Works For Complete Or Part Construction And Civil Engineering Work - Development Of Tatab nya Xiv/A Water Well. In The Framework Of The Business Contract, It Is Called Development Of The Tatab nya Xiv/A Water Mine. Fidic S rga Is Responsible For The Full Range Of Project Planning And Execution Tasks According To The Terms Of The Book. The Client Of The Subject Contract Is The North Danube Water Works A Private Limited Company. Tasks To Be Performed By The Successful Tenderer And A Summary Description Of The Indicative Quantities: The Tatab nya-Oroszl ny Regional Water Supply System, As Well As The Bicske Regional Waterworks System And The City Of Tatab nya The Safety And Economy Of Water Procurement And Supply Are Basically Those Of The Two Tatab nyas Water Well, It Is Determined By The Operation Of Water Wells Marked Xiv/A And Xv/C. The Water Mines Originally They Were Established For The Active Dewatering Of Coal Mines, But Today They Only Serve Water Supply Needs They Serve. The Water Wells - Despite The Minor Renovation Works Carried Out In The Meantime Also They Represented The Technical Level Of The Period Of Their Commissioning (1965, 1970). The Based On Forecasted Medium-Term And Long-Term Water Demands, The Current, Its Capacity Of About 45-50 Em3/D Must Be Increased To 75 Em3/D, Which Enables Ensures The Safe Drinking Water Supply Of The Tatab nya-Oroszl ny-Tata Area. This Project Aims To Develop The Xiv/A Shaft And Establish A Surface Storage Facility With A Pressure Booster By Implementing The Following Facility Elements: Mining Works: Daily Extraction 75,000 M3 Mining Engineering Works: Development Of Transport In Suspended Mines And 1,370 Fm Drinking Water Pipeline Construction With Diameter Dn300-Dn500. Mechanical Engineering-Piping: Construction Of 1797 Fm Of Horizontal Lines In Mining Areas And Clean Water, Or Leachate Pump Installations Electrical And Control Engineering Works: Energy Supply Necessary For Increased Production, Communications And Control Technical Tasks Xiv/A Of The Surface Facilities Of The Water Center Renovation: Renovation Of The Existing 2X1,000 And 2X5,000 M3 Drinking Water Storage Tanks, The Existing Pump House (Pump Station) And Renovation/Improvement Of The Yard Lines The Task Construction Of A Pressure Boosting Structure With A Suction Basin: The Highest Of Tatab nya Industrial Park Area Of 2*2,000 M3 Pool And Pump House (Pump Station) (1,200 M3/H) Construction: - Connection Of Pumps On The Suction Side To The Pipeline Of The 2*2000 M3 Pool Related To; - 3 Pumps To Be Installed, 1 Of Which Is A Hot Reserve; - The Pumps Be Suitable For Frequency-Controlled Operation; - The Two Operating Pumps Together Q= Be Able To Transport 1200 M3/H Of Water; Chlorinator For Disinfecting Drinking Water System Development Everything Under Tender Pump House / Pumping Station Means A Structure In Which Pumps And The Service Equipment Connected To Them (Control Technology, Chemical Dosing, Etc.) Are Placed. The Investment Is Ongoing Must Be Implemented While Ensuring Operation. It Is The Responsibility Of The Winning Bidder The Water Rights Licensee For The Technical Content That Is Part Of The Public Procurement Documents And Preparation Of Construction Plans With The Appropriate Content Of 191/2009.(Ix.15.) Cr. The Winner The Tenderer Bears Full Responsibility For The Documents He Prepares And For The Correctness Of What Is Included In The Plans And In The Relevant Standards And Legislation And For Compliance With Other Regulations. 321/2015. (X.30.) Article 46 (3) Of The Cr. On The Basis Of The Provisions, For Things Of Specific Manufacture Or Origin, Or For A Specific Procedure, Which Is The Products Of A Given Economic Operator Or The Services Provided By It Characterized, Or Trademark, Patent, Activity, Person, Type Or Given In Case Of Reference To Origin Or Production Process, In Addition To The Reference A Or Equivalent Shall Also Be Understood. Proof Of Equivalence Bidders Task. The Detailed Public Procurement Technical Description And Contractual Terms And Conditions Of The Additional Public Procurement Documents Are Included In The Invitation. Bidder Calls The Attention That It Is Aimed At Support Or Modification Of The Support Contract Request, Or A Request/Submission For The Provision Of Other Budgetary (Domestic) Resources Will Submit/Submitted, Therefore For Support / Other Budgetary (Domestic) Resources Non-Acceptance Of A Request To Make It Available, Or Less Than Requested In The Amount, Or Acceptance That Is Not In Accordance With The Performance Deadline According To This Invitation, Or, If Relevant, Amending The Support Agreement (Tsz) Or Notification Of Changes Its Non-Acceptance Shall Be Considered As A Circumstance For Which The Contract Is Subject To The Tenderer Can Be Cited As The Reason For Its Inability To Conclude Or Perform. Pursuant To The Above Tenderer Is The Kbt. Section 53 (5)-(6) And The Civil Code. 6:116. Calls On The Basis Of Paragraph (1) Of The Attention That The Procedure Can Be Declared Ineffective Even If The Present A Contractual Agreement Concluded As A Result Of A Public Procurement Procedure Is Financial Cover, Providing A Physical Completion Date Corresponding To The Performance Deadline The Tsz Will Not Be Concluded, Or - If Relevant - The Tsz Will Not Be Amended For Signature Or The Notification Of Change Will Not Be Accepted Or The Other Budget (Domestic) Funds Are Not Insured And The Financial Cover Cannot Be Used. The Tenderer Accepts The Conditions Indicated Above As A Result Of This Public Procurement Procedure As A Condition Precedent To The Entry Into Force Of The Contractual Agreement To Be Concluded Binds If The Condition Is 180 Days After Signing The Contractual Agreement Does Not Occur Within, Then The Contractual Agreement Is All Further Legal Acts Ceases Without
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.