1. Execution Of Construction Works For The Investment Project Titled A Dynamic Playground In The Eco Zone In Skierniewice. The Order Includes The Execution Of Construction Works In Accordance With The Design Documentation Constituting Annex No. 6 To The Swz And The Bill Of Quantities Constituting Annex No. 7 To The Swz And The Price List Constituting Annex No. 8 To The Swz. The Planned Investment Includes: - Equipping The Facility With Play Equipment: A Rope, A Zip Line, A Roller , Ladder, Balance Beam, - Equipping The Facility With Small Architecture Elements: A Bench With A Backrest, A Waste Bin, Playground Regulations, - Making Thermoplastic Field Games On Concrete Cubes: Class Game, Twister Game, - Making A Pedestrian Gate In The Existing Metal Fence, From The Side Of Al. Niepodleg o ci, - Hardening Of The Area And A Path Made Of Phaseless Concrete Cubes, - Construction Of A Sand Surface In The Designated Safety Zone Of The Designed Devices, - Construction Of Lawn Turf, - Construction Of Lighting. All Work Should Be Performed Based On The Attached Design Documentation, In Accordance With The Principles Of Construction Practice And All Applicable Standards. The Detailed Scope Of Works For This Task Is Determined By The Bill Of Quantities, Price List And Design Documentation. When Performing Works, Decisions, Conditions, Arrangements And Opinions Regarding The Developed Design Documentation Should Also Be Taken Into Account. If The Scope Of Works Is Not Clearly Specified In The Construction/Detailed Design, The Elements Included In The Bill Of Quantities Should Be Used. The Contractor Is Also Responsible For Obtaining An Occupancy Permit On Behalf Of The Ordering Party Or Submitting An Effective Notification Of The Completion Of The Works And The Intention To Commence Use, Together With The Preparation Of An As-Built Geodetic Inventory (If Required In Accordance With Applicable Regulations). Note:1) Wherever The Subject Of The Order Is Described By Indicating Trademarks, Patents Or Origin, The Ordering Party Allows The Contractor To Use Solutions Equivalent To Those Described In The Documentation, Provided That They Have At Least The Same Or Better Parameters Technical And Functional And Will Not Lower The Standards Specified In The Documentation.2) If The Contractor Proposes Materials And Other Equivalent Elements, He Is Obliged To Prepare And Attach To The Offer A List Of All Proposed Materials And Other Equivalent Elements And Demonstrate Their Equivalence In Relation To The Materials And Other Elements Described In The Documentation Constituting The Description Of The Subject Of The Order, Stwior, Indicating The Name, Page And Item Of The Bill Of Quantities To Which It Applies.3) All Equivalent Materials Or Other Elements Proposed By The Contractor Must: A) Have Technical And Functional Parameters Not Worse Than Those Specified In The Documentation ,B) Have Appropriate Approvals And Certificates.4) A Description Of The Proposed Equivalent Solutions Should Be Attached To The Offer And Must Be Detailed Enough To Enable The Ordering Party, When Assessing The Offer, To Assess The Fulfillment Of The Requirements Regarding Their Technical Parameters And Decide Whether The Proposed Solutions Are Equivalent. This Means That The Contractor Is Obliged To Indicate That The Materials And Other Elements Offered By Him Are Equivalent To Those Described By The Ordering Party.2. Scope Of Works The Basic Scope Also Includes: - Final Acceptance, Fees For Utilities, Including: Water, Electricity For The Duration Of Construction. Fees For Utility Consumption, In The Case Of Invoices Issued By The Ordering Party, Will Be Settled Within 14 Days From The Date Of Invoice Issuance. - Preparation Of As-Built Documentation And As-Built Geodetic Inventory In 2 Copies; - Obtaining An As-Built Certificate For The Facility Issued By An Appropriate Entity, E.G. The Institute Of Technical Supervision.3. Requirements Related To The Implementation Of The Order In Terms Of Employment By The Contractor Or Subcontractor On The Basis Of An Employment Relationship Of Persons Performing The Activities Specified By The Ordering Party In The Scope Of The Implementation Of The Order, If The Performance Of These Activities Involves Performing Work In The Manner Specified In Art. 22 1 Of The Act Of June 26, 1974 - Labor Code (Consolidated Text: Journal Of Laws Of 2023, Item 1465) Covers The Following Types Of Activities: 1) Earthworks 2) Land Development Works4. Detailed Requirements Regarding The Implementation And Enforcement Of The Employment Requirement Based On An Employment Relationship Are Specified In The Contract Template Constituting Annex No. 5 To The Swz.