The Subject Of The Order Are Construction Works Consisting In The Design, Delivery, Assembly And Commissioning Of 122 Home Sewage Treatment Plants (Hereinafter Referred To As: Po ) In The Potok Wielki Commune And 1 Sewage Treatment Plant For Public Utility Facilities Belonging To The Commune Office: Primary School Buildings, Building Complex The Commune Office And The Library Building In Potok Wielki (Hereinafter Referred To As The Sewage Treatment Plant For Public Facilities).1.1. Scope Of The Order Scope Of The Subject Of The Order: 1. Preparation Of Comprehensive Technical Documentation For 122 Epps And 1 Sewage Treatment Plant For Public Utility Facilities.2. Delivery, Assembly And Commissioning Of 122 Pieces Of Fire Protection Equipment. The Scope Of Works Includes: - Supplying Sewage From The Building To The Wwtp, - Installation Of Wwtp Equipment, - Supplying Purified Sewage To The Infiltration Point, - Construction Of A Place For Infiltration Of Treated Sewage In The Form Of A Drainage System Or An Absorption Well, - Ventilation Of The Wwtp, - Installation Of Electrical Power Supply To The Wwtp, - Technical And Technological Commissioning Of Po .3. Delivery, Installation And Commissioning Of 1 Sewage Treatment Plant For Public Buildings. The Scope Of Works For The Construction Of A Sewage Treatment Plant For Public Utility Facilities Includes: - Supply Of Sewage From Septic Tanks Located Next To The Building Complex Of The Commune Office And The Construction Of A Sewer To The Library Building To The Point Of Connection To The Sanitary Sewage System Next To The Primary School Building, Together With A Passage Under The Municipal Road, - Sewage Supply For Sewage Treatment Plant Equipment, - Modernization (Replacement) Of Part Of The Sanitary Sewage Network (On The North Side) On The Premises Of The Primary School, Approximately 70 M Long, - Installation Of A Grease Separator With A Settling Tank For The Primary School Facility, - Installation Of A Sewage Treatment Plant Using Sbr Technology With A System Discharge Of Treated Sewage Into The Drainage System, - Restoration Of The Surface On The North Side Of The School Building - Installation Of Paving Stones With An Area Of Approx. 500 M2, - Installation Of Electrical Power Supply To The Sewage Treatment Plant Equipment, - Technical And Technological Start-Up Of The Sewage Treatment Plant.4. Preparation Of As-Built Documentation Together With An As-Built Surveying Inventory.5. Performing Authors Supervision Within The Developed Project Documentation.6. Conducting Individual Training For All Users.7. Preparation And Submission Of A Detailed Operating Manual. A Detailed Description Of The Subject Of The Order Is Included In: Functional And Utility Program Constituting Annex No. 8 To The Swz And The Draft Contract.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.