GTR 73107308

Tenders Are Invited For Consolidation Of Land, Rzymkowice District, Korfonów Commune, Nysa Poviat, Opole Voivodeship - Construction Work - Stage Ii

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
73107308
Tendering Authority
Subscribe to view
Tender No
ZP.272.2.23.2023.RM
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Consolidation Of Land, Rzymkowice District, Korfonów Commune, Nysa Poviat, Opole Voivodeship - Construction Work - Stage Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-12-2023 Closed
Work Detail
Consolidation Of Land, Rzymkowice District, Korfonów Commune, Nysa Poviat, Opole Voivodeship - Construction Work - Stage Ii Subject Scope Of The Order: 1) Construction Of New Roads Km - 1.2172) Reconstruction And Renovation Of Agricultural Roads Km - 0.4623) Correction Of The Course And Improvement Of Parameters Technical Drainage Ditches Km - 0.2974) Construction And Reconstruction Of Culverts Pcs. - 6 List Of Roads: 1) Section Of The D-45 Road With A Length Of 1.148 Km, 2) Road D-49 With A Length Of 0.069 Km, 3) Road D-37 B With A Length 0.462 Km, 4) Section Of The D-45 Road With A Length Of 0.297 Km, 5) Construction And Reconstruction Of Culverts: P-5, P-6 - Road D-49, P-15 In The Area Of ​​T-6, T-7, T- 8 Road D-45 2. The Task Is Covered By: Investment Co-Financing From The European Agricultural Fund For Rural Development: Europe Investing In Rural Areas Aid Agreement Number No. 00002-6502-Um0800002/17 The Detailed Scope Of Works Includes: 1) Bill Of Quantities Works, 2) Design Documentation, 3) Stwioru Attention !!!!The Scope Of Works Does Not Include Reclamation Works And Tree Planting. In The Area Of ​​Planned Works, Identical Construction Works Are Already Being Carried Out By The Contractor Selected In The First Stage Of The Above Task. As Part Of The Order, The Contractor Is Also Obliged To: 1) Comply With Occupational Health And Safety Regulations, 2) Surveying Services Should Be Included In The Costs Of Carrying Out The Works. The Contractors Responsibility Is To Prepare As-Built Surveying Documentation (In 4 Copies) In Accordance With Art. 57 Of The Construction Law. The Inventory Should Be Performed Together With A List Of Basic Works, 3) The Contractor Will, On His Own, Develop A Design For Temporary And Permanent Traffic Organization And Obtain Their Approval. Based On The Approved Designs For Temporary And Permanent Traffic Organization, He Will Report Changes To The Traffic Organization To The Relevant Authorities For The Duration Of The Works And After Completion Permanent Organization Of Works, 4) Works On The Above-Mentioned Task - Carried Out On The Basis Of A Building Permit - Decision No. 831/22 Of October 28, 2022, 5) The Contractor Will Develop A Financial And Material Schedule Of Works, The Schedule Should Include The Execution Of Sections Of Roads And Ditches Together With Culverts Constituting A Closed Communication And Utility Fragment.6) The Contractor, As The Producer Of Waste Generated During The Above-Mentioned Works, Is Responsible For Its Storage And, If Necessary, Should Regulate The Formal And Legal Status In The Field Of Waste Management (Act Of December 14, 2012 On Waste, Journal Of Laws Of 2018, Item 992, As Amended),7) The Contractor Will Prepare An Inspection Report,8) Before Commencing Construction Works, The Contractor Should Familiarize Himself With The Location Of Geodetic Signs Within The Investment Area At The District Geodetic And Cartographic Center In Nysa And Protect Them Against Destruction,9) The Contractor Is To Ensure And Include In The Offer The Cost Of Archaeological And Sapper Supervision, If Necessary. Persons Performing Archaeological And Sapper Supervision Should Have Appropriate Documents/Certificates And Permits.10) Costs Of Disposal Of Soil And Rubble At The Landfill Waste Should Be Documented By Submitting Copies Of Invoices Or Other Documents To The Supervision Inspector Or The Ordering Partys Representative (Originals Available For Inspection). If The Disposal Of Soil And Debris From The Excavation Is Not Documented, The Contractor Will Receive Payment For The Removal Of Soil And Debris Up To 1.0 Km Away, Free Of Disposal Costs.11) The Contractor Will Use All Possible Financial Measures So As Not To Cause Any Inconvenience To The User During The Implementation Of The Subject Of The Contract. Technical Infrastructure, Facilities And Difficulties In Access To Public Roads, Taking Into Account Temporary Difficulties Resulting From The Technology Of Construction Works. However, Due To The Specificity Of Works In The Field - Cultivation On The Land, The Works Should Be Carried Out In Such A Way That There Is Access To The Land By Its Owners. Access To The Designated Section Of Works Must Be Maintained In A Condition No Worse Than Before The Construction Site Was Handed Over. For This Occasion, The Contractor Will Prepare Photographic Documentation, And In The Event Of Damage To Roads, Access Roads And Other Plots, The Contractor Will Pay Compensation To The Owner.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
951d75e7-1e0e-464a-a475-19020239b22f.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders