Tenders Are Invited For Preparation Of An Executive Design Together With A Cost Estimate For The Task Titled: Construction Of A Fan Station Located In The Excavation At Poz. 80M In The Workings Of The Main Key Heritage Adit (....)

Tender Detail

73372135
ZP/55/MGW/2023
Self-Funded
Tenders Are Invited For Preparation Of An Executive Design Together With A Cost Estimate For The Task Titled: Construction Of A Fan Station Located In The Excavation At Poz. 80M In The Workings Of The Main Key Heritage Adit (....)
NCB
Central Europe
European Union
12-12-2023

Work Detail

I. The Subject Of The Order Includes The Development Of An Executive Design Together With A Cost Estimate For The Task Called: Construction Of A Fan Station Located In A Trench At The 80M Level In The Underground Workings Of The Main Key Heritage Adit In The Coal Mining Museum In Zabrze. Mgw In Zabrze, In The Area Of Sztolnia Kr lowa Luiza, Plans To Launch A Fan Station, Which Will Be Located In A Recess In The Ditch At Pos. 80M. A Large-Diameter Hole With A Diameter Of 800 Mm With An Embedded Steel Pipe Is Led Into This Cavity From The Surface. The Ventilation Concept Provides For Fans Installed On Pos. 80M Will Provide Forcing Ventilation (Air Discharge To The Surface) And Will Be Intended Mainly For Airing The Trench At Level 80M. The Fan Station Should Be Equipped With Two Low-Depression Wle-800 Duct Fans With Standard Silencers With Attenuation Efficiency Of Approximately 25 Db To Ensure The Permissible Noise Level On The Surface Is Up To 50 Db During The Day And Up To 45 Db At Night. Due To Ventilation Conditions, The Switching, Power Supply And Control Equipment Should Be Located In The Primary Gallery In Seam 510 In The Area Of The Wilhelmina Shaft Pit. Synoptic Boards Operating In The Control And Visualization System Of The Above Station Should Be Installed In The Area Where The Above-Mentioned Fans Are Located At Level 80, At Level 40 M In The Area Of The Shaft Of The Wilhelmina Shaft And In The Plant Control Room In The Management Building At 2 Georgiusa Agricoli Street. Ventilation Opening On The Surface It Must Be Equipped With A Diffuser Building With An Acoustic Silencer. Taking Into Account All Ventilation Conditions And Fan Parameters, As Part Of This Task, The Selection Of The Acoustic Silencer Should Be Verified. The Final Decision About Selecting The Optimal Solution Should Be Made During Design. The Stations Control System Should Provide For Automatic Control That Automatically Switches To The Reserve Fan In The Event Of An Emergency Shutdown Of The Operating Fan, As Well As Manual Control: - Local: From The Position At The Fan, From The Power Supply Point - In The Area Of The Shaft Of The Wilhelmina Shaft, - Remote: From Traffic Dispatchers Station In The Plants Control Room. The Work System Should Be Equipped With A System For Visualizing The Work And Parameters Of The Fans, With A Display Of The Stations Operating Status In The Control Room, In The Fan Bay And In The Place Where The Power Supply And Control Equipment Is Installed (The Area Of The Shaft Of The Wilhelmina Shaft). The Power Supply System For The Fan Station And Devices Installed On Pos. 80M Was Proposed In General Outline In The Detailed Design Of Power Supply For Devices In The Trench At Level 80M, Constituting Annex No. 6 To The Swz. The Ordering Party Has Some Of The Equipment Indicated In The Project. Therefore, At The Design Stage, The Assumptions For The Developed Project Should Be Consulted On An Ongoing Basis With Authorized Employees Of The Mgw In Zabrze. Annexes No. 7A And 7B To The Swz Show The Location Of The Fan Station At The 80M Level In The Gksd Workings At The Mgw In Zabrze And The Layout Of The Workings In The Area In Question. . The Scope Of The Task (Project) Will Include: - Design Of The Assembly Stations And Fan Foundations, - Design Of The Duct Connection System Between The Fans And The Discharge To The Ventilation Opening (The System Should Enable Automatic Switching Of The Fans And Capacity Regulation), - Design Of The Method Of Mounting The Fans And Station Equipment, - Analysis And Design Of The Electrical Installation For Powering The Fan Station - Annex No. 6 To The Swz Is The Starting Concept For Developing The Appropriate Project, - Design Of Systems, Apparatus And Control Installations, Security And Visualization, - Cost Estimate And Technical Specification Of The Solutions Used. Ready The Project Should Be Delivered To The Ordering Partys Office In Three Copies In A Printed Version And In An Electronic Version Saved In Generally Accepted Formats (Pdf, Editable Version In Ms Office, Autocad Format). Ii. Guarantee And Warranty1.The Contractor Provides The Ordering Party With A Warranty For The Subject Of This Contract For A Period Of 36 Months.2. The Contractor Is Obliged To Be Liable To The Ordering Party Under The Warranty For Defects In The Subject Of The Contract For A Period Equal To The Period Of Granting The Guarantee To The Ordering Party.3. The Warranty And Guarantee Periods Start From The Date Of The Official Receipt Of The Entire Subject Of The Order.4. The Contractor Is Obliged To Remove Free Of Charge Any Defects In The Subject Of The Order Revealed After Acceptance During The Warranty Or Guarantee Period, Upon The First Written Request From The Ordering Party.5. The Deadline Set By The Ordering Party For Removing Defects Cannot Be Shorter Than 3 Days.6. In The Event Of Failure To Remove Defects Within The Prescribed Period Or Defective Removal Of Defects, The Ordering Party May Remove The Defect By Means Of Substitute Performance At The Expense And Risk Of The Contractor. Iii. Authors Supervisionensuring, Throughout The Entire Period Of Construction Works, Authors Supervision In All Industries, In Accordance With The Principles Specified In Art. 20 Section 1 Point 4 Of The Act Of July 7, 1994 - Construction Law. Iv. Equivalent Solutions1. The Contractor Is Obliged To Prepare Design Documentation In Accordance With Art. 99 Section 4-6 Of The Pzp.2 Act. If The Contractor Provides For The Possibility Of Using Equivalent Solutions In The Design Documentation, He Will Be Obliged, In Order To Evaluate Them, To Participate In The Work Of The Tender Committee In The Procedure For Construction Works Carried Out On Its Basis.3. The Contractor Describes The Criteria For The Equivalence Of Materials And Devices In The Design Documentation, Providing The Necessary Minimum Number Of Technical Parameters Used To Compare The Materials And Devices Indicated By The Contractor As Equivalent - In Accordance With Annex No. 2 To The Proposed Provisions Of The Contract.4. If A Trademark, Patent Or Origin Is Indicated In The Technical Documentation Prepared By The Contractor, The Contractor Is Obliged To Obtain The Consent Of The Ordering Party Before Determining Detailed Equivalence Criteria. In This Respect, The Designer Submits To The Ordering Party A Written Request For Consent To The Need To Use Proper Names With Justification For The Impossibility Of Any Other Description Of The Subject Of The Order, E.G. Parameters - The Template Is Attached As Annex 1 To The Draft Provisions Of The Contract.5. In The Event Of Obtaining The Consent Referred To In Point 4. The Contractor Is Obliged To Specify The Minimum Necessary Number Of Parameters That Will Enable The Acceptance Of Goods And Devices From Other Manufacturers As Equivalent. The Criteria Are Intended To Enable The Ordering Party To Evaluate, At The Stage Of Examination And Evaluation Of Offers, Products Proposed By The Contractor Equivalent To Those With The Participation Of The Contractor.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail