1. The Subject Of The Order Is The Reconstruction Of Municipal Road No. 010647C Klonowo-Osady From Km 0+000 To Km 1+573, Covering Plots With Registration Numbers 85 And 109 Located Within The Geodetic Area Of Klonowo, Lubiewo Commune.2. The Order Is Co-Financed By Funds From The Government Program Polish Order Fund: Strategic Investment Program.3. The Scope Of Works Includes In Particular: A) Reconstruction Of The Distribution Cable Line, B) Securing The Existing Telecommunications Infrastructure, C) Demolition Of Road Elements, D) Reconstruction Of The Existing Intersection With A District Road, E) Construction Of Existing Individual Exits, F) Execution Of Earthworks, G) Construction Of Roadbeds Along The Entire Length Of The Road And For Other Surfaces, H) Profiling And Compaction Of The Subgrade, I) Construction Of A Foundation Made Of Mechanically Stabilized Crushed Aggregate 0/31.5 Mm, J) Construction Of The Surface Of The Existing Exits From A Mineral And Asphalt Mixture, K) Construction Of The Platform Surface Sidewalk Made Of Concrete Paving Stones,L) Making A Binding Layer Of Asphalt Concrete,M) Making A Road Surface From A Maxi-Grit Mixture (Sma),N) Making Horizontal And Vertical Markings,O) Making Traffic Safety Elements,P) Regulating Existing Water Supply Valves , Sewerage,Q) Execution Of Finishing Works.Technical Parameters: Length: 1.573 Km Design Speed: 40 Km/H, Traffic Category: Kr-1, Road Width: 3.5 M With Widenings On Curves, Road Class: D Note: The Employer Requires The Contractor To Lay The Upper Surface Layer Across The Entire Width Of The Road In One Single Layer - Avoiding Longitudinal And Transverse Seams.4. Designation Of The Subject Of The Contract According To The Common Procurement Vocabulary (Cpv):45 00 00 00 - 7 Construction Works45 11 12 00 - 0 Works In The Field Of Site Preparation For Construction And Earthworks45 11 13 00 - 1 Demolition Works45 23 32 20 - 7 Works In The Field Of Paving Roads45 23 31 00 - 0 Works In The Field Of Construction Of Highways, Roads45 23 32 53 - 7 Works In The Field Of Paving Roads For Pedestrians45 11 27 10 - 5 Works In The Field Of Shaping Green Areas77 21 14 00 - 6 Tree Cutting Services45 23 32 90 - 8 Installation Road Signs45 23 32 92 - 2 Installation Of Protective Devices45 31 61 10 - 9 Installation Of Road Lighting Devices45 23 23 10 - 8 Construction Works On Telephone Lines5. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Approved By The Notification Of Construction Works Constituting Annexes No. 8 And 9 To The Swz, The Technical Specification For The Execution And Acceptance Of Works Constituting Annex No. 10 To The Swz, The Bill Of Quantities Constituting Annex No. 11 To The Swz And The Design Of Permanent Traffic Organization Constituting Annex No. 12 To Swz.6. The Contractor, Without Additional Remuneration, Undertakes To: A) All Preparatory Works, Including Cleaning Works, Organization And Maintenance Of The Construction Site, Supply Of Necessary Utilities For The Implementation Of The Subject Of The Contract, Including: Electricity, Water, Etc. And Bearing The Costs Of Their Consumption, B) Marking And Securing The Construction Site, C) In The Case Of Felling Trees During The Bird Breeding Season, I.E. From March 1 To August 31, Employing A Specialist Naturalist (Ornithologist) To Confirm That The Habitats Of Protected Species Covered By The Planned Felling Are Not Occupied, D) Incurring All Costs Of Research, Expert Opinions And Opinions Necessary To Assess The Quality Of The Works And The Proper Execution Of The Subject Of The Order, E) Incurring Costs Related To The Acceptance Of Completed Works, F) Incurring The Costs Of Removing Excess Soil, Rubble, Etc., G) Carrying Out Temporary Traffic Management Projects On Time Performing Works Before Entering The Construction Site, H) In The Event Of Damage To Equipment Or Parts Thereof (M. Incl. Water And Sewage Networks, Electricity, Electrical Engineering, Drainage Facilities And Municipal Roads) In The Course Of Implementing The Subject Of The Order - Repairing Them And Restoring Them To Their Original