Asia-Pacific Economic Cooperation, APEC,BRIC,G20,APAC ( Asia Pacific)
22-12-2023
Work Detail
Project Name: Cixi City Construction Waste Resource Disposal Center Sewage Pipeline Supporting Project Pump Station Part Project Tenders Are Invited For The Construction Site Of The Project Is Located In Xinpu Town. After The Sewage Is Collected, It Is Lifted By An Integrated Pump Station. The Sewage Is Discharged Through Pressure Drainage Pipes Along The Semi Excavated Pudong Straight Road To The East Of The Planned Shougeng West Road, Then Along The Planned Shougeng West Road And The Current Shougeng West Road To The East, Along The Xujiapu East Bank Road To The South, And Then Along Zhengxu Road To The 2 # Sewage Lifting Pump Station (Under Construction) Regulating Pool. This Project Will Build An Integrated Lifting Pump Station With A Scale Of 2000M3/D And A Design Flow Rate Of 192M3/H. Products List: 1: Integrated Sewage Lifting Pump Station Place Of Implementation: Zhejiang China Beginning Of Selling Bidding Documents: 2023-12-01 Ending Of Selling Bidding Documents: 2023-12-08 Price Of Bidding Documents: 500/$80 Deadline For Submitting Bids/Time Of Bid Opening (Beijing Time): 2023-12-22 09:00 Tender Link : Https://Www.Chinabidding.Com/En/Detail/258555062-Bidnoticeen.Html
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.