Works For Complete Or Part Construction And Civil Engineering Work - Development Of Tatab nya Xv/C Water Well. Within The Scope Of The Business Contract, It Is Called Development Of The Tatab nya Xv/C Water Well. Fidic S rga Is Responsible For The Full Range Of Project Planning And Execution Tasks According To The Terms Of The Book. The Client Of The Subject Contract Is The North Danube Water Works A Private Limited Company. Tasks To Be Performed By The Successful Tenderer And The Summary Description Of The Indicative Quantities: The 2013-2015. Happened In Years Technological And Hydromechanical, Mine Mechanical Renovation Of The Xv/C Water Shaft, To Safety Placement. In The Framework Of The Project, The Output Of Water Extraction From The Water Well Is 30,000 M3/D, And A 1/3 Partial Flow Of The Water Extracted From The Water Well Was Realized Treatment, De-Ironing. The Other Limiting Factor Is The Development Of Water Quality Conditions, Presumed Deterioration Of Water Quality. For This Reason, The Entire Amount Of Extracted Water Becomes Necessary Treatment, The Currently Nominally 10,000 M3/D De-Ironing Capacity Will Be Increased To 20,000 M3/D Capacity Must Be Expanded. This Tender Includes The Following Developments: Expansion Of The Current Ironworks Building By ~ 260 M2, The Water Treatment, Ironworks Technology Development With A Capacity Of 20,000 M3/D, New Clean Water Storage Pool (2 X 3000 M3) With The Connected Lock Chamber And Chlorinator, New Waste Water Settler For For The Treatment Of Excess Technological Waste Water (200 M3), The Connections Of The New Facilities Solving Courtyard Wiring System (259 Fm). Ensuring Continuous Operation Of The Investment Must Be Implemented In Addition To The Public Procurement Documents Are The Responsibility Of The Winning Bidder For The Technical Content That Is Part Of It, The Preparation Of The Water Rights Permit And Construction Plans 191/2009.(Ix.15.) Cr. With The Corresponding Content. The Winning Bidder Bears Full Responsibility Is Responsible For The Correctness Of The Contents Of The Documents And Plans Prepared By Him And For Compliance With The Provisions Of The Relevant Standards, Legislation And Other Regulations. 321/2015. (X.30.) Article 46 (3) Of The Cr. Based On The Specified Make Or To A Thing Of Origin, Or For A Specific Procedure That Involves The Products Of A Given Economic Operator Or Characterizes The Services It Provides, Or A Trademark, Patent, Activity, Reference To A Person, Type Or A Particular Origin Or Manufacturing Process In Addition To The Reference, The Term Or Equivalent Must Also Be Understood. Proof Of Equivalence Is The Responsibility Of Bidders. The Detailed Public Procurement Technical Public Procurement Documents Supplementing The Call For A Description And Contractual Conditions Contain. The Tenderer Draws Attention To Support Or Support A Request To Amend A Contract, Or Other Budgetary (Domestic) Resources Are Available Will Submit/Has Submitted An Application/Presentation For Forgiveness, Therefore For Support / Request For The Provision Of Other Budgetary (Domestic) Resources Non-Acceptance, Or In An Amount Smaller Than Requested, Or Not In Accordance With This Invitation Acceptance According To The Completion Deadline Or, If Relevant, The Support Modification Of The Contract (Tsz) Or Non-Acceptance Of A Change Notification As A Circumstance Should Be Considered, Which Would Render The Bidder Unable To Conclude Or Fulfill The Contract Can Be Cited As The Reason For His Divorce. Pursuant To The Above, The Bidder Is The Kbt. 53, Paragraphs (5)-(6). And The Civil Code 6:116. On The Basis Of Paragraph (1) Of , Attention Is Drawn To The Fact That The Procedure Can Declare It Ineffective Even If As A Result Of This Public Procurement Procedure The Financial Cover Of The Contractual Agreement To Be Concluded, The Deadline For Completion A Tsz Ensuring An Appropriate Physical Completion Date Is Not Concluded, Or - If Relevant - The Tsz Amendment Will Not Be Signed Or The Change Notification Will Not Be Accepted Or The Other Budget (Domestic) Source Will Not Be Secured And The Financial Cover Does Not Become Usable. Bidder The Conditions Indicated Above The Contractual Agreement To Be Concluded As A Result Of This Public Procurement Procedure Enters Into Force Imposes It As A Condition Precedent To His Move. If The Condition Is Contractual Does Not Occur Within 180 Days After The Signing Of The Agreement, Then The Contractual Agreement Is Terminated Without Any Further Legal Action.