Asia-Pacific Economic Cooperation, APEC,G20,APAC ( Asia Pacific)
21-12-2023
Work Detail
Rfq-47.1Pdp3 Structural Steel Upgrades (Stage 2) . The Place De Portage Iii Facility Was Built In The 1970&Rsquo;S And Will Be Rehabilitated Into A Modern Complex To Update And Modernize The Base Building Services. It Consists Of Nine (9) Towers Varying From 3 To 18 Floors, Which Includes A Connecting 3-Storey Bridge Over Maisonneuve Boulevard.The Anticipated Scope Of Work Includes, But Is Not Limited To, The Following:Supply And Installation Of Various Structural Steel Elements Such As Beams, Columns, Metal Decking, Flat Plates, Hss, Bent Plates, And Channels. This Work Also Includes The Designing Of Connection Details.Stage 1 Base Building Includes Towers B3, B1, C1, C2, D And Is Currently Ongoing. Stage 2 Includes Towers A1, A2, B2, E.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.