GTR 73372538

Tenders Are Invited For Selection Of The Contractor For Construction Works Related To The Implementation Of The Investment Task Entitled: Adaptation And Modernization Of The Badenich Manor In Wadowo

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
73372538
Tendering Authority
Subscribe to view
Tender No
NP.26.2.100.23.BM
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Selection Of The Contractor For Construction Works Related To The Implementation Of The Investment Task Entitled: Adaptation And Modernization Of The Badenich Manor In Wadowo
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
15-12-2023 Closed
Work Detail
1. Selection Of A Contractor For Construction Works Related To The Implementation Of The Investment Task Entitled: Adaptation And Modernization Of The Badenich Manor In Wadowo, For The Municipal Greenery Board In Krakow. 1.1 Pursuant To Art. 310 Of The Public Procurement Act, The Ordering Party Provides For The Possibility Of Invalidating The Procedure In Question If The Public Funds That The Ordering Party Intended To Use To Finance All Or Part Of The Order Were Not Granted To It.1.2 The Subject Of The Proceedings And The Order Is An Investment Related To The Implementation Of The Task Zzm/K1.1/20 Adaptation And Modernization Of Badenich Manor, Estate Wadów, Including Construction Works Related To The Adaptation Of An Existing Building For Public Utility Purposes, Reconstruction, Renovation And Reconstruction Of Internal Installations Of The Badenich Manor In Wadów At Ul. Glinik 63 In Krakow, Including Land Development, Construction And Reconstruction Of Technical Infrastructure For Plot No. 118/1, 118/2, 118/3 Rev. Nh-16, Pos. Nowa Huta Based On The Attached Design Documentation And Decisions : Pnb Decision Of November 15, 2022. Mark: Au-01-3.6740.2.540.2022.Dsz For The Investment Titled: Adaptation For Public Utility Purposes, Reconstruction, Renovation And Reconstruction Of Internal Installations (Electricity, Low-Current, Mechanical Ventilation And Air Conditioning, Sanitary Sewage, Water Supply, Central Heating, Rain, Lightning Protection) Of Dwór Badenich In Wadów At Ul. Glinik 63 In Kraków, Including Land Development, Construction And Reconstruction Of Technical Infrastructure (Outside The Building: Electrical And Lighting Installations, Telecommunications, Sanitary And Storm Sewage Systems, Monitoring; Reconstruction Of Connections: Water Supply, Sanitary Sewage System, Gas Connections) For Plot No. 118/1, 118/2, 118/3 Rpm Nh-16, As Seen Nowa Huta. Permit No. 457/22 Of May 24, 2022 And The Decision Of Mkz To Carry Out Conservation Works In The Building Of The Former Badeni Manor Located At Ul. Glinik 63 In Kraków, Entered Into The Register Of Monuments Under No. A-1098 By Decision Of December 21, 1998. In Accordance With The Conservation Work Program Developed By Olga Borcz-Woźniak, Ma In 2021 And Permit No. 872/22 Of September 9, 2022. Mkz To Carry Out Conservation Works In The Building Of The Former Badeni Manor Located At Ul. Glinik 63 In Krakow In Connection With The Investment Entitled: Adaptation For Public Utility Purposes, Reconstruction, Renovation And Change Of Use Of The Historic Badeni Manor In Wadowo At Ul. Glinik 63 In Kraków, Including Land Development, Construction And Reconstruction Of Technical Infrastructure, Plot No. 118/1, 118/2, 118/3 Rev. Nh-16, Registered Register Nowa Huta”, Including The Necessary Formal And Legal Documents. The Design Documentation Was Developed By The Design Unit Of Saneccy Sp. Z O. O. And Jerzy Wowczak Authors Design Studio (M.A. Eng. Arch. Marek Sanecki Mpoia/044/2016, Dr. Eng. Arch. Jerzy Wowczak G.P.U. 451/90).1.3 As Part Of The Order, The Basic Scope And Any Scope Covered By The Option Law Must Be Performed In Full. Or Parts, Entitled To The Ordering Party. 1.4 The Basic Scope Of The Order Includes, Among Others, Sectional Underpinning Of The Existing Foundations Of The Building, Deepening The Floor Level Of The Underground Part In Relation To The Existing One By Making A Reinforced Concrete Floor Slab. 30 Cm, Monolithically Connected To The Wall Reinforcement Structure. It Is Allowed To Replace The Technology, E.G. With Jet-Grouting. The Reinforced Concrete Slab Should Be Made Using Tbw Technology On 2 Layers Of Thermally Weldable Felt. In Addition, The Basic Scope Includes Waterproofing And Thermal Insulation Of Foundations, Demolition Of Partition Walls, Removal Of Internal Plasters, Drying Of Walls And Impregnation, Dismantling Of Floors And Wall Cladding, Dismantling Of Old Installations, Removal And Disposal Of Rubble And Demolition Elements. 1.5 Within The Scope Of Option 1, The Order Covers The Performance Of Other Disassembly And Demolition Works (I.E. Disassembly Of Trusses, Fittings, Gutters, Etc. Disassembly Of The Ceiling) And Construction Works, I.E. Min. Planned Demolitions, Drilling And Reinforcements In Load-Bearing Walls, Masonry Works, Construction Of A Reinforced Concrete Ceiling Above The Ground Floor, Grooving Of Walls To Support The Rings Of Monolithic Reinforced Concrete Ceilings, Replacement Of Existing Internal Stairs, Construction Of Newly Designed Monolithic Internal Reinforced Concrete Stairs, Replacement Of The Roof Truss, Execution Of Planned Demolitions And Renovation Of Existing External Stairs, Construction Of Newly Designed Stairs And An External Ramp, Construction Of An Elevator Shaft With The Delivery And Installation Of A Lifting Device, Construction Of Steel Structures. 1.6 Within The Scope Of Option 2, The Order Includes Construction Works In The Field Of Construction Of Partition Walls, Screeds And Internal Plasters, Roof Insulation , Construction Of Facades, External Windows And Doors, And Sanitary Installations (Water Supply, Sewage, Central Heating, Gas, Air Conditioning, Ventilation, Sanitary Sewage Installation And Connection, Rainwater Drainage, Water Connection), Internal And External Electrical Installations, Low-Current Installations ( Installation Of The Ssp Fire Alarm System And Telecommunications Equipment, Call Installation In Disabled Toilets, Cable Ducting To The Building, Structured Cabling Installation, Cctv Installation, Rtv, Av Installation And Telecommunications Equipment. 1.7 In The Scope Of Option 3, The Order Includes The Execution Of Finishing Works Outside And Inside The Building, I.E. Delivery And Installation Of Internal Door Joinery, Painting And Finishing Of Wall Coverings, Finishing Of Floors And Ceilings, Installation Of Lighting Fixtures, Steel Joinery, Delivery And Installation Of Equipment In Accordance With The Design Documentation (I.E. Among Others Mobile-Folding Wall, Curtain, Waste Bins, Soap Dispenser, Etc.).1.8 After Completing The Construction Works, The Contractor Is Obliged To Complete All Acceptance Documents And Submit, On Behalf Of The Ordering Party, A Notification On The Completion Of Construction Works To The District Construction Supervision Inspectorate In Krakow And Obtaining No Objection To The Use Of The Facility In Question In Accordance With The Obtained Pnb Decisions, Respectively, In The Basic Scope And In The Scope Covered By Option Rights.1.9 The Ordering Party Reserves The Right To Exercise The Option Right, In Whole Or In Part, Specified, Among Others, In Art. 441 Of The Public Procurement Law, As Described In Swz.1.10 The Works Should Be Carried Out In Accordance With The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works (Abbreviated As Stwiorb) And In Accordance With The Attached Graphic Attachments.1.11 An Integral Part Of Swz Necessary For The Execution Of The Subject Of The Order Are Materials Attached To The Swz, In Particular The Design Documentation With Arrangements, Stwiorb, Bills Of Quantities (They Have Not Been Divided Into The Basic Scope, The Scope Covered By Option 1, Option 2 And Option 3, The Contractor Must Include The Division Into The Above-Mentioned Stages In The Detailed Cost Estimate), Tables Of Elements Manufactured And Liquidated, Templates Of Material Approval Cards, Templates Of Subcontracting Declarations, Templates Of Protocols, Guidelines, Equivalence Table And Others Constituting Annex No. 9 To The Swz (1 File In Zip Format). The Ordering Party Emphasizes That It Has The Right To Update The Designs During The Procedure And During The Construction Period. 1.12 The Ordering Party Notes That The Attached Bills Of Quantities Are Only Indicative And Auxiliary, And The Basis For Preparing The Offer, Determining The Scope And Calculating The Lump Sum Price, And Then Settling The Contract Is Design Documentation And Stwiorb. The Bills Of Quantities Have Not Been Divided Into The Basic Scope, The Scope Covered By Option 1, Option 2 And Option 3, The Contractor Must Include In The Detailed Cost Estimate The Division Into The Above-Mentioned. Stages.1.13 A Detailed Description Of The Subject Is Presented In Point 5) 7 Of The Swz And Annex No. 9 To The Swz.2. The Contractor Should Complete And Sign The Offer Form With Attachments Or Submit An Offer Corresponding To Their Content, Using A Qualified Electronic Signature, Trusted Signature Or Personal Signature And Post It Using The E-Procurement Platform, Available On The Website Http://Ezamowienia.Gov.Pl .3. The Contractor Must Attach To The Offer All Documents, Declarations And Attachments Presented In The Swz Signed Using A Qualified Electronic Signature, Trusted Signature Or Personal Signature.4. The Terms And Conditions Of The Contract Are Included In The Draft Provisions Of The Contract Included In The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e9ec5457-71f1-4cf8-b329-04e8ccad8566.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders