Tenders Are Invited For Construction Of Home Sewage Treatment Plants In The Parady Commune As Part Of The Task Improvement Of Water And Sewage Management In The Parady Commune

Tender Detail

73316016
ZP.271.12.2023
Self-Funded
Tenders Are Invited For Construction Of Home Sewage Treatment Plants In The Parady Commune As Part Of The Task Improvement Of Water And Sewage Management In The Parady Commune
NCB
Central Europe
European Union
15-12-2023

Work Detail

Locationbogus awy, Feliks w, Honorat w, Kolonia Pop awy, Mariampol, Parady Ul. Polna, Stawowice Kolonia, Stawowiczki, W jcinthe Subject Of The Order Will Be Implemented In The Parady Commune In The Amount Of 21 Pieces. The Investment Is Being Implemented In The Design And Build System. As Part Of The Subject Of The Order, It Is Planned To Implement: - 19 Home Sewage Treatment Plants With A Minimum Capacity Of 0.75 M3/D - For 1-5 People; - 2 Home Sewage Treatment Plants With A Minimum Capacity Of 1.30 M3 /D - For 6-10 People. The Scope Of Works Includes The Design And Construction Of A Biological Sewage Treatment Plant With Connection To The Sanitary Sewage System From The Building, Discharge Of Treated Sewage, Electrical Power Supply, Technical And Technological Commissioning. The Construction Of The Sewage Treatment Plant Should Be Carried Out Under The Supervision Of An Authorized Installer Of The Manufacturer And In Accordance With The Technical Guidelines Of The Device Manufacturer. All Works Should Be Carried Out In Accordance With Construction Practice And Technical Conditions For The Execution And Acceptance Of Construction And Assembly Works Of Sanitary And Industrial Installations. The Contractor Is Obliged To Design, Obtain All Necessary Consents, Construct And Equip In Accordance With This Fup, Taking Into Account The Planned Purpose And Function Of The Project, In Accordance With The Requirements Of Generally Applicable Law (Including Local Law), Standards And Technical Knowledge And Construction Practice. The Contractor Will Be Obliged To Obtain The Necessary Opinions, Arrangements, Technical Conditions, Consents And Decisions. Required Technical Parameters Of The Treatment Plant: - High Reduction Of Pollutants (Up To 94% Bod5 Elimination), - No Need To Install A Primary Settling Tank In Front Of The Treatment Plant, - High Resistance To Unevenness In The Sewage Inflow ,- High Resistance To Changing External Temperatures (Both High And Low) - Which Is Related, Among Other Things, To Good Construction And High Stability Of The Biological Processes Taking Place In The Deposit, - No Need To Have Professional Knowledge And Supervise The Technology Used (Periodic Inspections Once , Twice A Year, Can Be Done By A Person Who Carefully Reads The Operation And Maintenance Manual), - Long Service Life Of The Devices - Treated Sewage Does Not Emit Unpleasant Odors, Is Colorless And Odorless, - No Moving Parts That Would Require Constant Supervision And Control, - When Removing Excessive Sludge, There Is No Need To Add Water And Simultaneously Remove The Sludge With A Slurry Tanker, - Quiet And Unobtrusive Operation Of The Device, - Low Operating Costs During The Year.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail