A) The Subject Of The Order Is A Comprehensive Supply (Sale And Provision Of Distribution Services) Of High-Methane Natural Gas Type E, At A Pressure Of Up To 0.5 Mpa, To Buildings Provided By The District Office In Tarnobrzeg For Free Use By Spzzoz In Nowa D ba. B) Natural Gas Will Be Delivered To The Following Buildings: - Boiler Room No. 1 Ul. Maria Sk odowska-Curie 1A; 39-460 Nowa D ba; The Boiler Room Is Equipped With Two Gas Boilers With A Power Of 575 Kw Each, The Ordered Power Is 65 M3 / H, The Current Tariff Group W-6.1 Ta., The Measuring System Consists Of: - Bellows Reducer Type R/70 - Pulse Recorder Type Mac R4 Estimated Gas Consumption Over The Period Of 12 Months Is: 127,530 M , I.E. 1,419,820 Kwh. Starting Point Id No. Pl0031935978. - Boiler Room No. 2 Ul. Ko ciuszki 1 C; 39-460 Nowa D ba; The Boiler Room Is Equipped With A Gas Boiler With A Capacity Of 250 Kw, The Ordered Power Is 25 M3/H, The Current Tariff Group W-5A.1 Ta, The Measuring System Consists Of: - Bellows Reducer - Mac R4 Pulse Recorder Estimated Gas Consumption In The Period Of 12 Months Is 39,247 M3, I.E. 437,039 Kwh. Id Number Of The Starting Point Pl0031935964. - Boiler Room No. 3 Ul. Rzeszowska 8;39-460 Nowa D ba;The Boiler Room Is Equipped With Two Gas Boilers Of 65 Kw Each, The Contractual Capacity Is Up To 10 M3/H, The Current Tariff Group W-4, The Measurement System Consists Of: - Crs-03 Pulse Recorder - Bk-G10 Meter. Estimated Gas Consumption Over A 12-Month Period Is: 19,470 M3, I.E. 217,150 Kwh. Starting Point Id Number Pl008044480. The Branch Responsible For Psg For Each Of The Consumption Points Is The Gas Plant Branch In Jas o.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.