GTR 73858095
Tenders Are Invited For Comprehensive Thermal Modernization And Replacement Of Internal Lighting Of An Office And Warehouse Building At Ul. Krzywa 3 In Zawiercie.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
73858095
Tendering Authority
Subscribe to view
Tender No
ZGK.TP-01/12/2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Comprehensive Thermal Modernization And Replacement Of Internal Lighting Of An Office And Warehouse Building At Ul. Krzywa 3 In Zawiercie.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
28-12-2023
Closed
Work Detail
1. The Subject Of The Order Is: Comprehensive Thermal Modernization And Replacement Of Internal Lighting Of The Office And Warehouse Building At Ul. Krzywa 3 In Zawiercie.2. Existing Condition: Existing Industrial Building (Production And Warehouse) With A Simple Form. Two-Story Building, No Basement. Flat Roof Of The Building With External Drainage.3. Designed Condition: - Reconstruction Of The Building Through New Arrangement Of Rooms, - Reconstruction Of The Facade Through New Arrangement Of External Joinery, - Reconstruction Of The Roof By Reducing The Roof Skylight, - Insulation Of The Building, I.E. External Walls And The Flat Roof. - Renovation Of Internal Installations In The Building In Use: - Water Supply, - Sanitary Sewage System, - Central Heating. - External Electrical Installation. As A Result Of The Reconstruction, The Space In The Production And Warehouse Part Will Be Opened, Which Will Enable Better Functional Planning Of The Plants Operation Technology. The Longitudinal Walls Will Be Equipped With Natural Lighting In The Form Of Windows And Glass Windows. There Is An Addition In The Roof Above The Production And Storage Part. Lighting In The Form Of A Roof Skylight. Two Main Entrances To The Plant On The Southwest Elevation. Separate For Men, Women And Disabled People. The Main Entrances Have Vestibules Manufactured By From Unused Staircases (The Second Floor In The Building Is Excluded From Use). The Entrance Level To The Building Is Up To 2 Cm Above The Level. Adjacent Area. Disabled People Have Access To The Building. The Social And Office Facilities Are An Integral Part Of The Plant And Are Functionally Related To It. In The Central Part Of The Building, On The Ground Floor, There Will Also Be A Pellet Boiler Room And An Adjacent Fuel Storage Facility..3. The Scope Of Construction Works Includes:3.1. Construction Industry:1) Demolition Works.2) Renovation Of Steel Elements.3) Reconstruction Of The Buildings Interior:- Masonry Works.- Construction Of New Door Openings.- Construction Works.4) Reconstruction Of The Buildings Facade:- Masonry Works.- Construction Of Reinforced Concrete Cores.- Construction Of New Window And Door Openings.5) Reconstruction And Renovation Of The Roof Skylight.6) Maintenance Of The Unused Floor.7) Renovation Of The Steel Ladder - North-West Elevation.8) Insulation Of The Building: - Preparatory Works.9) Replacement Of External Joinery / Joinery: - Disassembly Of The Existing External Joinery. - Installation Of New Window Joinery And Door Joinery. - Installation Of Windows With A Thermal Break. - Installation Of Gates. - Internal Finishing Works. Substrate.- Installation Of The Eaves.- Insulation Of The Flat Roof.- Installation Of Chimney Pots.- Installation Of Fireplaces To Ventilate The Covering.- Installation Of Sheet Metal Flashings.11) Insulation Of The Building Walls: - Surface Priming.- Moisture-Proof Insulation.- Adhesive Mortar.- Thermal Insulation:- Styrofoam Boards: - Mineral Wool. - Mineral Wool - Reinforcement. - Intermediate Coating.12) Plastering Mass: - Plinth And Entrance Zone - Wall Above The Plinth.13) Technology Of Procedure For The Implementation Of Insulation.14) Preparatory Work.15) Preparation Of Adhesive Mass .16) Gluing Thermal Insulation Boards.17) Installation Of The Reinforcing Layer:- Reinforcement Of The Reinforced Zone.- Reinforcement Of Window Corners.- Reinforcement Of The Facade Surface.18) Insulation In Special Places:- Wall In The Plinth Zone.- Corners.- Window And Door Jambs. - Lightning Protection Installation. - Ventilation Grilles.19) Preparation Of The Intermediate Layer: - Execution Of Façade Plaster.20) Installation Of Entrance Canopies.21) Installation Of Gutters And Downpipes.22) Installation Of Ventilation Grille.23) Execution Of New Sheet Metal Flashings.24) Installation Of Lighting External.25) External Elements.26) Final Works.3.2. Sanitary Industry: 1) Water Installation: Cold Water Supply To The Building From The Existing Water Supply Connection. 