New Construction Of Zugspitzgrat Ridge Station (3 Planning Lots). This Announcement Is Identical To Announcement 2023/S 208657266 And Serves To Extend The Participation Deadline. Ufs Schneefernerhaus Gmbh Intends To Build A Laboratory At 2,812 M Above Sea Level. Nn To Improve The Measurement Situation At The Schneefernerhaus Research Station. The Environmental Research Station Pursues Interdisciplinary Research Approaches. The Research Station Will Have To Have A Floor Area Of Approximately 6M X 11M. Next To The Measurement Laboratory, An Open Area Is To Be Built As An Experimental Area. The Site Is Located Directly On The Ridge On Steep Terrain And Is Only Accessible By Mountaineers. Work On Site Must Be Limited To The Bare Minimum; Assembly Parts And Larger Building Materials Must Be Transported By Helicopter. Due To The Weather, The Construction Work Can Only Be Carried Out In A Limited Time Window In The Summer. Part Of The Contract In Lot 1 Is The Development Of A Proposed Solution As Part Of The Procurement Process.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.