GTR 73208296

Tenders Are Invited For Adaptation Of Hygienic And Sanitary Rooms In The Public Building Primary School In Kaliska To The Needs Of Disabled People [Task Implemented With Support From Pfron]

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
73208296
Tendering Authority
Subscribe to view
Tender No
ZP.271.17.2023
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Adaptation Of Hygienic And Sanitary Rooms In The Public Building Primary School In Kaliska To The Needs Of Disabled People [Task Implemented With Support From Pfron]
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
15-12-2023 Closed
Work Detail
1. The Subject Of The Order Are Construction And Installation Works For The Implementation Of The Task Consisting In: Adaptation Of Hygienic And Sanitary Rooms In The Building Of The Public Primary School In Kaliska To The Needs Of Disabled People. Task Co-Financed By Pfron.2. The Subject Of The Works Is Located On Plot No. 288 In Kaliska, Kaliska District, Kaliska Commune. The Works Will Take Place In The Building Of The Public School Complex In Kaliska, Ul. Długa 53, 83-260 Kaliska.3. The Scope Of The Subject Of The Order Was Described In: 1) Architectural And Construction Design For The Project Adaptation Of Hygienic And Sanitary Rooms In The Building Of The Public Primary School In Kaliska To The Needs Of Disabled People; 2) Technical Specification For The Execution And Acceptance Of Works; 3) Bills Of Quantities And Measurements; 4 ) Of These Terms And Conditions Of The Order. Note. The Bill Of Quantities Only Serves To Assist In The Calculation Of The Offer Price By The Contractor. If Any Works Are Not Included In The Bill Of Quantities And Are Necessary For The Proper Execution Of The Order, The Contractor Should Value Them And Include Them In The Offer Price.4. The Subject Of The Order Covers The Implementation Of Only Part Of The Project - I.E. The Girls Bathroom And The Staff Bathroom. 5. The Scope Of The Subject Of The Order Includes In Particular: 1) Demolition Works: A) Removal Of Internal Plasters Made Of Cement And Lime Mortar; B) Dismantling Of Door Joinery; C) Dismantling Of Floor And Wall Cladding; D) Dismantling Of Partition Walls; E) Removing Floors; F) Breaking Down The Chess Casing;G) Scraping And Washing Off Old Paint Coatings;H) Dismantling Internal Water, Sewage And Electrical Installations.2) Masonry Works: A) Construction Of Partition Walls From Masonry Elements;B) Widening Existing Entrance Holes.3) Plastering And Internal Cladding: A) Execution Of Standard Internal Plasters, Category Iii, On The Walls; B) Execution Of Gypsum Plasters, Filling; C) Preparation Of The Surface For Wall Cladding; D) Covering The Walls With Ceramic Tiles.4) Moisture-Proof Insulation: A) Cleaning And Drying The Walls ;B) Installation Of Moisture-Proof Insulation Of Walls And Floors; C) Installation Of Waterproof Coating Insulation In Wet Rooms.5) Substrates And Floors, Floor Coverings: A) Installation Of Gres Artificial Stone Tile Floors Laid With Glue Using A Combined Method; B) Application Of A Self-Leveling And Self-Leveling Layer Leveling.6) System Walls:A) Installation Of System Walls Made Of Hpl Boards With Doors And Fittings.7) Steel Structures:A) Installation Of Steel Lintels In Places For Widening Door Openings.8) Painting Coatings:A) Preparation Of The Substrate - Walls, Steel Structures (Cleaning, Degreasing);B) Painting Plasters And Metal Surfaces (Pipes, Door Frames);C) Protective Works, E.G. Painting Foil.9) Door Joinery:A) Installation Of Internal Door Joinery;B) Minor Finishing Works On Door Frames .10) Electrical Installation:A) Execution Of Internal Electrical Installation For Basic Lighting;B) Installation Of Fire Protection Devices And Emergency Evacuation Lighting.11) Installation Of Cold And Hot Water:A) Preparatory Works;B) Execution Of Cold Water Installation;C) Execution Of Water Installation Hot Water And Its Circulation;D) Connection Of White Fittings;E) Installation Of Thermal Insulation Of Pipelines;F) Quality Control, Pressure Tests, Final Acceptance.12) Installation Of Sanitary Sewage System:A) Preparatory Works;B) Laying Of Sanitary Sewage Pipes;C ) Connecting Utilities; D) Construction Of Sewer Risers And Venting; E) Connecting The Sewage System With Gravity Drains; F) Construction Of Risers With Inspection Holes; G) Construction Of Under-Floor Sewage Systems, Taking Into Account The Groundwater Level. 13) Carrying Out Tests, Tests And Checks Of All Installations , Including Water Testing, Attaching Protocols To The As-Built Documentation As Well As Certificates, Technical Approvals, Certificates Of Use;14) Preparation Of An As-Built Cost Estimate For The Purposes Of Settling The Completed Works - Separately For Each Room;15) Preparation Of Documents Related To Putting The Investment Into Use By The Ordering Party - Execution As-Built Documentation, Taking Into Account Any Changes Occurring During The Execution Of The Works. 6. The Contractor Is Obliged To Prepare And Attach To The Offer A Bid Cost Estimate For The Task Being Performed, Containing Items Such As, Among Others: Valuation Basis, Description, Unit Of Measurement, Expenditure/Quantity, Price, Mark-Ups. In Addition, The Offer Cost Estimate Must Include A Summary After Each Section. 7. The Contractor Who Obtains An Order As A Result Of The Tender Procedure Is Obliged, On The Day Of Signing The Contract, To Submit In Paper And Electronic Form (Recorded On A Cd In Pdf Format) Detailed Cost Estimates Based On Which He Submitted The Offer And The Financial And Material Schedule For The Implementation Of The Works. Division Into Rooms.8. The Scope Of The Order Also Includes Warranty Service. The Minimum Quality Guarantee Period For The Subject Of The Order Is 36 Months, Counted From The Day Following The Date Of Final Acceptance Of The Works And The Signed (Without Comments) Final Acceptance Protocol Of Construction Works. The Offered Guarantee Period Is One Of The Criteria For Evaluating Offers In Accordance With Chapter Xix Of The Tor. 9. The Works Should Be Performed And Completed In Accordance With Applicable Standards And Regulations, In Particular: The Act Of July 7, 1994 Construction Law (Consolidated Text: Journal Of Laws Of 2023, Item 682, As Amended), Regulation Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location (Consolidated Text, Journal Of Laws Of 2022, Item 1225), Regulation Of The Minister Of National Education And Sport Of December 31, 2022 On Safety And Hygiene In Public And Non-Public Schools And Institutions (Consolidated Text: Journal Of Laws Of 2020, Item 1604), By Regulation Of The Minister Of Labor And Social Policy Of September 26, 1997 On General Occupational Health And Safety Regulations (Journal Of Laws Of 2003, No. 169, Item 1650, As Amended), Act Of April 27, 2001 Environmental Protection Law (I.E. Journal Of Laws Of 2022, Item 2556, As Amended), The Act Of December 14, 2012 On Waste (I.E. Journal Of Laws Of 2022, Item 699, As Amended) And The Requirements Of The Ordering Party.10 . The Contractor Is Obliged To Secure The Area Where The Works Will Be Carried Out Against Access By Third Parties, Especially During Classes In The School Building.11. The Management And Supervision Of Works May Be Performed By Persons Who Have The Authorizations Required By Law.12. Coordinate Construction Works With Electrical, Sanitary, Technological And Finishing Works.13. After Completing The Works, The Contractors Obligations Include Tidying Up The Work Area And Bringing The Facility To A Condition Suitable For Operation. 14. During The Duration Of The Works, The Contractor Will: 1) Keep The Work Area In Good Order, 2) Dispose Of Waste Properly - The Contractor Is Considered To Be The Producer Of Waste Generated During The Implementation Of Construction Works. Removal Of Waste, Its Use Or Disposal Are The Responsibility Of The Contractor. The Ordering Party Reserves That It Will Not Incur Any Costs For Waste Disposal, Including Fees For Economic Use Of The Environment. The Contractor Is Obliged To Attach Waste Transfer Cards To The As-Built Documentation. The Ordering Party Reserves The Right To Take Over For Storage Some Elements Subject To Disassembly. These Elements Will Be Indicated At The Stage Of Implementation Of The Subject Of The Order,3) Informed The Ordering Party About The Progress Of The Works.15. The Materials Used Must Be New And Free From Any Material, Construction Or Workmanship Defects. 16. Material, Assembly And Equipment Guidelines Required By The Ordering Party Are Included In The Documentation Referred To In Section 3 Of This Chapter. 17. The Contractor Will Select All Visible Elements, Including: Equipment, Ceramics And Tiles In Consultation With The Investor And The Supervision Inspector.18. The Ordering Party Requires That, Before Submitting An Offer, Each Of The Contractors Applying For This Contract Must Undergo A Site Visit In Order To Assess, On Their Own Responsibility, Cost And Risk, All Factors Necessary To Prepare A Reliable Offer, Including All Necessary Preparatory, Essential And Accompanying Works To Conduct Construction And Installation Works. The Ordering Party Sets Two Dates For The Contractors To Undergo The Above-Mentioned Inspection, I.E.: 1) December 5, 2023, At 9:00, Meeting Place: Zsp In Kaliska, Ul. Długa 53, 83-260 Kaliska2) December 12, 2023 At 9:00, Meeting Place: Zsp In Kaliska, Ul. Długa 53, 83-260 Kaliska. The Ordering Party Will Prepare A Report On These Activities, Including, Among Others: Information About The Vision Participants. This Document Will Be The Basis For Assessing The Fulfillment Of This Criterion By Contractors At The Offer Evaluation Stage. 19. Contractors Are Solely Responsible For Examining The Tender Specifications With Due Diligence And For Familiarizing Themselves With Any Possible Modifications To Its Provisions Issued During The Contract Award Procedure And For Obtaining Information That Will Be Necessary For The Proper Preparation Of The Offer And Proper Performance Of The Works. It Is Deemed That Submitting An Offer Means That The Contractors Are Familiar With All Relevant Acts And Other Legal Provisions In Force In The Republic Of Poland, Which May In Any Way Affect Or Concern The Activities And Activities Covered By The Offer And The Resulting Agreement.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5ae22cdf-bdf7-47a4-8efe-a8d21fc6a835.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders