GTR 74051573
Tenders Are Invited For Installation Of Windows - We 5194 Staircase Window Hinges_V2
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
74051573
Tendering Authority
Subscribe to view
Tender No
765448-2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Installation Of Windows - We 5194 Staircase Window Hinges_V2
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
16-01-2024
Closed
Work Detail
Installation Of Windows - We 5194 Staircase Window Hinges_V2. In Kruckenbergstr. 40-64 (Without 54) In 12107 Berlin Will Have 45 Stairwell Window Bands With A Number Of Floors Of 3 To 7 Floors Or Approx. 10 To 25 M High In 13 Staircases To Be Renewed. In The Individual Stairwells There Are 3 To 4 Rows Of Windows Per House Entrance Available. There Were Minor Concentrations Of Asbestos In The Interior Plaster (Filler). Proven. To Carry Out The Renovation Work, In Front Of The Window Strips Scaffolding Was Erected On The Outside And Covered With Scaffolding Tarpaulins To Make It Dust-Tight. Inside Dust Protection Walls Are Erected In Front Of The Window Strips. Before Each Of The Ones To Be Built Scaffolding Towers Are Constructed With 3-Chamber Locks To Protect Against Contamination. The The Pollutant Remediation Must Be Carried Out In Accordance With Trgs519 Or Trgs521. In The Kruckenbergstr. 40-64 (Without 54) In 12107 Berlin Should Have 45 Staircase Window Bands A Number Of Floors Of 3 To 7 Floors Or Approx. 10 To 25 M High In 13 Stairwells To Be Renewed. In The Individual Stairwells There Are 3 To 4 Rows Of Windows Per House Entrance Available. There Were Minor Concentrations Of Asbestos In The Interior Plaster (Filler). Proven. The Thermal Insulation In The Functional Area Of The Window Strips And As Connections The Sealing Tapes Carried Out Are Also Sampled For Harmful Substances From Kmf Or Asbestos Been And Rated Positively. The Demolition And Removal Of The Old Window Elements Are Carried Out By The Contractor. Scheduling Coordination With The Waste Disposal Company/Transporter Is Carried Out By The Contractor. A Waste Manager Is Appointed By The Client. The Plenipotentiary Of The Ag Creates The Disposal Certificates For The Waste And Indicates The Disposal Facilities To. To Carry Out The Renovation Work, The Window Strips Are Installed On The Outside Scaffolding Was Erected And Covered With Scaffolding Tarpaulins To Make It Dust-Tight. During The Demolition Work The Asbestos-Containing Facade Panels Are Made Of Fiber Cement In The Connection Area To The Window Strips Removed Before Scaffolding Is Erected. Then The Old Wooden Windows Including The Contaminated Thermal Insulation And The Contaminated Sealing Tapes And Gone. On The Inside, Dust Protection Walls Are Built In Front Of The Window Strips. In Front Of Each Of The Scaffolding Towers To Be Erected, 3-Chamber Locks Built. The Pollutant Remediation Must Be Carried Out In Accordance With Trgs519 Or Trgs521. After The Pollutant Remediation, A Clearance Measurement Of All Stairwells Is Carried Out. The Resulting Window Openings In The Stairwells Are Used As Fall Protection Completely Closed With Wooden Panels For Weather Protection. The New Ones To Be Built 45 Stairwell Window Strips (Approx. 1,000 M² Window Area) Will Be Delivered After Completion Statics And Work Planning With Fall-Protecting Glazing According To Din18008-4 (Formerly Trav) Erected Including The Necessary Fasteners And Performance Inside And Outside. The New Window Frames Are Made From Aluminum Window Profiles. The Window Sealing Is Carried Out According To Ral Installation Guidelines. After Window Installation New, Asbestos-Free Fiber Cement Panels Are Installed In The Connection Areas According To Local Measurements Mounted On The Stairwell Window Strips On The Existing Uk. In The Stairwell Areas The Milled Areas Of The Interior Plaster (Filler) Are Covered With Asbestos-Free Materials Restored. Execution Of The Work To Replace The Stairwell Window Bands Only Possible For Companies With Approval According To Trgs519 And Trgs521. A Written Proof Suitability Must Be Presented When Submitting The Offer. The Person Responsible For The Work Under Asbestos Conditions Must Always Be Present On The Construction Site.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
956cb51f-3bb4-4ef8-99af-4aadaf567c48.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.