The Developed Project Envisages The Allocation Of Playgrounds And The Replacement Of All Old Facilities With New Ones. The New Facilities Will Be Placed In Place Of The Old Ones, They Will Be Installed On A Precast Concrete Pavement, Reinforced In Both Directions In Two Rows. On The Concrete Floor, It Is Planned To Stick A Shock-Absorbing Rubber Floor Made Of Plates, Glued With A Two-Component Adhesive. For Better Adhesion, The Concrete Floor Should Be Sanded. To Protect The Edges Of The Rubber Pavement, Concrete Curbs On A Concrete Base Are Provided. The Floor Covering Should Be Made Of Two Colors Staggered. The New Alleys Will Be In The Places Of The Old Ones. They Will Be Framed With Concrete Curbs On A Concrete Base And The Pavement Will Be Of Concrete Slabs. As A Base, A Stone Fraction Will Be Laid, With A Layer Thickness Of 10 Cm, On Which, After Compaction, A Sand Pad With A Thickness Of 5 Cm Will Be Laid.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.