2) Sanitary Sewage Installation: Discharge Of Sanitary Sewage From The Building Using An Internal Installation Connected To The Existing Sanitary Sewage Connection. 3) Gravity Ventilation: In Some Rooms, Designed Is The Construction Of New Gravity Ventilation Chimneys.4) Central Heating Installation: Solid Fuel Boiler Room: To Power The Heating Installations In The Facility, A Solid Fuel (Pellets) Boiler Room With A Nominal Power Of Approx. 60 Kw Is Designed, Located On The Ground Floor Of The Building In The Place Of The Closed Boiler Room. . Central Heating Installation: In Order To Cover The Heat Losses Of The Rooms In The Building, At The Assumed Temperatures Resulting From The Applicable Regulations, Pumped Water Heating Of A Two-Pipe System Is Planned.3.3. Electrical Installation: 1) Electrical Power Supply Of The Facility: For Power Supply Purposes, It Is Planned To Use The Existing Power Supply Via An Overhead Connection To The Building. 2) Fire Switch Board: For The Entire Facility, A Main Switch Board Is Planned To Be Installed On The Façade. The Board Will Be Delivered In An External Version, Resistant To Weather Conditions And Fire Extinguishing Agents.3) Intermediate Electrical Boards: Electrical Boards Used In The Facility Should Be Delivered Adapted To The Installation Of Electrical Equipment In A Modular Version.4) Emergency And Evacuation Lighting: Due To The Nature Of The Facility Emergency Lighting Installation Is Planned.5) Emergency Lighting: The Facility Is Expected To Use Led Lighting Fixtures.6) Installation Of 230V Plug Sockets.7) Anti-Shock Protection.8) Equalizing Installations.9) Power Balance.4. The Detailed Scope Of Works Is Specified In The Design Documentation, Spec. Technical Execution And Acceptance Of Construction Works. And Bills Of Quantities (As An Auxiliary Element For Price Calculation), Which Constitute An Appendix To Swz.5. The Prepared Offer Must Be Consistent With The Subject Of The Order, Design Documentation And Specifications. Technical Execution And Acceptance Of Works.6. The Contractors Settlement For The Execution Of The Subject Of The Order Will Be In Accordance With The Draft Provisions Of The Contract.7. The Contractor Is Obliged To Provide A Warranty For The Item. For Not Less Than 3 Years From The Date Of Final Acceptance.8. Warranty Period For The Purchased Item. Is 5 Years.9. Obligation To Employ Under An Employment Contract: In Order To Fulfill The Obligations Specified In Art. 95 Of The Public Procurement Law Requires That, As Part Of The Implementation Of The Contract, Activities Related To The Subject Matter Of The Contract Included In The So-Called Direct Costs Resulting From The Bill Of Quantities Attached To The Swz (I.E. Construction Works, Sanitary Works, Electrical Works), Were. Performed By Persons Employed Under An Employment Contract In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Consolidated Text, Journal Of Laws Of 2023, Item 1465), Regardless Of Whether The Work Will Be Performed By W., Dow. Or Further Double (So-Called Manual Workers). This Requirement Does Not Apply To Persons: Construction Managers, Providers Of Transport Services, Suppliers Of Construction Materials, Equipment, Devices, Natural Persons Running A Business, Incumbent Members Of Management Bodies. Or Supervisory Functions Of The Contractor, Partners Of A General Partnership Or Partnership To The Extent To Which They Will Personally Perform Works For Z. Or W.. Requirements Regarding The Method Of Documenting The Employment Of Persons Under An Employment Contract, Z.S Control Rights And Sanctions For Not Employing Persons Under A Contract Were Lucky To Get A Job. Round In Ppu Constituting Annex No. 4 To Swz.10. The Order Will Be Co-Financed By The Provincial Fund For Environmental Protection In Katowice.11. The Subject Of The Order Will Be Available To Persons With Disabilities In Accordance With Art. 100 Paragraph 1 Of The Public Procurement Law. Access To The Building For Disabled People. Is Enabled. The Entrance Door Will Be Located Up To 2 Cm Above The Level. Adjacent Area. The Social And Office Facilities Constitute An Integral Part Of The Plant And Are Functionally Related To It. In The Social Part - A Cloakroom For Women And Disabled People. Washbasin. Steel Handrails For Disabled People Will Also Be Installed In The Toilet. (...)Due To For The Garden Number Of Characters, Other Information In Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
680e0969-6627-46dc-81d9-9ecb6cee8e4b.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)