GTR 74103351
Tenders Are Invited For Modernization Of The Bms System Based On The Existing Delta Controls And Halton Architecture.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
74103351
Tendering Authority
Subscribe to view
Tender No
FZ/5914/PH/23
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Bms System Based On The Existing Delta Controls And Halton Architecture.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
28-12-2023
Closed
Work Detail
The Subject Of The Order Is The Implementation And Launch Of A Bms System Using Existing Delta Controls And Halton Components. The Ordering Party Informs That The Building Of The Center For Clean Coal Technologies (Cctw) Has Had A Bms System In Place Since 2012, Which Requires Updating. The Ordering Party Requires The Use Of Existing Delta Controls Elements Such As: Entelibus Ebm-800 Modules, Entelibus Expanders, Tt-552-B-250 Duct Temperature Sensors, P604-92 Differential Pressure Switches, Entelibus Ebcon Controllers, Trm-768 Network Terminators, Sf24a Damper Actuators S2, Dac-1146 Application Controllers, Dfm-1600 Input Modules, Dac-1600 Application Controllers. The Use Of The Solution Names Enteliweb, Enteliviz, Etc. Results From The Fact That The Cctw Building Has Implemented Delta Controls Controllers, Which Are Supported By This Software - It Is A Solution Dedicated To Controller Data. The Ordering Party Provides, In The Form Of An Attachment, A Screenshot Of The Graphics Currently Used In The Delta Controls System (Annex No. 6 To The Swz) - The Graphics Indicate What Parameters Are Collected From Individual Devices And Systems. The Scope Of The Order Includes The Purchase And Installation Or Replacement: 1) Server With The Following Minimum Parameters: Processor, E.G. Intel Xeon, Hdd 2X 1 Tb (Raid) With The Windows Server 2016 Pl Standard Operating System. The Ordering Party Allows Equivalent Solutions.2) Workstation With The Following Minimum Parameters: Processor, E.G. Intel I5 - 13Th Generation, 16 Gb Ram, Hard Drives: 512 Gb Ssd + 1Tb Hdd, Windows 10/11 Professional Operating System, Two Lcd Monitors Of At Least 24 Inches.3) Enteliweb 2500 I/O Points License With A 14-Month Trial Version Of The Energy Management Extension.4) Entalivault Software License As An Enteliweb Extension Enabling Archiving Up To 100,000 Trends - Equivalent To Historian.5) 10 Differential Air Pressure Sensors Pa267, Ip65, 0- 2500Pa, 0-10V Dc Or Equivalent6) 2 Contact Temperature Sensors, E.G.: Sontay Or Equivalent7) 5 Pa-Dps-92W – Ip65 Pressure Switches Or Equivalent For Outdoor Installation.8) 5 Czf-310 Phase Sequence Sensors Or Equivalent.9) Auxiliary Contact For Pkzmo-0.4 Or Equivalent.10) 4 Hermetic Boxes 130X130z110 For A Pressure Switch With 12 Chokes.11) Configuring A Detailed Analysis Of Energy Consumption Based On Data From Available Energy Analyzers.12) Optimizing And Implementing Scenarios Reducing The Energy Consumption Of Air Handling Units, Supply Systems, Domestic Fans In Defined Situations.13) Creation Of Graphic And Text Signaling (Alarm) Of Loss Of Communication By Controllers Of The Most Important Elements Of The Bms System (Handling Units, Rooftops, Supply Systems). Complete Rework Of The Home Screen / Introduction Of A New Summary Screen. Introduction Of A List Of Ventilation Units (Working, Failure, Communication).14) Creation Of A New Visualization In The Enteliviz Environment - Graphics In A New Standard, Viewed By Logging In To A Browser Window Such As Chrome Or Opera. Moreover, After Configuring The Vpn Server, Enabling Remote Access To The Visualization With Full Functionalities. 70 Graphics Are Used In The System Currently Operating At The Ordering Party. 15) Configuration Of Remote Access For Service And Notification Of Critical Failures. 16) Configuration Of A New Variable Archiving System - Optimization Of The Number Of Counted Samples, Removal Of Unfavorable Trends, Change Of Configuration Of Chart Summaries, Deletion Of Selected Summaries. 17) Implementation Of Algorithms Controlling Common Ventilation, Making Its Operation Dependent On General Ventilation, Introducing Monitoring Of Excessive Work Beyond The Standard Configuration, Supplementing The Visualization With Operating Times Expressed In Hours, Appropriate Colors. 18) Changing The Lighting Control System - Adding An Astronomical Clock For External Circuits , Other Circuits Controlled Individually Or In Groups, A Screen Summarizing The Settings And Status Of The Circuits.19) Implementation Of A New Control Algorithm For Air Handling Units.20) Delivery And Installation Of 4 Pa-Dps-92W Pressure Switches Or Equivalent - Changing The Position To The Optimal One And Adding 4 Hermetic Boxes.21 ) Delivery And Installation Of 7 Pressure Sensors, E.G. Sontay Or Equivalent.22) Delivery And Installation Of 2 Stick-On Temperature Sensors.23) Reading And Making New Graphics For 66 Halton Flow Regulators - Reading Of Parameters Such As Speed, Flow, Setting, Balance, Alarm Threshold, Alarm And Operation - Currently No Communication.24) Reading And Creating New Graphics For 18 Pozyton Seab Electricity Meters - Currently No Communication.25) Conducting Instructions And Training Of Persons Designated By The Ordering Party To Operate The Bms System (Maximum 5 People)26) After Completed Work, The Contractor Should Provide At Least: A) Description Of The Modernized System And Its Architecture. B) Copy Of The Old And New Database C) Backup Of The New System, E.G. On A Pendrive) Description Of The Network Configuration) Description Of The Workstation And Server Settings27) Carrying Out Free Periodic Inspections During The Warranty Period Every 6 Months Periodic Inspections Must Include At Least: A) Diagnostics Of 11 Sets Of Frapol Air Handling Units By Measuring Static Pressure - Determination Of The Air Handling Units Flow As A Function Of The Difference At The Measuring Stubs, B) Checking The Correct Operation Of The Basic Bms Server, C) Checking The Correct Operation Of The Database, D ) Checking The Correctness Of The Backup Copy, E) Checking The Correct Functioning Of The Air Handling Unit Sensors And System Sensors, F) Checking The Correctness Of The Alarm Threshold Settings, G) Checking The Correctness Of Reading The Air Flow Efficiency By The Halon Controllers. The Ordering Party Requires A Minimum 24-Month Warranty And Guarantee For Failure-Free Functioning Of The Bms System.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
402bf886-76a8-414b-95bc-6b8b746923d2.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.