Facade. Design Documentation For The Premises Should Consist Of: 1) Designed Energy Performance - 2 Copies, 2) Energy Audit - 2 Copies, 3) Energy Audit In Accordance With Template - 2 Copies,4) Land Or Plot Development Project (In Accordance With The Construction Law) - 4 Copies,5) Architectural And Construction Design And Technical Design Together With The Necessary Studies - 4 Copies Each,6) Investor Cost Estimates - 1 Copy,7 ) Bills Of Quantities Together With A List Of Materials - 2 Copies, 8) Technical Specifications For The Execution And Acceptance Of Works - 1 Copy, 9) Schedule For The Execution Of Construction Works - 1 Copy. Studies Should Also Be Prepared In An Electronic Version On A Data Carrier (Cd Or On A Portable Device With Non-Volatile Flash Memory) - 2 Pcs.). All Materials On The Data Carrier Should Be In Pdf Format, Appropriately Grouped And Described, And In Electronic Version In The Form Of Editable Files. Valid Formats: - Descriptions, Specifications - In *.Odt Or *.Doc Format, - Drawings - In *.Dwg Or *.Dxf Format, - Cost Estimates - In *.Ath Or *.Kst Format (V 4.36 Or Lower) - Construction Works Schedule - In *.Xls Format - Audits - In *.Xls Format Scope Of Work Necessary For Design: 1) Carrying Out A Site Visit, 2) Obtaining Data For Design, 3) Obtaining The Necessary Arrangements And Opinions For The Developed Scope Of The Project (Incl. Including, Among Others, Electricity Connection Conditions, Assessment Of Technical Condition), 4) Inter-Industry Coordination Of Design Solutions, 5) Consulting Design Solutions With The Ordering Party, 6) Execution And Checking Of The Design In Terms Of Compliance With Regulations And Standards By A Person With Construction Qualifications For Design In The Specialty :A) Architectural,B) Construction,C) Installation In The Field Of Heating, Ventilation, Gas, Water And Sewage Networks, Installations And Devices, D) Installation In The Field Of Electrical And Power Networks, Installations And Devices, The Contractor Is Obliged To Perform Authors Supervision From The Date Of Commencement Of Construction Works To The Date Of Their Completion. The Supervision Covers The Following Industries: Architecture, Construction And Construction, Installation Of Heating, Ventilation, Gas, Water And Sewage Networks, Installations And Devices, Installation Of Electrical Networks, Installations And Devices Power Engineering And Involves: 1) Preparing Substitute Design Solutions (Discrepancies Between The Actual And The Designed State) Without Additional Remuneration, 2) Ongoing Consultation Of Problems Arising During The Project Implementation, 3) Participation In Regular Meetings Of Contractors With Inspectors, 4) Assessment Correctness And Quality Of The Works Carried Out And Their Compliance With The Solutions Included In The Project. Supervision Activities Will Be Performed As Necessary, At The Request Of The Ordering Party Submitted At Least Three Days In Advance In Writing, Fax Or Electronically. The Detailed Scope Of The Service Is Specified In The Specification Of Order Conditions.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
647092b5-117b-4472-b6d2-fa399643b68d.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders