GTR 73907183
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Tnw_Handwerkskammer Niederbayern-Oberpfalz - New Construction Of The Landshut Education Center - Project Management
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
73907183
Tendering Authority
Subscribe to view
Tender No
757704-2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services - Tnw_Handwerkskammer Niederbayern-Oberpfalz - New Construction Of The Landshut Education Center - Project Management
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
10-01-2024
Closed
Work Detail
Architectural, Construction, Engineering And Inspection Services - Tnw_Handwerkskammer Niederbayern-Oberpfalz - New Construction Of The Landshut Education Center - Project Management. The Chamber Of Crafts Wants To Invest In Craft Education In Landshut Intends To Rebuild Large Parts Of The Landshut Education Center. . The Educational Enterprise Must Be Maintained During The Construction Phase, Which Is Why The Existing Building, Building A And B Cannot Be Canceled In Advance. The Project Should Be Divided Into 2 Construction Phases Will Be Built And The Educational Operations Will Be Carried Out In The Existing Buildings If Possible With Few Failures And Disruptions. The Buildings Must Then Be Demolished. Which Must Also Be Accompanied By The Project Manager. . Buildings D (Workshops For The Agricultural Machinery Mechanics) And Building E (Workshops For The Construction Trades) Are Existing Buildings And Not The Content Of The Construction Project. These Buildings Remain Untouched. . The Property Size For The Corridor Numbers 1262/4, 1262/5 And 1262/6 Is Approx. 20,000 Square Meters, The Gross Floor Area Is Approx. 9,800 M², The Gross Volume Is Approx. 44,000 M³ And The Usable Area Is Approx Approx. 5,450 M². The Design Planning Is Expected To Be Completed By The Time The Order Is Placed And The Z Building Application Will Probably Have Already Been Submitted By Then Be. However, Planning Documents Cannot Yet Be Made Available, As There Has Not Yet Been Any Approval From The Donors. . In The New Buildings Should Workshops For Automotive, Electrical, Metal, Welding And Orthopedic Technology Be Accommodated. The Room Program Also Includes Teaching Rooms And A Canteen Kitchen And Rooms For Administration. The Approved Room Program Is Enclosed. Tenders Are Scheduled To Begin In Summer 2024. The Planned Start Of Construction For The First Construction Phase, The Commissioning Of This Construction Phase Is March 2025 Should Take Place In September 2026, After Which The Existing Building A Will Be Demolished. With The Second Construction Phase Is Scheduled To Begin In December 2026, With The Commissioning Of The The Second Construction Phase Is Scheduled For May 2028. Following This You Will Find Demolition Of The Existing Building House B And The Creation Of The Outdoor Area. . The Parties (Specialist) Planners Can Be Found In The Draft Contract. . The Existing Design Planning Must Be Implemented In Accordance With The Funding Notices. The Chamber Of Crafts Is Responsible For The Craft Industry To Fulfill An Educational Mission And Is An Important Part Of The Educational Campus City Of Landshut. The Ecological And Economic Aspects Must Also Be Taken Into Account Comprehensively. Particular Emphasis Must Be Placed On Sustainability, While Also Keeping The Follow-Up Costs In Mind Must Be Retained. The Management And Operating Costs Must Also Be Taken Into Account Become. . The Construction Project Is Largely Financed With Federal Funds And The Free State Of Bavaria As Well As Possible Funding From The Eu (Erdf). The Requirements For Public Clients Must Be Taken Into Account When Carrying Out The Project. The Project Was Developed By The Bmwk As A Pilot Project For Sustainable Energy Concepts For Inter-Company Companies Educational Institutions Selected. In This Context, Energy Efficiency And Sustainability Should Be Considered Be Considered Both During Construction And During Operation. . The Total Cost The Measure Is Roughly Eur 66 Million Gross (Kg 200-700) At The Time Of The Cost Estimate. There Is No Additional Financing, So This Is Included In The Cost Calculation Fixed Costs Must Be Adhered To. . As Part Of This Procurement Process The Project Management Services Of Performance Levels 3 To 5 (Execution Preparation, Object Monitoring And Project Completion) According To The Project Management Performance Profile Project Management Contract Hav-Kom, Substantiated By The Additional Contractual Provisions (Zvb-Ps) For The Project Management Contract. This Must Be Taken Into Account Also The Familiarization With The Project. The Services Relating To Funding Law Matters (Rz Construction, Vhb Bayern, Additional Work On Construction Accounting, Retrieval Of Funds, Additional Work On Budget Planning Etc.) As Well As The Proof Of Use/Audit Are Included In The Basic Services Covered By The Zvb-Ps Performance Profile. Participation Is Also Part Of This Service When Checking The Proof Of Use Up To The Final Decision. Also For This One Services Are Available To The Project Controller As Part Of His Assignment.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c2c8b18e-52ff-43cd-a612-7c8a08c67e2d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.