GTR 73975551
Tenders Are Invited For Project 23.215/1 - Haaltert, Disconnection Island
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
73975551
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Project 23.215/1 - Haaltert, Disconnection Island
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
22-12-2023
Closed
Work Detail
Project 23.215/1 - Haaltert, Island Disconnection - Carrying Out Topographical Operations - Carrying Out Archaeological Research (Depending On The Results Of The Landscape Drilling To Be Carried Out Outside The Present Assignment And Prior To The Start Of The Works) - Insuring Of The Water Discharge From The Existing Sewerage System And From The Molenbeek - Cutting Down Trees And Shrubs - Breaking Up Pipes, Inspection Pits, Roadway And Roadside Paving, Linear And Local Elements (Street Drains, Signaling, Etc.) - Installing Sewers In Unreinforced Concrete Pipes Di. 400, 500 And 800 Mm, Steel Fiber Reinforced Concrete Pipes Di. 400 Mm, Reinforced Concrete Pipes Di. 800 Mm, Clay Pipes Di. 250 Mm And Prefabricated Tubes, Installing Inspection Chambers And Making Connections To The Sewerage System - Constructing An Overflow Construction Os1 - Carrying Out Earthworks (For Road And Sewerage Works) And Possible Soil Improvement Through Soil Replacement - Removing Soil Surpluses - Applying Of Continuous Shoring For Construction Trenches - Applying Soil Improvement Techniques Under Foundation Attachment Pipes - Constructing A Graduated Soil Mix Wall Perpendicular To The Sewer Trench (Block Foundation) - Carrying Out Test Drainage, Controlled Drainage, Monitoring Settlements And Placement And Measuring Monitoring Pipes - Constructing Buffer And Infiltration Ditches Including Slope And Soil Reinforcement - Carrying Out Works On Watercourses - Constructing End Walls, Squeeze And Overflow Constructions/Thresholds In Reinforced Concrete - Constructing A Kws Paved Roadway On A Crushed Stone Foundation And Sub-Foundation - Adjusting The Road Verges In The Same Material As The Existing Paving - Constructing Edge Strips And Water Ditches On A Crushed Stone Foundation - (Re)Installing Traffic Signaling - Supplying, Installing, Replacing And Removing Site Signaling - Supplying, Installing, Replacing And Removing Of Road Diversion Signaling - (Carefully) Breaking Up And (Re)Placing Barriers - Cleaning, Cleaning And All Necessary Operations To Bring The Works Into A State Of Training - Carrying Out Planting Works (Replanting Trees) And Green Maintenance During The Guarantee Period ( 2 Years) - Carrying Out The Necessary Works During The Warranty Period (2 Years).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7502488c-8708-4566-bdad-bfa7ca3d6c1b.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.