Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
05-12-2023
Work Detail
Quotation Are Invited For Installation Of Cable Trays And Laying & Termination Of Cables Installation Of Cable Trays 1032304580Rfx Description Installation Of Cable Trays 1 Item-00001 Pr- 1032304580# Installation Of Cable Trays And Laying & Termination Of Cables For Acid Dosing Pumps Skids At Palm J Umeirah- Ro Plant 1.#Scope Of Works: A.#This Enquiry Scope Includes Installation Of Cable Trays And Laying & Termination Of Power Cables For Eight Dosing Pumps Motors In Ro Plant At Palm Jumeirah. Cable Trays And Power Cables Will Be Supplied By Dewa. B.#The At Tached Annexure- 1 Shows The Proposed Layout. However, The Prospective Supplier May Visit The Site To Understand The Detailed Scope Of Supply And Works. C.#All The Accessories Required For The Above Jobs Such As Reducers (Straight, Right, Left), Tee, Bends, Coupl Ers, Hangers, Fish Plates And Fasteners Etc. For Cable Trays Shall Be Supplied By The Contractor. All Cable Trays Shall Be Fixed With Existing Metallic Columns/Supports With Suitable Clamps And Stainless-Steel Nuts & Bolts. All The Cables Are To Be Clamped With Trays Properly With Appropriate Pvc Clamps. The Supply Of These Accessories Is In The Contractor#S Scope. D.#All The Cable Trays Sh All Be Painted With Rustproof Painting/Epoxy Paint Coating. E.#Glanding And Termination Of Power Cables Shall Be Carried Out By The Contractor. Accessories Such As Cable Glands, Cables Lugs Are In Contractor#S Scope. F.#Plant/Site Visit And Correspondence Shall B E Communicated By Email To Mr. Firoz Ahmed, Deputy Manager-Em(G), Emailfiroz.Ahmed@Dewa.Gov.Ae With Copy To Mr. Rahul Pathak, Mana Ger-Em(G), Emailrahul.Pathak@Dewa.Gov.Ae. The Contractor May Contact Mr. Firoz Ahmed Mob: 050 4238725, 050 5562685 For Technical Clarification. G.#The Works Shall Be Executed As Per The Schedule And Plant Availability, Which Will Be Communicated 3Days In Advanc E. H.#The Contractor Staff Shall Follow Safety And Security Practices Prevailing At Dewa During The Work Execution. 1 Job Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Www.Dewa.Gov.Ae/Api/Rfxdownload/Get/2332302709
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.