Condition, I) Covering The Costs Of Possible Compensation For Entering The Land And Destroying Crops, J) Covering Possible Dismantling Costs, Installation Or Repair Of Property Fences And Other Damage To Existing Structures And Land Development Elements, K) Covering The Costs Of Restoring Road Surfaces, L) Carrying Out Research, Tests, Etc., As Well As Making Uncovering Works In The Event Of Failure To Report Works That Are Covered Or Disappearing For Acceptance, M) Make Arrangements, Obtain All Opinions Necessary To Perform The Subject Of The Contract And Put It Into Use, N) Ensure And Cover The Costs Of Full Surveying Services, Including Marking Out And Current As-Built Surveying Inventory In Two Copies, O) Ensure Supervision As Well As Appropriate Safety And Security Conditions Occupational Hygiene,P) Keeping The Construction Site Free From Traffic Obstacles And Removing Unnecessary Materials, Waste And Garbage On An Ongoing Basis,Q) Tidying Up The Construction Site After Completion Of The Works And Handing It Over To The Ordering Party No Later Than The Date Of Final Acceptance,R) Keeping A Construction Log,S ) Implementation Of The Bioz Plan - If Applicable, T) Placing 1 Information Board In The Investment Area At The Commencement Of Construction Works On The Source Of Financing From The Government Fund Polish Order: Strategic Investment Program In Accordance With The Regulation Of The Council Of Ministers Of May 7, 2021 In On Determining Information Activities Undertaken By Entities Carrying Out Financial Tasks Or Co-Financed From The State Budget Or From State Earmarked Funds And The Regulation Of The Council Of Ministers Of December 20, 2021 Amending The Regulation On Determining Information Activities Undertaken By Entities Implementing Financial Tasks Or Co-Financed From The State Budget Or From State Earmarked Funds And The Regulation Of The Council Of Ministers Of July 7, 2023 Amending The Regulation On Determining Information Activities Undertaken By Entities Carrying Out Financial Tasks Or Co-Financed From The State Budget Or State Earmarked Funds, In The Place And With The Content Agreed With The Ordering Party. Current Guidelines Regarding Appearance Of Information Boards Are Available At: Https://Www.Bgk.Pl/Polski-Lad/Edycja-Szosta-Pgr/#C281697. The Contractor Undertakes To Carry Out All Works In Accordance With The Principles Of Construction Practice And Technical Knowledge, Applicable Standards And Design Documentation, Contract And Arrangements Made During The Execution Of The Contract.8. The Materials And Devices Used Should Comply With Declarations Of Compliance With Polish Standards, Certificates And Technical Approvals. The Proper Names Provided In This Swz, In The Design Documentation, Bill Of Quantities And Technical Specification For The Execution And Acceptance Of Works (Origin, Manufacturer, Etc.) Are Only Of Auxiliary Nature To Determine The Basic Parameters And Features Of The Materials, Products, Devices And Equipment Used. The Ordering Party Allows The Use Of Equivalent Solutions. An Equivalent Product Is One That Has The Same Functional Features As A Specific Product By Name Or Origin Indicated In The Documentation. Its Quality Cannot Be Worse Than The Quality Specified In The Product Specification And Construction Documentation, And It Should Have Parameters No Worse Than Those Of The Indicated Product. The Contractor Who Refers To Solutions Equivalent To Those Described By The Ordering Party Is Obliged To Demonstrate That The Products He Offers Meet The Requirements Set By The Ordering Party.9. A Simplified Offer Cost Estimate Will Be Required From The Contractor Whose Offer Is Deemed The Most Advantageous And Will Be Submitted By The Contractor No Later Than On The Date Of Conclusion Of The Contract.10. The Attached Bill Of Quantities Constitutes An Auxiliary Element For The Preparation Of A Simplified Offer Cost Estimate.11. The Order Is Covered By The Notification Of Construction Works That Do Not Require A Building Permit, Approved Certificate Number Bd.6743.Lub.32.2022.Ecz Of May 17, 2022.