Ustan-A Wagon-A (Heated-And-Mors-And-Cont.-R) Area N/Men 32.5 Sq.M. S Exhn. Layer Of Paint Protection. Container From 3 Rooms, Partition-E Produced According To Order-M, Walls Dvuhsl-E. Material Osb - N/Men 9 Mm. Bar N/Men 50 Mm*50 Mm. Horizontal Flat - Mineral Wool Insulation Thermal Conductivity N/Bol 0.04 W/Mk; - Vertical Planes - Mineral Insulation, Thermal Conductivity N/A 0.037 W/Mk. The Thickness Of Vertical Planes Is From 50 To 200 Mm (In Accordance With The Order). Floor: Thermal Insulation Of Layers. Not Less Than 100 Mm, Osb - Not Less Than 9 Mm And 18 Mm (In Accordance With The Order). Bar Not Less Than 50 Mm*50 Mm. Internal Wall Finish - Osb - N/Min 9 Mm (In Accordance With The Order). Outside Entrance. The Door Is Metal With Rubber Padding, Mineral Insulation And Insulation Thickness. N/Min 50 Mm, With Locks, Bolts And Wedges And Locks. I Am A Firefighter. The Metal Is Covered With Paint, And The Polymer Powder Is Covered. The Size And Location Of The Door According To With Order Internal 2 Doors Open, Closed With Locks, With A Key From The Outside And A Latch From The Inside. Windows Metallopl-E Povor-O-Tokidnye, With 2 M Glass-M 2 Units. Time And Place Of Mouth-And Accord. With Order Rab-Y Vyp-Ya Prov-M Brand Vvgng (Vvgng-P) Section 1.5 Mm. In Pvc Cable Channels. The Panel Is Complete With Automatic Switches Of The Va-47 Series, Automatic Switch 60-40A. Household Sockets Will Be Installed In The Premises. Tools And Equipment (In Accordance With The Order-M). Above The Entrance Doors And Lights. 3 Units Of Radiators, Installation Of A Room Heater And A Masters Degree Production At The Expense Of Post-A. The Heat Exchanger Will Insulate With Mineral Insulation And Heat Conduction Of No More Than 0.04 W/Mk, According To The Materials. With Order Installation And Delivery Of The Product To The Address. After Work, Take Out The Construction And Garbage. Installed On A Concrete Foundation. N/Min 30 Cm, The Cost Of Material Consumption And Installation Is Borne By The Supplier. The Post-K Is Obliged To Carry Out Electrical And Slave Settings, Connected To The Heat Supply System. I Will Issue A Permit Document And Send It To The Heat Supply Organization. The Connection Of The Heat Supply System Is Carried Out In The Presence Of The Heat Supply Body. The Term Of Completion Of Work Is 10 Calendar Days From The Date Of Signing The Contract And Registration. Warranty For Work And Work Is 12 Months.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.