As Part Of The Investment, Works Are To Be Carried Out Including: - Replacement Of The Plain Tile Roof Covering, - Relocation Of Gutters, - Relocation Of The Lightning Protection System, - Sheet Metal Work And Construction Of A Highly Vapor Permeable Membrane, - Reconstruction Of The Staircase, Including Replacement Of Steps And Wooden Risers, Sanding Of Landings And Painting Walls And Wooden Elements; - Reconstruction Of The Ceiling Above The First Floor, Including Board Sheathing, Removal Of Plaster, Installation Of Mineral Wool Insulation And A New Floor Made Of Osb-3 Boards, - Replacement Of The Electrical Installation In The Staircase And In The Apartments, - Implementation Of Monitoring.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.